Loading...
HomeMy WebLinkAboutDERR-2025-005147Utah DEQ Underground Storage Tank Installation Notification Form www.deq.utah.gov Facility ID New UST Install [ ] Upgrade/Repair [ ] Installation Company: Contact Name: Phone: Address: Tank Owner: Address: Contact Name: Phone# Facility Name: Facility Address: Installation / Upgrade /Repair Information Est. date work will commence: Tank # Capacity Tank Material Piping Material Substance stored Check if upgrade or repair only. (Describe details below) Describe Details of Install/Upgrade/Repair in the box below (Submit a drawing/site map of work to be done) Mail completed form to: DEQ/DERR Box 144840 Salt Lake City, Utah 84114-4840 195 N. 1950 W. 1st Floor Salt Lake City, Utah Phone (801) 536-4100 Fax (801) 359-8853 Ver. 8/1/2016 State Use Only Permit Required? X Permit # _529-2026-1 _______ Base Fee $ __500 Inspection Fee* $200 x _2_ $_ 400 PST Install Fee $200 x _2 $_ 400 Total $_1300_ ___ Date Approved & Paid ___________ *Applies in non-LHD contract areas Certified Installers/Technicians on project Name Cert. # TL Exp. Date Name Cert. # TL Exp. Date Name Cert. # TL Exp. Date 36.0' D D DE F 10.0' D D STRM STRM STRM STR M STR M STR M STR M STR M STR M 28.4' P I-84 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: G-001 SITE #:PROJECT #: TI T L E : PR O J E C T I N F O R M A T I O N : TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 SNOWBASIN RESORT CONTACT: BO BOWMAN, P.E., 1301 ACADEMY CT. FORT COLLINS, CO 80524 PH#: (970) 493-7780 1.NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE/NFPA 30A, MOTOR FUEL DISPENSING FACILITIES REPAIR CODE. 2.NFPA 70, NATIONAL ELECTRIC CODE (NEC) 3.U.S. DEPT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 29 CFR 1910.206, FLAMMABLE AND COMBUSTIBLE LIQUIDS, & 29 CFR 1910.106, PERSONAL PROTECTIVE EQUIPMENT. A.UST REMOVAL GUIDANCE AND REFERENCES: 4.PEI: PUBLICATION RP1700 - RECOMMENDED PRACTICES FOR THE CLOSURE OF UNDERGROUND STORAGE TANK AND SHOP-FABRICATED ABOVEGROUND STORAGE TANK SYSTEMS. 5.API: 1604 CLOSURE OF UNDERGROUND PETROLEUM STORAGE TANKS. 6.API: 2003 PROTECTION AGAINST IGNITIONS ARISING OUT OF STATIC, AND STRAY CURRENTS. 7.API: 2015 REQUIREMENTS FOR SAFE ENTRY AND CLEANING OF PETROLEUM STORAGE TANKS. B. UST INSTALLATION GUIDANCE AND REFERENCES: 8.PETROLEUM EQUIPMENT INSTITUTE (PEI) INSTALLATION i. PUBLICATION RP 100 - RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE SYSTEMS. ii. PUBLICATION RP 300 - RECOMMENDED PRACTICES FOR INSTALLATION AND TESTING OF VAPOR RECOVERY SYSTEMS. iii. PUBLICATION RP 500 - RECOMMENDED PRACTICES FOR INSPECTION AND MAINTENANCE OF MOTOR FUEL DISPENSING EQUIPMENT. iv. PUBLICATION RP 1200 - RECOMMENDED PRACTICES FOR THE TESTING AND VERIFICATION OF SPILL, OVERFILL, LEAK DETECTION AND SECONDARY CONTAINMENT EQUIPMENT AT UST FACILITIES. 9.UNDERWRITERS LABORATORIES, INC. (UL) i. UL-1316 FIBERGLASS UNDERGROUND TANKS FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS. ii. UL-971 FRP NONMETALLIC UNDERGROUND PIPING FOR FLAMMABLE LIQUIDS. iii. UL-2039 FLEXIBLE CONNECTOR PIPING FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS. iv. UL-330 A&B HOSE AND HOSE ASSEMBLIES FOR USE WITH DISPENSING DEVICES. CGRS, INC. G-001 TITLE SHEET 0 15 20 30 SCALE IN FEET 5 10 25 C-100 CGRS INC. C-101 NORTH CONTACT: JAKE HURLBUT 1301 ACADEMY CT. FORT COLLINS, CO 80524 PH#: (970) 493-7780 CONTACT: 3925 E OLD SNOWBASIN RD HUNTSVILLE, UT 84317 PH#: (888) 437-5488 LEGEND WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E REMOVE ONE (1) 11K-GAL SPLIT-COMPARTMENT UST AND INSTALL ONE (1) 16K-GAL SPLIT-COMPARTMENT DOUBLE WALL FIBERGLASS UST FOR FLEET FUELING. THE TASKS ARE AS FOLLOWS: 1.REMOVE EXISTING FUEL ISLAND. REMOVE TWO (2) DISPENSERS AND RELOCATE FUELMASTER CARD READER FOR REINSTALL. DEMO FUEL ISLAND CONCRETE. 2.RELOCATE 2K-GAL DEF TANK FOR NEW FUEL ISLAND. 3.REMOVE ONE (1) UST. DEMO CONCRETE/ASPHALT OVER UST AREA. 4.CLOSURE PLAN AND NOTIFICATIONS TO UT DEPARTMENT OF ENVIRONMENTAL QUALITY AND WEBER FIRE DISTRICT. REQUIREMENTS INCLUDING 10-DAY NOTIFICATION. ENVIRONMENTAL SAMPLING PER UT DEQ. 5.EXCAVATE SOIL FOR NEW UST & PIPING INSTALLATION. 6.PERMIT & INSTALL ONE (1) 16K-GAL SPLIT-COMPARTMENT (4K RUL / 12K DSL) UL-2085 DOUBLE WALL FIBERGLASS UST. 7.INSTALL ANCILLARY TANK TOP EQUIPMENT. 8.INSTALL 3" OVER 2" DOUBLE-WALLED FRP PIPING & FRP SUMPS. 9.INSTALL NEW CONCRETE FUEL ISLAND & LIGHTPOLE PIERS. 10.INSTALL ONE (1) SINGLE-PRODUCT TWO HOSE DISPENSER & ONE (1) MULTI-PRODUCT TWO HOSE DISPENSER. 11.REINSTALL EXISTING 2K-GAL DEF TANK & EXISTING CARD READER. 12.INSTALL TWO (2) LIGHTPOLES ONTO FUEL ISLAND PIERS. 13.INSTALL ELECTRICAL. 14.IOTA TESTING OF PIPING & COMMISSIONING OF UST PER UT DEQ. C-201 CONCRETE PLAN 1 EXISTING UNDERGROUND STORAGE TANK (UST) G-002 BUILDING DESIGN CODES 1.2021 INTERNATIONAL BUILDING CODE (IBC) 2.2023 NATIONAL ELECTRICAL CODE (NEC) 3.2021 INTERNATIONAL FIRE CODE (IFC) 4.2021 NFPA30 5.2021 NFPA30A 6.UTAH PETROLEUM STORAGE TANK PROGRAM VICINITY MAP NO T T O S C A L E DEF (DIESEL EXHAUST FLUID) M-100 SPLIT TANK DRAWING M-200 TANK ANCILLARY EQUIPMENT M-300 FUEL PIPING DETAILS E-100 ELECTRICAL SINGLE LINE E-STOP STORM SEWER LINE (EXISTING) WATER LINE (EXISTING) STRM SPECIFICATIONS DEMO PLAN PIPING PLAN SHEET #TITLE DESIGN CODES DESIGN STANDARDS SCOPE OF WORK CONTRACTORCLIENT ENGINEER 3925 EAST OLD SNOWBASIN ROAD, HUNTSVILLE, UT 84317 NEW LOW-FLOW MULTI-PRODUCT (RUL & DSL) DISPENSER EXISTING DEF FOR RELOCATION 6/6/2025 JH 22060 29508 TI T L E S H E E T 0 5 SCALE IN MILES 1 2 3 4 EXISTING FUEL ISLAND FOR REMOVAL EXISTING 11K-GAL UST FOR REMOVAL NEW HIGH-FLOW SINGLE-PRODUCT (DSL) DISPENSER EXISTING DEF NEW LOCATION ELECTRICAL SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 C-202 CONCRETE PLAN 2 NEW UST FIRE HYDRANT NEW UST 16K-GAL DW SPLIT (4K RUL / 12K DSL) EXISTING UST CONCRETE COVER NEW LIGHTPOLE (2) T R A P P E R S L O O P R O A D HW Y 8 9 OGDE N C A N Y O N ROAD SITE 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: G-002 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E 1.0 UST, PIPING, ANCILLARY EQUIPMENT DEMOLISH & INSTALLATION 1.1 FOLLOW REQUIREMENTS FROM UT DEQ. THIRTY DAYS PRIOR TO CONSTRUCTION OBTAIN A PERMIT THROUGH A DERR CONSTRUCTION NOTIFICATION FORM & NOTIFICATIONS. 