Loading...
HomeMy WebLinkAboutDDW-2025-006574Sanitary Survey - Deficiency Report PWS Number:UTAH20024 Deficiency Points:10 Survey Date:07/10/2025 Survey Name:MAMMOTH GS - GOOSEBERRY CAMPGROUND Surveyor:Sitara Federico Sanitary Survey Category: SM SDWIS Severity Code: Recommendation Management and Operations | DS001 | UTAH20024 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Notes: Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | MAMMOTH SPRING 66C. Spring box lid does not show evidence of a vacuum. Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes:Still deficient from last sanitary survey Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | MAMMOTH SPRING 67. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes:Still deficient from last sanitary survey Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING