HomeMy WebLinkAboutDRC-2025-001260Facility White Mesa Uranium Mill - 4A Impoundment Storage Level 5592.29 ft (4/4/2025)
Date Weather crisp and sunny day
Name Representing
Heather Mickelson UDWMRC
Deen Lyman Engery Fuels Resources (USA), Inc.
N/A Not Inspected Inundated Good Monitor Maintenance Critical
Embankment
ruts/erosion X
cracks/settlements X
poor alignment X
road ruts X1
rodent burrows X2
vegetation/riprap X3
beaching/slides/cracks X3
undermining/erosion X3
rodent burrows X3
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
rodent burrows X
vegetation/riprap X
erosion X
seepage/wetness X
Abutment/Foundation
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
cracks/slumps X3
embankment drains X3
seepage/wetness X3
cracks/slumps X
embankment drains X
seepage/wetness X
8.
D
/
S
T
o
e
2.
U
/
S
S
l
o
p
e
3.
D
/
S
S
l
o
p
e
4.
G
r
o
i
n
s
5.
L
e
f
t
Ab
u
t
m
e
n
t
6.
R
i
g
h
t
Ab
u
t
m
e
n
t
7.
U
/
S
T
o
e
1.
C
r
e
s
t
Dam Safety Inspection
April 7, 2025
People Present
Detail
Element
Reservoir Basins
9. Shore Stability X
10. Reservoir Bottom X
Spillway
11. Freeboard X
12. Intake X4
13. Concrete Structures X5
14. Stilling Basin X
15. Outfall Channel X
Instrumentation
22. Monuments X
23. Staff Gage X
24. Piezometers X
25. Drains X
26. Other X
Notes
U/S = Upstream
D/S = Downstream
From: Heather Mickelson, P.E, P.G. __________________________________Date :________________
Through: Adam Wingate, Uranium Recovery Section Manager__________________________Date :________________
1. Recommend maintance to repair road ruts on crest as conditions allow.
2. Recommend continuted efforts to eradicate burrowing animals.
3. Upstream face and toe are concealed by synthetic liner.
4. System is total containment.
5. Recommend repairing the filling in cracks in concrete spillways of 4A/4B and 4A/3, as planned during the second
quarter.
Adam Wingate (Apr 17, 2025 10:12 MDT)04/17/2025
Facility White Mesa Uranium Mill - 4B Impoundment Storage Level 5579.23 ft (4/4/2025)
Date Weather crisp and sunny day
Name Representing
Heather Mickelson UDWMRC
Deen Lyman Engery Fuels Resources (USA), Inc.
N/A Not Inspected Inundated Good Monitor Maintenance Critical
Embankment
erosion X
cracks/settlements X
poor alignment X
road ruts X1
rodent burrows X2
vegetation/riprap X3
beaching/slides/cracks X3
undermining/erosion X3
rodent burrows X3
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
rodent burrows X
vegetation/riprap X
erosion X
seepage/wetness X
Abutment/Foundation
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
vegetation/erosion X
sloughs/slides/cracks X
seepage/wetness X
cracks/slumps X
embankment drains X
seepage/wetness X
cracks/slumps X
embankment drains X
seepage/wetness X
Element
Detail
Dam Safety Inspection
People Present
April 7, 2025
5.
L
e
f
t
Ab
u
t
m
e
n
t
6.
R
i
g
h
t
Ab
u
t
m
e
n
t
7.
U
/
S
T
o
e
8.
D
/
S
T
o
e
1.
C
r
e
s
t
2.
U
/
S
S
l
o
p
e
3.
D
/
S
S
l
o
p
e
4.