1.2 ONLY CERTIFIED UST INSTALLERS, MEETING THE MINIMUM REQUIREMENTS BE USED FOR INSTALLATIONS. WORKERS MUST BE UNDER THE DIRECT SUPERVISION OF AN INDIVIDUAL PHYSICALLY PRESENT AT THE WORK SITE WHO MEETS THE FOLLOWING REQUIREMENTS: A. THE INDIVIDUAL HAS BEEN ADEQUATELY TRAINED AS EVIDENCED BY A CURRENT CERTIFICATE OF TRAINING ISSUED BY THE MANUFACTURER(S) OF THE UNDERGROUND STORAGE TANK SYSTEM COMPONENTS. B. THE INDIVIDUAL SHALL POSSESS A CURRENT UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/RETROFITTING CERTIFICATE FROM THE INTERNATIONAL CODE COUNCIL (ICC). C. THE INDIVIDUAL SHALL BE LICENSED WITH THE UT DEQ AS AN ONSITE SUPERVISOR. 1.3 GENERAL CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF PIPING SYSTEM. GENERAL CONTRACTOR SHALL ENSURE GOOD WORKMANSHIP. 1.4 ALL FRP PIPE INSTALLATION, FITTINGS AND COMPONENTS SHALL BE DOUBLE WALLED AND FUEL COMPATIBLE, MEETING THE MOST RECENT VERSION OF UL-971 NON-METALLIC PIPING FOR UNDERGROUND FLAMMABLE LIQUIDS. MANUFACTURE MUST BE ON OR AFTER JULY 1, 2005. 1.5 METAL RIDGED AND FLEX PIPE CONNECTORS SHALL BE COMPLETELY CONTAINED AND NOT IN CONTACT WITH SOIL OR GROUNDWATER. 1.6 THE UNDERGROUND STORAGE TANK SYSTEM(S) SHALL BE COMPATIBLE WITH THE PRODUCT TO BE STORED. 1.7 THE TANK CONSTRUCTION/TESTING SHALL BE IN ACCORDANCE WITH UL-1316. 1.8 ALL CONTINUOUS MONITORING EQUIPMENT SHALL FOLLOW UT DEQ FOR TANK STANDARDS. 1.9 ALL MATERIALS TO BE USED (PIPING, SEALANT, ADHESIVE, RESINS, ETC.) SHALL BE COMPATIBLE AND USE NATIONALLY RECOGNIZED CODES. 1.10 ALL MATERIALS SHALL BE INSTALLED AS PER MANUFACTURERS' SPECIFICATIONS. 1.11 ALL SENSORS WILL BE PROPERLY MOUNTED AT THE LOW POINT IN THE SUMPS AND SECURED. 1.12 THE CONTRACTOR SHALL ENSURE THAT ALL FILLS ARE PROPERLY LABELED. 1.13 THE CONTRACTOR SHALL ENSURE THAT THE EMERGENCY SHUT-OFF SWITCH IS OPERATIONAL AND INSTALLED. 1.14 THE CONTRACTOR SHALL ENSURE THAT ON-LINE LEAK DETECTORS ARE INSTALLED ON TURBINES AND ARE OPERATIONAL. ALL LEAK DETECTORS SHALL BE PROPERLY TESTED IN LINE BY IOTA. 1.15 BEFORE THE UNDERGROUND STORAGE TANK IS PLACED IN USE, THE UST SHALL BE TESTED PER UT DEQ. 1.16 ELECTRONIC MONITOR SECURED/ACCESSIBLE TO OPERATOR AND OPERATIONAL: ENSURE THE MONITORING PANEL IS HARDWIRED THROUGH CONDUIT TO THE JUNCTION/BREAKER BOX. ENSURE SENSOR ALARMS ARE ABLE TO BE DETECTED BY THE OPERATOR. THE MONITORING PANEL SHALL BE FULLY OPERATIONAL AS PER MANUFACTURER'S SPECIFICATIONS, WITH AUDIBLE AND VISUAL ALARMS, AND A PRINTER, IF REQUIRED. 1.18 ALL MONITORING EQUIPMENT COMPONENTS HAVE TAG/STICKER AFFIXED BY LICENSED TECHNICIAN: ENSURE THE CERTIFIED TECHNICIAN HAS AFFIXED PROPER TAGS AND/ OR STICKERS ON ALL MONITORING EQUIPMENT COMPONENTS, INCLUDING THE PANEL AND EACH SENSOR. WORK SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL AGENCY INSPECTIONS. 