Loading...
HomeMy WebLinkAboutDERR-2025-005378Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name Davis County School District Address PO Box 160385 CLEARFIELD, UT 84016 Contact Davis County School District Phone Email cmkay@dsdmail.net TANK LOCATION Name DAVIS COUNTY SCHOOL DISTRICT FREEPORT WEST Address FREEPORT CENTER BLDG F-3 & F-2 CLEARFIELD, UT 84016 A Operator BRETT GURNEY Phone (801) 957-7261 B Operator GEORGE STURM Phone (385) 602-4872 Facility ID: 3000057 Inspection Date: 07/23/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Diesel Yes Steel Flex in Sump July 19, 1995 None Yes No April 12, 2016 None 2 - 3/4 Gas/Diesel Yes Steel Flex in Sump July 19, 1995 None Yes No None None 3 - 5/6 Diesel Yes Steel Flex in Sump July 19, 1995 None Yes Yes None None 4 - 7/8 Gas/Diesel Yes Steel Flex in Sump July 19, 1995 None Yes No April 12, 2016 None 5 - 5/6 Sat Diesel Yes Steel Flex in Sump July 19, 1995 None Yes No April 12, 2016 None TANK DETAILS Tank ID/Alt ID 15 / 15 E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Nov. 15, 2024 / 20000 / Substance Stored Diesel / Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod None / None Pipe type/STP Cont / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Per Prod. APST Cont. Sump / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det CP Tank Test None CP Pipe Test None 2025-07-23 Page 1 of 5 Tank ID/Alt ID 16 / 16 E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Nov. 15, 2024 / 20000 / Substance Stored Diesel / Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod None / None Pipe type/STP Cont / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Per Prod. APST Cont. Sump / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det CP Tank Test None CP Pipe Test None Tank ID/Alt ID 17 / 17 E-Gen/AST No / Yes Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Nov. 15, 2024 / 10000 / Substance Stored Diesel / Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod None / None Pipe type/STP Cont / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Per Prod. APST Cont. Sump / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det CP Tank Test None CP Pipe Test None Tank ID/Alt ID 18 / 18 E-Gen/AST No / Yes Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Nov. 15, 2024 / 10000 / Substance Stored Gasoline / Regular Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod None / None Pipe type/STP Cont / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Per Prod. APST Cont. Sump / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2025-07-23 Page 2 of 5 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 16 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 18 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 15 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 17 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes DISPENSER RESPONSES Dispenser 3/4 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2025-07-23 Page 3 of 5 Dispenser 7/8 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Sat Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Apr '25 May '25 Jun '25 Tank 15 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 16 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 17 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 18 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2025-07-23 Page 4 of 5 Prepared by fueloperator.com Inspection Information Inspector:Harris, Gary Record Created:July 23, 2025, 12:38 p.m. Inspection Date:July 23, 2025 2025-07-23 Page 5 of 5