HomeMy WebLinkAboutDDW-2025-006579Sanitary Survey - Deficiency Report
PWS Number:UTAH26065 Deficiency Points:55 Survey Date:07/01/2025
Survey Name:ASPEN GROVE
CAMPGROUND
Surveyor:Sitara Federico
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Wells | WS001 | ASPEN GROVE WELL
61A. Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
Rule: R309-515-6(12)(d)(ix)Rule requires a pump-to-waste line connected to a sewer/storm drain to have a
minimum 12-inch clearance to the flood rim. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:Picture to be included, no clearance
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S009 PUMP TO WASTE LINE LACKS PROPER AIR GAP
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Wells | WS001 | ASPEN GROVE WELL
61B. Pump to waste line equipped with #4 non-corrodible mesh screen
Rule: R309-515-6(12)(d)(ix)The discharge end of the pump-to-waste line shall be covered with a No. 4 mesh
corrosion-resistant screen. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
Notes:No screen
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S010 END OF WELL PUMP-TO-WASTE LINE LACKS NO. 4 SCREEN
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | ASPEN GROVE WELL
71. Well discharge line has a means to measure flow.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:Still deficient - no flow meter on well discharge piping
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S026 NO FLOW METER ON WELL DISCHARGE PIPING