Loading...
HomeMy WebLinkAboutDERR-2025-005269VCP/Brownfields Section - Site Visit Report SITE NAME: Airport West / North Temple Landfill SITE LOCATION: Salt Lake City DATE OF SITE VISIT: 3 July 2025 PURPOSE OF SITE VISIT: DERR (David Bird & Bill Rees) oversight of field activities at the Airport West VCP site. FIELD OBSERVATIONS: On 3 July, at ~9 am, the DERR met with ET Design (Sam Bernard) and Ninigret (Eric Rice) at the on-site construction trailer. We visited the Repository where the placement of landfill waste was proceeding. Next, we observed the pumping of leachate from the east end of cell 166, which is also near the western boundary of the new Repository. We then traveled toward the east within Phase I and observed excavation of the landfill waste at Cell 206. We then traveled to observe the WAIV unit (leachate evaporation system). The DERR left the site at ~10:55 am. After leaving the site today, the DERR stopped north of the site near the 700 North street to observe potential dust from operations there. We observed dust generated near cell 206 close to the east end of the site that appeared to exceed the 20% opacity allowable on-site. We sent an email to Ninigret when we returned to the DERR offices, notifying them of these observations and requesting modifications to their methods to remedy the situation. SPLIT SAMPLES COLLECTED: No IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? Yes, except dust control measures. See comments above.