HomeMy WebLinkAboutDERR-2025-005378Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name Davis County School District
Address PO Box 160385
CLEARFIELD, UT 84016
Contact Davis County School District
Phone
Email cmkay@dsdmail.net
TANK LOCATION
Name DAVIS COUNTY SCHOOL DISTRICT
FREEPORT WEST
Address FREEPORT CENTER BLDG F-3 & F-2
CLEARFIELD, UT 84016
A
Operator BRETT GURNEY
Phone (801) 957-7261
B
Operator GEORGE STURM
Phone (385) 602-4872
Facility ID: 3000057 Inspection Date: 07/23/2025
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Diesel Yes Steel Flex in Sump July 19,
1995
None Yes No April
12,
2016
None
2 - 3/4 Gas/Diesel Yes Steel Flex in Sump July 19,
1995
None Yes No None None
3 - 5/6 Diesel Yes Steel Flex in Sump July 19,
1995
None Yes Yes None None
4 - 7/8 Gas/Diesel Yes Steel Flex in Sump July 19,
1995
None Yes No April
12,
2016
None
5 - 5/6
Sat
Diesel Yes Steel Flex in Sump July 19,
1995
None Yes No April
12,
2016
None
TANK DETAILS
Tank ID/Alt ID 15 / 15
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 15, 2024 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod None / None
Pipe type/STP Cont / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Per Prod. APST Cont.
Sump / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det
CP Tank Test None
CP Pipe Test None
2025-07-23 Page 1 of 5
Tank ID/Alt ID 16 / 16
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 15, 2024 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod None / None
Pipe type/STP Cont / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Per Prod. APST Cont.
Sump / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 17 / 17
E-Gen/AST No / Yes
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Nov. 15, 2024 / 10000 /
Substance
Stored Diesel /
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod None / None
Pipe type/STP Cont / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Per Prod. APST Cont.
Sump / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 18 / 18
E-Gen/AST No / Yes
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Nov. 15, 2024 / 10000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod None / None
Pipe type/STP Cont / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Per Prod. APST Cont.
Sump / / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2025-07-23 Page 2 of 5
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 16 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 18 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 15 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 17 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
DISPENSER RESPONSES
Dispenser 3/4
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2025-07-23 Page 3 of 5
Dispenser 7/8
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6 Sat
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Apr '25 May '25 Jun '25
Tank 15 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 16 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 17 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 18 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2025-07-23 Page 4 of 5
Prepared by fueloperator.com
Inspection Information
Inspector:Harris, Gary
Record Created:July 23, 2025, 12:38
p.m.
Inspection Date:July 23, 2025
2025-07-23 Page 5 of 5