1.19 APPLY FOR AN UNDERGROUND STORAGE TANK CERTIFICATE OF COMPLIANCE WITH UT DEQ. 2.0 SETTLEMENT NOTES 2.1 SETTLEMENT MAY CAUSE TANK DISTORTION AND SUBSEQUENT SYSTEM FAILURE. EXCAVATION AND BACKFILL MATERIAL SPECIFICATIONS MUST BE FOLLOWED. IF ANY MOVEMENT OR SETTLEMENT OR DISTORTION OCCURS, IT WILL BE PRESUMED THAT THE CONTRACTOR HAS NOT FOLLOWED PROPER INSTALLATION TECHNIQUES. THE CONTRACTOR SHALL IMMEDIATELY UNDERTAKE AT THEIR EXPENSE ANY NECESSARY CORRECTIVE ACTIONS REQUIRED TO MITIGATE THE PROBLEM AND REPLACE DAMAGED PARTS. 3.0 BACKFILL MATERIAL 3.1 BEDDING AND BACKFILL MATERIAL SHALL BE WELL WASHED MEETING ASTM D-448, ASTM C-33, AND AASHTO M-43. CONTRACTOR SHALL PROVIDE SIEVE ANALYSIS ACCEPTABLE TO CONSTRUCTION MANAGER. PEA GRAVEL WITH PARTICLES NOT LESS THAN 1/8" OR MORE THAN 3/4" DIAMETER WITH NO MORE THAN 5% PASSING A NO. 8 SIEVE. 3.2 PLACE 12" BEDDING MATERIAL SMOOTH AND LEVEL OVER EXCAVATION FLOOR. TANK MUST BE SET LEVEL. PLACE 12" BACKFILL MATERIAL EVENLY AROUND TANK. ENSURE BACKFILL IS PLACED AROUND RIBS. NO VOIDS. 3.3 HIGH WATER TABLE CONDITIONS. IN HIGH GROUNDWATER CONDITIONS FOLLOW MANUFACTURER'S INSTRUCTIONS. 4.0 ASPHALT NOTES 4.1 3" BINDER WITH AN AGGREGATE BASE 4 TO 6 INCHES (DEPENDING ON SUBGRADE) BELOW IT. 5.0 TANK DISPENSER NOTES 5.1 CONTRACTOR SHALL SECURE, ARRANGE FOR AND PAY FOR ALL NECESSARY PERMITS, INSPECTIONS, AND TESTING, UNLESS SPECIFIED DIFFERENTLY IN THE SCOPE OF WORK. 5.2 ALL INSTALLATIONS SHALL INCLUDE STAGE 1 VAPOR RECOVERY. 5.3 ALL PRODUCT AND VENT LINES SHALL BE FIBERGLASS. 5.4 INSTALL 2A:10B:C FIRE EXTINGUISHER WITHIN 25' TO 70' OF DISPENSERS. 6.0 PIPING NOTES 6.1 ALL MATERIAL WORKMANSHIP & INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH NFPA 30 & 30A. 6.2 FRP PIPING MINIMUM SEPARATION OF 4" BETWEEN PIPE, 6" MINIMUM FROM EDGE OF EXCAVATION. 6.3 PIPING SHALL BE LAID & CONTINUOUSLY SUPPORTED ON A MINIMUM OF 6" COMPACTED PEA GRAVEL BEDDING. MINIMUM 7" COVER BETWEEN SLAB BOTTOM AND TOP OF FRP PIPE/FITTINGS. 6.4 ALL VENT, VAPOR, PRODUCT PRIMARY AND SECONDARY PIPING SHALL BE FRP SMITH FIBERGLASS "RED THREAD II-A" NOV. 6.5 ALL NPT THREADED CONNECTIONS SHALL BE TREATED WITH "SEAL PIPE". 6.6 INSTALLATION CONTRACTOR SHALL BE CERTIFIED BY PIPE MANUFACTURER OR ICC FOR INSTALLATION. 6.7 VENT, VAPOR, AND PRODUCT LINES SHALL BE SLOPED BACK TO THE USTS 1/8" PER FOOT. 7.0 LINE TESTING 7.1 PRODUCT LINE TESTING SHALL BE PERFORMED PER SECTION 1.0 FROM STP TO DISPENSER SHEAR VALVE USING IOTA. 7.2 VENT AND VAPOR SYSTEM TESTED TOP OF VENT TO TANK. 7.3 TEST PRIMARY LINES TO 60 PSI FOR 1-HOUR & SOAP TEST SURFACE, FITTINGS, & JOINTS. HOLD FOR 30-MIN. 7.4 PRESSURE TEST SECONDARY LINES TO 10 PSI FOR 1-HOUR & SOAP TEST SURFACE, JOINTS AND FITTINGS FOR 30-MIN. 8.0 ELECTRICAL 8.1 ELECTRICAL DISCONNECT OF THE EXISTING TANK AND DISPENSERS. 8.2 PROVIDE AND INSTALL NEW CONDUIT AND WIRE TO THE NEW UST FOR POWER TO TWO 2-HP SINGLE PHASE STPs. 8.3 PROVIDE AND INSTALL NEW CONDUIT AND WIRE TO THE NEW UST FOR VEEDER-ROOT ATG. THERE WILL BE WIRE FOR ONE INTERSTIITAL SENSOR, TWO TANK PROBES, AND TWO STP SUMP SENSORS. 