Loading...
HomeMy WebLinkAboutDERR-2025-005272Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities APPENDIX C-4 CONTAINMENT SUMP INTEGRITY TESTING HYDROSTATIC TESTING METHOD Facility Name: Address: City, State, Zip Code: Facility I.D. #: Testing Company: Owner: Address: City, State, Zip Code: Phone#: Phone # Date: This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the test method. Containment Sump ID Containment Sump Material Liquid and debris □Yes □Noremoved from sump?* □Yes □ 0 □Yes □No □Yes □No □Yes □No □Yes □No Visual Inspection (Nocracks. loose parts □Pass □Fail □Pass □ Fail □Pass □Fail □Pass □ Fail □Pass □ Fail □Pass □Failor separation of the containment sump.) Containment Sump Depth Height From Bottom to Top of Highest Penetration Starting Water Level Test Start Time Ending Water Level Test End Time Test Period (Minimum test time: 1 hour) Water Level Change Pass/fail criteria: Must pass visual inspection. Water level drop of less than 1/8 inch. Test Results □Pass □Fail □Pass □Fall □Pass □Fail □Pass □Fail □Pass □Fail □Pass □Fall Comments: *All liquids and debris must be disposed of properly. Tester's Name (print)_____________ Tester's Signature - ------------ pei.org •