Loading...
HomeMy WebLinkAboutDRC-2025-001851Deq submit <dwmrcsubmit@utah.gov> Fwd: ES PH3E Liner Schedule Update 1 message LLRW DWMRC <llrw@utah.gov>Tue, Jun 10, 2025 at 8:38 AM To: Deq submit <dwmrcsubmit@utah.gov> DRC ---------- Forwarded message --------- From: Shauna L. Watkins <slwatkins@energysolutions.com> Date: Mon, Jun 9, 2025 at 12:14 PM Subject: ES PH3E Liner Schedule Update To: carlo Romano (cromano@utah.gov) <cromano@utah.gov>, LLrw@utah.gov <LLrw@utah.gov>, Dave Booth <dbooth@energysolutions.com> Cc: Garrett Q. Dutson <gqdutson@energysolutions.com>, James M. Cason <jmcason@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com>, Todd L. Stewart <tlstewart@energysolutions.com>, Tab Brown <tabrown@energysolutions.com>, Curtis Kirk <ckirk@energysolutions.com>, Leon C. Baker <lcbaker@energysolutions.com>, Matt L. Heap <mlheap@energysolutions.com> Here is the latest Broken Arrow schedule to the 3E Liner. From: Garre Q. Dutson <gqdutson@energysolutions.com> Sent: Monday, June 9, 2025 9:19 AM To: Shauna L. Watkins <slwatkins@energysolutions.com>; James M. Cason <jmcason@energysolutions.com>; Marissa R. Sotelo <mrsotelo@energysolutions.com> Cc: Garre Q. Dutson <gqdutson@energysolutions.com> Subject: FW: [EXTERNAL] ES PH3E Liner Schedule Update FYI, Latest BA CAW Phase 3E Liner schedule for today’s meeting. We will discuss. Garrett Q. Dutson, PE Project Engineer IV, Clive ENERGYSOLUTIONS 299 South Main Street Suite 1700 Salt Lake City, UT 84111 Direct: 801.649.2156 6/10/25, 11:50 AM State of Utah Mail - Fwd: ES PH3E Liner Schedule Update https://mail.google.com/mail/b/AEoRXRRSIxEmw3e9IbyTstUcHqjQXierayvL3jkuBKqqCFTWA7N3/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/2 Cell: 801.721.1425 Email: gqdutson@energysolutions.com From: dcummings@brokenarrowusa.com <dcummings@brokenarrowusa.com> Sent: Monday, June 9, 2025 8:51 AM To: Garre Q. Dutson <gqdutson@energysolutions.com> Cc: kcummings@brokenarrowusa.com Subject: [EXTERNAL] ES PH3E Liner Schedule Update EXTERNAL: This message is from a NON-EnergySoluons sender, please ensure it is from a legimate source. DO NOT click links or open aachments if sender is unknown or the message seems suspicious in any way. Garrett, Please review and print if acceptable for the pre-construction meeting. I’m hitting the road now. Thanks, Dave David Cummings | SR. Vice President | Broken Arrow Inc. 8960 Clinton Landing Road | Lake Point | Utah | 84074 O: (801) 355-0527 | F: (801) 252-7501 | M: (435) 241-0010   ES PH3E Liner Schedule 09-MAY-2025.pdf 72K 6/10/25, 11:50 AM State of Utah Mail - Fwd: ES PH3E Liner Schedule Update https://mail.google.com/mail/b/AEoRXRRSIxEmw3e9IbyTstUcHqjQXierayvL3jkuBKqqCFTWA7N3/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…2/2 Energy Solutions / 2025 ES PH3E Liner Schedule Act ID Activity Description Orig Dur Rem Dur Early Start Early Finish % 02 JUN 2025 09 JUL 16 AUG 23 30 07 14 21 28 04 10 Total Calendar Days 43 *43 *09JUN25 22JUL25 0 20 Pre-Construction Meeting 0 0 09JUN25 * 0 30 Mobilization Project Support Equipment 4 4 09JUN25 12JUN25 0 40 Mine and Prepare Clay Liner Material 5 5 13JUN25 19JUN25 0 50 Establish Foundation Surface 3 3 20JUN25 24JUN25 0 60 Install Lysimeter Components 6 6 25JUN25 02JUL25 0 70 Clay Liner Load, Haul, Place, and Compact 11 11 30JUN25 15JUL25 0 80 Clay Liner Finish Grading 2 2 16JUL25 17JUL25 0 90 Berm Construction 2 2 18JUL25 21JUL25 0 100 Install Control Fence 2 2 21JUL25 22JUL25 0 110 Project Completed & Accepted 0 0 22JUL25 0 Total Calendar Days Pre-Construction Meeting Mobilization Project Support Equipment Mine and Prepare Clay Liner Material Establish Foundation Surface Install Lysimeter Components Clay Liner Load, Haul, Place, and Compact Clay Liner Finish Grading Berm Construction Install Control Fence Project Completed & Accepted Early start pointEarly finish point Early barProgress barCritical bar Summary bar Progress pointCritical point Summary point Start milestone pointFinish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 09JUN25 D.Cummings KC/SM DC 02MAY25 D.Cummings KC/SM DC Start date 02JUN25 Finish date 22JUL25 Data date 09JUN25 Run date 09JUN25 Page number 1A © Primavera Systems, Inc.