Loading...
HomeMy WebLinkAboutDDW-2025-006413 July 14, 2025 Paul Wright, P.E. District Engineer Utah Division of Drinking Water 620 South 400 East Suite 400 St. George, Utah 84770 RE: Certification of Rule Conformance, Firelight Tank, Pump Station, and Offsite Water Line Project; Firelight Tank (ST004), Firelight Pump Station (PF001), and Transmission water lines; Toquerville Town Water System, System #27018, File #12911 Dear Paul, Toquerville Town has completed the construction improvements as outlined in the Toquerville West Offsite Water plans (per the Plan Approval letter dated April 12, 2022). This letter is to indicate the Certification of Rule Conformance that all conditions of the Plan Approval were accomplished. We have visited the site to verify satisfactory completion of the project. Record Drawings are attached with this letter. Bac-T tests have been performed on the new lines, the results of which are also attached with this letter. If you have any questions regarding this letter or if you need additional information, please let me know. Sincerely, Todd Gardner, P.E. ALPHA ENGINEERING COMPANY CC: Jadee Adams, Toquerville Town ENCL (1): Record Drawings Bac-T Test Results