8.4 PROVIDE AND INSTALL CONDUIT AND WIRE TO TWO DISPENSERS, ONE POWER AND ONE UDC SENSOR CONDUIT EACH. 8.5 PROVIDE AND INSTALL CONDUIT AND WIRE TO CONNECT THE DISPENSERS. 8.6 PROVIDE AND INSTALL CONDUIT AND WIRE FOR ONE CARD READER. 8.7 PROVIDE AND INSTALL CONDUIT AND WIRE TO POWER ONE DEF TANK/DISPENSER UNITS. ABBREVIATIONS AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY & TRANSPORTATION OFFICIALS ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS ATG AUTOMATIC TANK GAUGE BMP BEST MANAGEMENT PRACTICE DEF DIESEL EXHAUST FLUID DERR DEPARTMENT OF ENVIRONMENTAL RESPONSE & REMEDIATION DSL DIESEL FRP FIBERGLASS REINFORCED PLASTIC GAL GALLONS HP HORSEPOWER ICC INTERNATIONAL CODE COUNCIL IFC INTERNATIONAL FIRE CODE IOTA HELIUM LEAK DETECTION TESTING NPT NATIONAL PIPE TAPER OPS DIVISION OF OIL & PUBLIC SAFETY PSI POUNDS PER SQUARE INCH RUL REGULAR UNLEADED GASOLINE SQFT SQUARE FEET STP SUBMERSIBLE TURBINE PUMP UDC UNDER DISPENSER CONTAINMENT UST UNDERGROUND STORAGE TANK UT DEQ UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SP E C I F I C A T I O N S SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 D D STRM STRM STRM STRM STRM STR M STR M STR M STR M STR M STR M 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: C-100 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 LEGEND WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E DEMO NOTES: A.ALL EXISTING UTILITIES MUST BE IDENTIFIED PRIOR TO CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR CONFIRMATION OF UTILITY LOCATIONS THROUGH 811 AND PRIVATE LOCATOR AS NEEDED. B.ALL DEMO SHALL FOLLOW THE CITY OF HUNTSVILLE CODE & DEMOLITION PERMITS. THE DEMOLITION INVOLVES A NONRESIDENTIAL STRUCTURE SMALLER THAN 4,000 SQUARE FEET. C.THE SITE SHALL BE FENCED WHEN OPEN HOLES IN THE GROUND EXIST. D.PAVEMENT AND CURBING WILL BE REPAIRED TO MATCH EXISTING DRAINAGE CONDITIONS. E.CONTRACTOR SHALL ENSURE THAT EXCAVATION AND ALL WORK THERIN MEETS OSHA REQUIREMENTS. F.EXISTING UST & PRODUCT PIPING PER UT DEQ PIPE & TANK CLOSURE. TANK SHALL BE SAMPLED IN MINIMUM THREE LOCATIONS. PIPING SHALL BE SAMPLED APPROXIMATELY EVERY 20', OR PIPING DIRECTION CHANGE. KEYED NOTES: 1.LIMITS OF EXCAVATION. DEMOLISH, REMOVE AND DISPOSAL OF CONCRETE & ASPHALT. 2.EXISTING UST & CONCRETE COVER FOR REMOVAL. 3.EXISTING CONCRETE ISLAND WILL BE SAWCUT, DEMOLISHED, AND REMOVED AS NEEDED. 4. EXISTING PRODUCT PIPING WILL BE EXCAVATED AND REMOVED AS NEEDED. 5. EXISTING DEF REMOVED AND SET ASIDE FOR REINSTALL. 6. ADDITIONAL EXCAVATION FOR NEW UST INSTALL. 