Loading...
HomeMy WebLinkAboutDDW-2024-007163DREAM LOT HOME BOOSTED WATER SYSTEMS REQUIREMENTS: LOTS 146A AND 146B WILL BE LOCATED AT AN ELEVATION THAT WON'T MEET THE MINIMUM WATER PRESSURE REQUIREMENTS OF R309-105-9. THEREFORE AN EXCEPTION IS REQUESTED TO R309-105-9(3), R309-540-5(4)(C) AND R309-550-11(3) FOR INDIVIDUAL HOME BOOSTER PUMP SYSTEMS. FINAL DESIGN OF THESE SYSTEMS SHALL MEET THE FOLLOWING REQUIREMENTS: 1. A 2 INCH METERED CONNECTION LINE WILL DELIVER WATER TO AN INTERIM TANK 2. INTERIM TANK SHALL MEET THE REQUIREMENTS FOR PUBLIC WATER SYSTEMS INCLUDING HATCH, OVERFLOW, AIR VENT, AND BE NSF APPROVED 3. AN 18 INCH "AIR BREAK" SEPARATION SHALL EXIST AT TANK INLET. 4. A DOUBLE CHECK BACKFLOW ASSEMBLY IS REQUIRED PRIOR TO INLET INTO WATER TANK(S). 5. BOOSTER PUMP(S) TO MEET THE REQUIRED DEMANDS OF THE RESIDENCE. 6. SHEETS C2, M1 AND M2 SHOW DETAILS OF THE PROPOSED SYSTEM. 7. SYSTEMS SHALL ALSO MEET THE REQUIREMENTS OF MOUNTAIN REGIONAL WATER AND THE UTAH DIVISION OF DRINKING WATER AS OUTLINED BELOW: MOUNTAIN REGIONAL WATER REQUIREMENTS: 1. MRW WILL HAVE OWNERSHIP UP TO AND INCLUDING THE METER PRIOR TO THE INTERIM WATER TANKS. HOME OWNER WILL HAVE OWNERSHIP OF THE INTERIM TANK AND BOOSTER PUMP STATION FACILITY AND ALL INCLUDED EQUIPMENT. 2. INTERIM WATER TANKS, BACKFLOW ASSEMBLY, AND BOOSTER PUMP SYSTEM SHALL BE INCLUDED IN A MRW CROSS CONNECTION CONTROL PROGRAM AND INVENTORY, WITH SIGNED AGREEMENTS WITH EACH PROPERTY OWNER TO CONDUCT ROUTINE INSPECTIONS OF TANKS AND EACH CONNECTION TO ENSURE THE "AIR BREAK" BETWEEN INLET PIPE AND OVERFLOW PIPE EXISTS EFFECTIVELY AND THE CONDITION OF THE TANK, LID, AIR VENT, AND OVERFLOW SCREEN IS ACCEPTABLE. 3. THE PROPERTY OWNER WILL BE REQUIRED TO SUBMIT TESTING AND INSPECTION REPORTS FOR THE BACKFLOW PREVENTION ASSEMBLY. THE REPORTS MUST BE SUBMITTED TO MRW ANNUALLY OR AS OFTEN AS NECESSARY. 4. THE PROPERTY OWNER MUST SIGN AN AGREEMENT PREPARED BY MRW. THE AGREEMENT WILL SPECIFY THAT MRW HAS THE RESPONSIBILITY AND LEGAL ACCESS TO INSPECT THE INDIVIDUAL HOME BOOSTER PUMP INSTALLATION. MRW WILL VERIFY COMPLIANCE WITH THE REQUIRED CONDITIONS AND ASSESS THE CROSS CONNECTION HAZARD ANNUALLY. THIS AGREEMENT SHALL ALLOW MRW TO TERMINATE THE SERVICE IF THE INDIVIDUAL HOME BOOSTER PUMP AND INTERIM TANK INSTALLATION ARE NOT MAINTAINED ADEQUATELY OR POSE A HAZARD TO THE WATER SYSTEM. 5. THE PROPERTY OWNER WILL BE REQUIRED TO RECORD A FORMAL NOTICE OF THE INDIVIDUAL BOOSTER PUMP AND INTERIM TANK INSTALLATION WITH THE PROPERTY DEED AT THE SUMMIT COUNTY RECORDER'S OFFICE. THESE REQUIREMENTS WILL BE TRANSFERRED TO SUBSEQUENT PROPERTY OWNERS IN THE EVENT THE HOME IS SOLD. 6. FIRE FLOW TO BE PROVIDED BY MAIN WATERLINE HYDRANT PROVIDING 1500 GPM AT A MINIMUM OF 20 PSI RESIDUAL. UTAH DIVISION OF DRINKING WATER REQUIREMENTS: 1. INTERIM WATER TANKS SHALL BE SUBJECT TO SANITARY SURVEY INSPECTION BY THE DIVISION OF DRINKING WATER. ** ** MARCH 29, 2024 DJH DJH COLONY 146B DATE: DESIGN BY: REVIEW BY: DRAWN BY: REVISIONS: ISSUE: PROJECT NO: SHEET TITLE: SHEET NUMBER: C1 INDIVIDUAL HOME BOOSTER SYSTEM Co l o n y L o t 1 4 6 B 14 6 B W h i t e P i n e C a n y o n R d NORTHNORTH SCALE: 1'=150' SP-03 LOT 146 B UTILITY PLAN 0 15 30 60 90 SCALE: 1"=30' LOT INFORMATION LOT NO: 146 B LOT ADDRESS: 146 B WHITE PINE CANYON ROAD LOT SIZE: 5.530 AC. WHITE PINE CANYON ROAD DATE: DESIGN BY: REVIEW BY: DRAWN BY: - - REVISIONS: ISSUE: PROJECT NO: - SHEET TITLE: SHEET NUMBER: KJM BRC LOT 146B FINAL pa t h : C : \ U s e r s \ K r i s t i a n \ M D S D r o p b o x \ P r o j e c t s \ 1 1 . C o l o n y \ 0 8 _ S i t e P l a n s \ 1 6 _ L o t 1 4 6 B \ fi l e n a m e : C o l o n y L o t 1 4 6 B - U r b a n S i t e P l a n - t e m p . d w g p l o t d a t e : M a r c h 2 9 , 2 0 2 4 p l o t t e d b y : K r i s t i a n March 29, 2024 ** ** MARCH 29, 2024 DJH DJH COLONY 146B DATE: DESIGN BY: REVIEW BY: DRAWN BY: REVISIONS: ISSUE: PROJECT NO: SHEET TITLE: SHEET NUMBER: M1 PUMP STATION Co l o n y L o t 1 4 6 B 14 6 B W h i t e P i n e C a n y o n R d ** ** NOVEMBER 29, 2021 DJH DJH COLONY 146A DATE: DESIGN BY: REVIEW BY: DRAWN BY: REVISIONS: ISSUE: PROJECT NO: SHEET TITLE: SHEET NUMBER: M2 PUMP STATION ELEVATION Co l o n y L o t 1 4 6 B 14 6 B W h i t e P i n e C a n y o n R d