HomeMy WebLinkAboutDAQ-2024-007388Submitted via EPA CEDRI
January 24, 2024
Director, U.S. EPA Region 8
1595 Wynkoop Street
Mail Code 8ENF – AT
Denver, CO 80202-1129
Re: Kinder Morgan Altamont LLC
Bluebell Facility, Title V Operating Permit # 1300033003
40 CFR 60 subpart OOOOa Semiannual LDAR Report
July 1, 2023 through December 31, 2023
Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the enclosed Semi-annual Report as required
by 40 CFR 60 Subpart OOOOa for the Bluebell Facility. The monitoring report covers the semi-annual
period from July 1, 2023 through December 31, 2023.
If you have any questions or concerns, please contact me by phone at (918) 588-5044 or by email at
janel_nelson@kindermorgan.com.
Sincerely,
Janel Nelson
EHS Specialist – Air Permitting/Compliance Sr II
Attachments:
OOOOa Delay of Repair report for semiannual reporting period
OOOOa Semi-Annual Report (July 1, 2023 through December 31, 2023)
Bluebell Facility Part 60 Subpart OOOOa – 60.5422a(a) Semiannual Report Template
Cc: Joe Randolph
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, Utah 84116
Electronic Submittal
REVIEWED
Initials JBR Date 4/15/2024
Comp Status Meets
File # 10219 Blue 2
Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOOa
This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOOa, Standards of
Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification, or
Reconstruction Commenced after September 18, 2015. This report covers the period from July 1, 2023
through December 31, 2023. Below is the specific information required by §60.5422a(a)-(c).
60.487a(c)(1) Process unit identification
Condensate
Fractionation
Inlet
Refrigeration
Storage
Truck Loading Rack
60.487a(c)(2)(i)-(iv), (vii)-(viii), and 60.5422a(c)
Provided in reporting template submitted via CEDRI.
60.487a(c)(2)(xi)
Please see attached. There are no active DOR components as of the end of the reporting period
(December 31, 2023). All components on DOR during the semiannual period were repaired during a
plant shutdown in July 2023.
60.487a(c)(3)
A plant shutdown occurred in July 2023.
60.487a(c)(4)
Component Type Component Count
(period ending 6/30/2023)
Component Count
(period ending 12/31/2023)
Valve 1115 1111
Pump 11 12
Connector 4621 4657
1/29/24, 10:02 AM View Report | CEDRI
https://cdxapps.epa.gov/oar-cedri-phase2/_ui/index.html#/reports/2030915/view?back=%2Fhistory&displayStart=0 1/1
Revise & Re-submit Report
CEDRI
Repor t Details
60.5422a(a) Semiannual Repor t for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT
Repor t Facility Cer tifier Revisions
Documents Download All
Name Size (kb)Date Archived
2024-01-24 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 336.3 2024-01-29 09:54:02
Repor t Submission
Information
Report Status Submitted
Certification Date 2024-01-29 09:53:51
Available in WebFIRE 2024-02-28 (30 Days)
CROMERR Activity ID _ebbf00e2-1435-4081-b4e7-136b3720f914
CROMERR Document ID 01eb0a1f-00ca-4b8d-8838-702e1204e5b3
Repor t Type
Information
Report Name 60.5422a(a) Semiannual Report
Citation 60.5422a(a) - Part 60 Subpart OOOOa - Crude Oil and Natural Gas Facilities for which
Construction, Modification, or Reconstruction Commenced after 9/18/2015
Report Type Periodic Report
Format Spreadsheet (Template v1.00)
OMB Control Number 2060-0721
CDX Help Desk Policy Questions? (cedri@epa.gov)
About CDX Frequently Asked Questions Terms and Conditions Contact Us
EPA Home Privacy and Security Notice Accessibility
Facility Record No. *
(Field value will
automatically
generate.)
Facility Name * Address of Processing
Plant*Address 2 City * County *
State
Abbreviation*Zip Code *
Responsible
Agency Facility
ID (State
Facility
Identifier)
Beginning Date of
Reporting Period *
Ending Date of
Reporting Period *
Please enter any
additional information
Enter associated file
name reference.
e.g.: ABC Company e.g.: 123 Main Street e.g.: Suite 100 e.g.: Brooklyn e.g.: Kings County e.g.: NY e.g.: 11221 e.g.: 01/01/2016 e.g.: 06/30/2016 e.g.: filename.pdf
1 Bluebell Gas Plant 5564 North 5000 West Cedarview Duchesne UT 84066 07/01/2023 12/31/2023 2024-01-24 Bluebell Semiannual LDAR Report_CEDRI Submittal.pdf
FACILITY INFORMATION ADDITIONAL INFORMATION
40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 - 60.5422a(a) Semiannual Report
The asterisk (*) next to each field indicates that the corresponding field is required.
Facility Record No. *
(Select from
dropdown list)
Month
Identification*
(Select from
dropdown list)
Number of pressure
relief devices for
which leaks were
detected *
(§60.5422a(c)(1))
Number of pressure
relief devices for
which leaks were not
repaired *
(§60.5422a(c)(2))
Number of valves for
which leaks were
detected *
(§60.487a(c)(2)(i))
Number of valves for
which leaks were not
repaired *
(§60.487a(c)(2)(ii))
Number of pumps for which
leaks were detected *
(§60.487a(c)(2)(iii))
Number of pumps for
which leaks were not
repaired *
(§60.487a(c)(2)(iv))
Number of connectors
for which leaks were
detected *
(§60.487a(c)(2)(vii),
§60.5422a(a))
Number of connectors for
which leaks were not
repaired *
(§60.487a(c)(2)(viii),
§60.5422a(a))
e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5
1 July 00400 0 0 0
1 August 00900 0 4 0
1 September 00900 0 5 0
1 October 00700 0 6 0
1 November 0 0 20 0 0 0 2 0
1 December 0 0 14 0 0 0 1 0
40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 - 60.5422a(a) Semiannual Report
The asterisk (*) next to each field indicates that the corresponding field is required.
EQUIPMENT INFORMATION
Report Date :1/23/2024
Compliance Repair Delay List
Regulation :
Begin Date :
End Date :
Compliance Group :
Tag / Drawing Class Stream ID / Stream Inspection
Date
Placed On
Delay Reason Documentation Expected
Repair
Removed
from Delay
/ /
Number of Components Delayed for Compliance Group = 0
Signature of Owner or Operator
Responsible for Delay of Repair Decision
TI_R800_3.xml Page 1 of 1
Repair Delayed History (R323)Report Date:1/23/2024
Report Parameters
Unit:All Process Units Area:All Areas
Regulation:EPA60-OOOOa Tag#:All Tags
KINDER MORGAN BLUEBELL -All Leaks 7/1/2023 12/31/2023Class:All Component Classes Leak Option:Reporting Period:
UNIT:INLET Exp.
Repair
Date:
Insp.
Date
Date
On
Delay
Date
WR
Closed
Insp.
PPM
DOR
Insp.
PPM
Date
Off
Delay:Tag#:Class Location Area:Reason For Delay Approved By
00637.03 CONECT ULTRA FAB BLDG SESD V-110
PRV
2/16/23 37197 2/21/23 37200 Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN ATWOOD -
MECHANIC
10/2/23 7/13/23 8/2/23
00637.04 CONECT ULTRA FAB BLDG SESD V-110
PRV
2/16/23 12097 2/21/23 12092 Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN ATWOOD -
MECHANIC
10/2/23 7/13/23 8/2/23
00637.02 CONECT ULTRA FAB BLDG SESD V-110
PRV BTM SVE
3/10/23 25896 3/13/23 25896 Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN ATWOOD 10/1/23 7/13/23 8/2/23
This report produced using LeakDAS.
Last modified: 4/20/2021 Page 1 of 2
Repair Delayed History (R323)Report Date:1/23/2024
Report Parameters
Unit:All Process Units Area:All Areas
Regulation:EPA60-OOOOa Tag#:All Tags
KINDER MORGAN BLUEBELL -All Leaks 7/1/2023 12/31/2023Class:All Component Classes Leak Option:Reporting Period:
UNIT:REFRIGERATION Exp.
Repair
Date:
Insp.
Date
Date
On
Delay
Date
WR
Closed
Insp.
PPM
DOR
Insp.
PPM
Date
Off
Delay:Tag#:Class Location Area:Reason For Delay Approved By
00869.00 VALVE E OF V-463 ON SKID 5 ALONG
WALK WAY LCV-463
3/10/23 1098 3/13/23 1098 Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN ATWOOD 10/1/23 7/13/23 8/3/23
This report produced using LeakDAS.
Last modified: 4/20/2021 Page 2 of 2