Loading...
HomeMy WebLinkAboutDRC-2025-001854 CLIVE SITE LETTER OF TRANSMITTAL DATE: 6/09/2025 ATTN: LLRW CC; Treesa Parker Karen Kirkwood RE: Transmittal 2025-030 Description of Documents Transmitted Qty See attached updates for Safety and Health. CL-SH-WI-101-02 Rev 3 Process for JHA Review and Revision 1 ------------------------------------------------------------------------------------------------------------ Please replace your current procedure revisions with the documents within this Transmittal. You are not required to sign any documents to verify receipt of this distribution. However, you should make every effort to ensure that your copy of the License is current. FROM: EnergySolutions Document Control Clive Facility CL-SH-WI-101-02 Process for JHA Review and Revision Revision 3 Authored By: Leon Baker, Safety & Health Manager Date Reviewed By: Joshua Cordova, Safety & Health Technician II Date Reviewed By: Thomas Brown, Radiation Safety Officer Date Approved By David Booth, General Manager Date Non-Proprietary New Proprietary Title Change Restricted Information Revision Safeguards Information Rewrite Sensitive Security Information Cancellation Leon Baker Digitally signed by Leon Baker Date: 2025.06.03 08:52:24 -06'00' Josh S. Cordova Digitally signed by Josh S. Cordova Date: 2025.06.03 10:44:42 -06'00' Thomas Brown Digitally signed by Thomas Brown Date: 2025.06.03 11:53:55 -06'00' Digitally signed by David F Booth DN: C=US, O=EnergySolutions, CN=David F Booth, E=dbooth@energysolutions.comReason: I am approving this document. Location: NA Date: 2025-06-09 06:39:27Foxit PhantomPDF Version: 9.7.5David F Booth Facility Specific Work Instruction CL-SH-WI-101-02 Process for JHA Review and Revision Non-Proprietary Page 1 of 3 1 Purpose 1.1 This work instruction is to document the process of developing, reviewing and revising Job Hazard Analysis (JHA). 2 JHA Development 2.1 JHA Development priority shall be given to new or changing jobs/tasks or jobs/tasks with the greatest risk of injury or illness. 2.2 Alliant JHA System, the Supervisors Guide to Job Hazard Analysis (ES-SH-PR- 101-R1), and Subject Matter Expert (SME’s) may be used to facilitate the development of site Job Hazard Analysis. 2.3 JHA Development shall include an initial evaluation of the task, step by step hazard evaluation, development of control measures, and JHA approval and training of affected Clive Facility personnel. 3 JHA Review 3.1 JHAs shall be reviewed by responsible managers and front-line workers at least annually, in accordance with ES-SH-PR-101. 3.2 JHA reviews will be conducted utilizing the Learning Management System (LMS) and revisions shall be documented through the Alliant JHA System. 3.3 If any concerns are brought to attention during the JHA review and cannot be resolved with the current JHA process. The JHA will need to go through a revision. 3.4 Following an incident or observation of non-compliance any applicable JHAs shall be evaluated. 3.5 Responsible managers shall be provided by Safety and Health with a Monthly JHA Review Report. . 4 JHA Revision Facility Specific Work Instruction CL-SH-WI-101-02 Process for JHA Review and Revision Non-Proprietary Page 2 of 3 4.1 JHAs shall be revised when: 4.1.1 New equipment, tools, chemicals or processes are introduced to the work environment. 4.1.2 A change in job steps / tasks / process occurs. 4.1.3 The JHA expiration date of 1 year has been reached. 4.1.4 The review process indicates the need for a revision. 5 Documentation 5.1 JHA documents shall be managed by the Alliant JHA System. 5.2 Safety & Health shall review completed revisions in the Alliant JHA System. 5.3 JHA reviews shall be tracked in the Learning Management System (LMS). 6 Attachments This Work Instruction requires no attachments. Facility Specific Work Instruction CL-SH-WI-101-02 Process for JHA Review and Revision Non-Proprietary Page 3 of 3