7. ADDITIONAL EXCAVATION FOR NEW FUEL ISLAND. STORMWATER NOTES: A.EROSION CONTROL PRACTICES WILL COMPLY WITH MINIMUM BEST PRACTICES FOR EROSION CONTROL, AND SHALL COMPLY WITH CITY OF HUNTSVILLE BMPs. B.SITE ACTIVITIES SHALL BE CONDUCTED TO PREVENT TRANSPORT OF ANY POLLUTANTS OR CONTAMINATED WATER. C.EROSION & SEDIMENTATION CONTROL DEVICES WILL BE INSTALLED AS NEEDED AND INSPECTED PRIOR TO ANY GRADING ON SITE. D.IF EROSION & SEDIMENTATION CONTROL DEVICES ARE INSTALLED, THEY MUST BE CHECKED AFTER EACH STORM EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED HALF CAPACITY OF DEVICE. NO T T O S C A L E 0 8 16 SCALE IN FEET UST FOR REMOVAL EXISTING UST EXCAVATION AREA (APPROXIMATE) DISPENSER FOR REMOVAL STORMWATER FLOW DIRECTION TI T L E : PR O J E C T I N F O R M A T I O N : BUILDING P P EXISTING PRODUCT PIPING FOR REMOVAL (APPROXIMATE) ISLAND & EXISTING PIPING EXCAVATION (APPROXIMATE) STRM STORM SEWER LINE SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 DE M O P L A N D P P P P P P P P P P P P P P 2 3 4 1 45' 38' 5 6 7 NEW ISLAND LOCATION NEW UST LOCATION WATER LINE D D D E F P P P PPP P P P P P P P P P P P P P P P P P 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: C-101 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 LEGEND P P DIESEL PRODUCT PIPING TO BE INSTALLED (DSL) VENT PIPING WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E 0 4 8 SCALE IN FEET TI T L E : PR O J E C T I N F O R M A T I O N : SCHEDULE NOTES: A AUTOMATIC TANK GAUGE (ATG) V VENT F FILL PORT I INTERSTITIAL PORT REGULAR UNLEADED PIPING TO BE INSTALLED (RUL)P P 6/6/2025 JH 22060 29508 PI P I N G P L A N SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 7' MIN NEW LOW-FLOW MULTI-PRODUCT (RUL & DSL) DISPENSER NEW HIGH-FLOW SINGLE-PRODUCT (DSL) DISPENSER NEW UST 16K-GAL DW SPLIT (4K RUL / 12K DSL)WATER LINE STORM SEWERSTRM STORM BASIN FIRE HYDRANT A S S A I F FV V S SUBMERSIBLE TURBINE PUMP (STP) C3 C-202 NEW FUEL ISLAND 4" BOLLARD TYP (10) LIGHTPOLE (2) UST PORT CONCRETE BOLLARD 4" VENT STACK DEF TITEN HD DISPENSER (4) 0.5"TITEN HD EQUIPMENT DISPENSER UDC & DEF SYSTEM (4) 0.5" ANCHORAGE ANCHORS W/ 3" EMBEDMENT ANCHORS W/ 3" EMBEDMENT ANCHOR SUPPORT (4) ANCHORS EACH 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: C-201 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E DISPENSER ISLAND SIDEVIEW NTS C 2 ANCHORING NTS C 5 TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 CO N C R E T E P L A N 1 BOLLARD DETAIL NTS C 3 DISPENSER ISLAND TOPVIEW NTS C 1 4'-6" 6" 10' 36' 4' 3'-6" MIN SLOPE MIN 1/4" PER FOOT 3" GRADE 4" CONCRETE FILLED STEEL 18" LIGHTPOLE 2'Ø TYP (2) ENGINEERING FILLREBAR #5 8" O.C. VERT. TYP (14) REBAR #5 12" O.C. HORIZ. TYP (5) REBAR #5 12" O.C. VERT. TYP (4) REBAR #5 8" O.C. HORIZ. TYP (5) REBAR #4 12" O.C. HORIZ. TYP (29) REBAR #5 12" O.C. HORIZ. TYP (5) REBAR #5 12" O.C. HORIZ. TYP (5) CONCRETE LID 6" TO BE POURED SEPARATELY SECOND 4,500 PSIREBAR #4 12" O.C. BOTH WAYS 3" TYP 3" TYP REBAR #5 12" O.C. HORIZ. TYP (5) REBAR #4 12" O.C. VERT. TYP (29) C8 C-202 C7 C-202 CONTROL JOINT NTS C 6 SIKAFLEX CONTROL JOINT SEALANT 1/2" 3/8" SAWCUT 1/2-INCH DEEP 8-HOURS AFTER POUR 3/8-INCH BACKER ROD (OPTIONAL) ENGINEERING FILL 3" OVER-EXCAVATE NATIVE SOIL RECOMPACTED TO 90% 12" 6" 8" TYP REBAR #4 12" O.C. VERT. TYP (29) 24" 36" PIPING SLEEVE NTS C 4 C4 C-202 12" MIN 4" TYP 12" MIN PIPING PENETRATION SLEEVE TYP (2) 30" 18" 12" 82" REBAR #5 8" O.C. VERT. TYP (14) REBAR #5 