G
r
o
i
n
s
Reservoir Basins
9. Shore Stability X
10. Reservoir Bottom X
Spillway
11. Freeboard X
12. Intake X4
13. Concrete Structures X5
14. Stilling Basin X
15. Outfall Channel X
Instrumentation
22. Monuments X
23. Staff Gage X
24. Piezometers X
25. Drains X
26. Other X
Notes
U/S = Upstream
D/S = Downstream
From: Heather Mickelson, P.E, P.G. __________________________________Date :________________
Through: Adam Wingate, Uranium Recovery Section Manager__________________________Date :________________
1. Recommend maintance to repair road ruts on crest as conditions allow.
2. Recommend continuted efforts to eradicate burrowing animals.
3. Upstream face and toe are concealed by synthetic liner.
4. System is total containment.
5. Recommend repairing the filling in cracks in concrete spillways of 4A/4B, as planned during the second
quarter.
Adam Wingate (Apr 17, 2025 10:12 MDT)04/17/2025
Photo 1. Left abutment of Impoundment 4A. Photo taken on April 7, 2025, and is
looking northeast.
Photo 2. Left abutment of Impoundment 4A Photo taken on April 7, 2025, and is
looking west.
Photo 3. Crest at left abutment of Impoundment 4A. Photo taken on April 7, 2025,
and is looking north.
Photo 4. Crest of Impoundment 4A. Photo taken on April 7,2025, and is looking
south.
Photo 5. Crest of Impoundment 4A. Photo taken on April 7, 2025, and is looking
west.
Photo 6. Crest of Impoundment 4A. Photo taken on April 7, 2025, and is looking
east from the common abutment of 4A/4B.
Photo 7. Impoundment 4A/4B spillway. Photo taken on April 7, 2025, and is
looking north.
Photo 8. Impoundment 4A/4B spillway. Photo taken on April 7, 2025, and is
looking north.
Photo 9. Tailings beach and liner covering the southern upstream slope of
Impoundment 4A. Photo taken on April 7, 2025, and is looking north from the crest.
Photo 10. Tailings beach in Impoundment 4A. Photo taken on April 17, 2025, and is
looking south from the Impoundment 3/4A spillway.
Photo 11. Impoundment 3/4A spillway. Photo taken on April 7, 2025, and is
looking east.
Photo 12. Liner covering the southern and eastern upstream slope of Impoundment
4A. Photo taken on April 16, 2024, and is looking south.
Photo 13. Liner covering of the northern and eastern upstream slope of
Impoundment 4A. Photo taken on April 7, 2025, and is looking north.
Photo 14. Liner covering the southern and western upstream slope of Impoundment
4A. Photo taken on April 7,2025, and is looking west.
Photo 15. Southern downstream slope of Impoundment 4A. Photo taken on April 7,
2025, and is looking north from the bottom of the downstream slope.
Photo 16. Southern downstream slope of Impoundment 4A/4B at the common
abutment. Photo taken on April 7, 2025, and is looking north.
Photo 17. Crest of Impoundment 4B. Photo taken on April 7, 2025, and is looking
north.
Photo 18. Crest of Impoundment 4B. Photo taken on April 7, 2025, and is looking
west.
Photo 19. Crest of Impoundment 4B. Photo taken on April 7, 2025, and is looking
west.
Photo 20. Crest of Impoundment 4B at the impoundment’s southwest corner. Photo
taken on April 7, 2025, and is looking northwest.
Photo 21. Southern downstream slope of Impoundment 4B. Photo taken on April 7,
2025, and is looking east.
Photo 22. Southern downstream slope of Impoundment 4B. Photo taken on April 7,
2025, and is looking north.
Photo 23. Downstream right abutment of Impoundment 4B. Photo taken on April 7,
2025, and is looking north.
Photo 24. Burrowing animal holes (highlighted) next to the fence western crest of
Impoundment 4B. Photo taken on April 7, 2025, and is looking east.
Photo 25. Liner covering the northern and eastern upstream slope of Impoundment
4B. Photo taken on April 7, 2025, and is looking north.
Photo 26. Liner covering the southern and western upstream slope of Impoundment
4B at the common abutment. Photo taken on April 7, 2025 and is looking west.
Photo 27. Liner covering the northern and western upstream slope of Impoundment
4B. Photo taken on April 7, 2025 and is looking west.
Photo 28. Woody vegetation noted for removal on the north side of Impoundment
4B. Photo taken on April 7, 2025, and is looking south.