TYP (2) 30' 5' 6"Ø STEEL PIPE TYP (2) REBAR #3 TYP CONCRETE 4,500 PSI REBAR #5 TYP (1) 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: C-202 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E LIGHTPOLE SIDEVIEW NTS C 7 TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 CO N C R E T E P L A N 2 UST CONCRETE COVER NTS C 9 CONCRETE COVER DETAIL NTS C 10 48' 6'-0" #4 REBAR @12" O.C. INSTALLED THROUGH MANWAY SKIRT TAB TYP (2) #5 REBAR @ 12" O.C. 3" FROM TOP OF CONCRETE 3'-0" #4 REBAR @ 12" O.C. TYP (5) SAWCUT CONTROL JOINT 6' X 8' TYP 8" 2" #5 @ 12" O.C. BOTH WAYS 4,500 PSI CONCRETE 12' C 9 C 9 C 5 C 5 PEA GRAVEL LIGHTPOLE TOPVIEW NTS C 8 24" 62" REBAR #3 @ 3" O.C. TYP (4) CHAMFER 1/2" EXPANSION JOINT 1/2" W/ FUEL RESISTANT CAULK (AS NEEDED) REBAR #5 TYP (6) REBAR #3 CLOSED LOOP STIRRUPS @12" O.C. ELECTRICAL CONDUIT FUEL ISLAND COPPER CLAD GROUND ROD 3/4" X 8' COPPER GROUND #2/0 ATTACHED TO FUEL ISLAND REBAR J-BOLT (4) ASTM A-153 1"Ø 36" LONG J-BOLT (4) ASTM A-153 1"Ø 36" LONG LIGHTPOLE AS SPECIFIED 2" CONCRETE 4,500 PSI REBAR #5 VERTICAL (6) 8" BOLT CIRCLE 4" POLE REBAR #3 CLOSED LOOP STIRRUPS @ 12" O.C. 36" LONG FUEL ISLAND 6" CONCRETE LID CONCRETE: CONCRETE USE UST COVER FUEL ISLAND COMP. STRENGTH f'c (psi)4,500 4,500 EXPOSURE CLASS F3 F3 CEMENT TYPE I I MAX RATIO w/cm 0.45 0.45 AIR CONTENT 6.0 (+/-) 1.5%6.0 (+/-) 1.0% SLUMP LIMIT 4" 4" a.AGGREGATE SIZE 3/4" b.ALL CONCRETE WORK AND REINFORCEMENT SHALL COMPLY WITH ACI BUILDING CODES LATEST EDITION UNLESS NOTED ELSEWHERE ALL EXPOSED EDGES SHALL HAVE 3/4 INCH CHAMFER. c.PORTLAND CEMENT SHALL CONFORM TO ASTM C150 FOUNDATION: A.ASSUME MAXIMUM SOIL DESIGN PRESSURE 2,000 PSF B.UNUSUAL SITE SOIL CONDITIONS (CLAY OR DISPOSAL FILL) SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. C.ENGINEERING FILL / PEA GRAVEL SHALL BE PLACED ON OVER-EXCAVATED SOIL RE-COMPACTED TO 95% STANDARD PROCTOR DENSITY. COMPACTION SHALL MEET A MINIMUM OF 2,000 PSF. REINFORCEMENT: A.ALL REINFORCEMENT SHALL BE DEFORMED BARS CONFORMING TO ASTM A616, GRADE 60. B.REINFORCEMENT PROTECTION SHALL HAVE 3 INCHES OF CONCRETE. C.ALL REINFORCEMENT TO BE HELD SECURELY IN PROPER POSITION IN ACCORDANCE WITH THE LATEST EDITION OF ACI-318. SPECIAL INSPECTION: (PER IBC 2021 CHAPTER 19) A.CONCRETE WORK WITH STRENGTH > 2500 PSI EXCEPT NON-STRUCTURAL SLAB OR GRADE (HOUSEKEEPING PAD). IBC 1904.2 B.REBAR INSPECTION. C.CONCRETE COMPRESSION STRENGTH TESTING ASTM C31. COLLECT THREE (3) 6"Ø CYLINDERS FOR 7-DAY & 21-DAY TESTING. D.ANCHOR PLACEMENT & INSTALLATION. IBC 1704.3.2 CBC TABLE 1705.3 MECHANICAL ANCHORS. 24"Ø ITEM NO. QTY. DESCRIPTION 16 6 ANCHOR STRAP ASSEMBLY (8FT DWX TANK) PART NO. - ITEM NO. QTY. DESCRIPTION 1 2 3 4 5 6 7 8 9 1 2 1 10 11 12 13 14 15 1 9 6" 152 2 3/8" 61 42" 1067 SUMP HT. TYP. 10 6 2 MONITOR FITTING, DRY, 4IN, 8FT 10FT KIT_FITTING, CS, 4, H, SINGLE, 8FT DWX (WITH CS STRIKER PLATE) KIT_FITTING, CS, 4, F, 24 DUPLEX, 8FT DWX (WITH CS STRIKER PLATE) 2 KIT_MANWAY DW ASSY, 22IN, CS, ON 8FT DWX TANK (WITH CS STRIKER PLATE) 2 GASKET, MANWAY, 22IN, 1/8IN THK, HC-60 1 KIT_MANWAY COVER, CS, 22IN, 4-4IN H (0, 90, 180, 270), TYPE F 1 KIT_MANWAY COVER, CS, 22IN, 3-4IN H (0, CTR, 180), TYPE C 2 KIT_COLLAR, SW, 42IN, UNTRIMMED 1 SUMP, SWFS, 42IN DIA, 42IN HT, 36IN WT, NO MONITOR, FIELD LAM KIT 1 SUMP, SWFS, 42IN DIA, 42IN HT, 36IN WT, NO MONITOR, FIELD LAM KIT KIT_LIFT LUG, ON BENT PLATE, 8" X 10", 8' (ADHESIVE) KIT_STEEL GUIDE LUG 2 DEADMEN, PREFAB CONCRETE, 12INX12INX16FT LONG (4FT, 6FT, 8FT) 2 DEADMEN, PREFAB CONCRETE, 12INX12INX12FT LONG (4FT, 6FT, 8FT) 2 DEADMEN, PREFAB CONCRETE, 12INx12INx16FT LONG (4FT, 6FT, 8FT) PART NO. C310140 C310021 C310204 C600391 C430020 C330030 C330021 C600018 - - C340009 C340014 C820008 C820007 C820008 12 12 16 3/4" 425 TYP. 13 15 51 3/8" 1305 100 1/2" 2553 FRONT ELEVATION 87 1/2" 2223 67" 44'-4 3/4" 13532 1702 91 1/4" 2318 83 3/4" 2127 INDUSTRY SALES M101 FUEL MARKETS THIRD ANGLE PROJECTION MANAGER PROPRIETARY AND CONFIDENTIAL CARY ETTER THIS DRAWING IS THE PROPERTY OF MATTR CORP. THE COPYRIGHT/ OWNERSHIP OF THIS DRAWING IS AND WILL REMAIN WITH MATTR CORP. THE PHYSICAL POSSESSION OF THIS DRAWING DOES NOT CONVEY THE RIGHT TO USE ITS DESIGN CONCEPT, OR TO REPRODUCE IT, OR TO MANUFACTURE IN WHOLE OR IN PART THE ITEM(S) DEPICTED HEREIN WITHOUT WRITTEN PERMISSION AND AUTHORIZATION OF MATTR CORP. UNITS: INCH [mm] DATE: MM/DD/YY DRAWN BY: --- APPR. BY: --- APPR. DATE: MM/DD/YY DESCR:8FT DWX MC UL CAP. 12,000-4,000 USG SIZE DWGNO. B CGRS SHEET: 2 OF 3 - FRONT ELEVATION REV. 0 FI L E L O C A T I O N : Z: \ D R A F T I N G \ T A N K B U I L D E R E X P O R T E D F I L E S LA S T S A V E D D A T E : T U E S D A Y , M A R C H 1 1 , 2 0 2 5 7 : 4 2 : 0 3 P M 12 , 0 0 0 U S G , C O M P - A 4, 0 0 0 U S G , C O M P - B 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: M-100 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 SP L I T T A N K D R A W I N G K T SYP H O N LU 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: M-200 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 TA N K A N C I L L A R Y E Q U I P M E N T UST & APPURTENANCES DETAILS NTS M 1 FILL SUMPATG VENT RUL SUMP TO VENT STACK VAPOR RETURN FILL SUMP STL SUMPINTERSTICE DEADMAN TIE DOWN (6) STP ATG DEF TANK DI E S E L UN L E A D E D 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: M-300 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 FU E L P I P I N G D E T A I L S UDC DETAILS - LOW FLOW NTS M 2 UDC DETAILS - HIGH FLOW NTS M 3 DISPENSER NTS M 4 DISPENSER ISLAND PRODUCT PIPING SUMP PENETRATION M 5 DISPENSER ISLAND NTS M 6 VENT STACK NTS M 7 REDUCER SHOWN IN OPEN POSITION 2" FRP ADAPTER BELL X NPT MALE FIBERGLASS REINFORCED PIPING SUMP WALL FRONT FACING BENNETT DISPENSER PIPING UNION SENSOR 3" OVER 2" D.W. FRP3" OVER 2" D.W. FRP 2" PRIMARY WITH 3" SECONDARY PENETRATION NOTE: SHEAR SECITON OF EMERGENCY SHUT- OFF VALVE IS TO BE EVEN WITH THE TOP OF THE PUMP ISLAND NOTE: SHEAR SECITON OF EMERGENCY SHUT- OFF VALVE IS TO BE EVEN WITH THE TOP OF THE PUMP ISLAND UNISTRUT STRUCTURE FOR VENT STACKS ISLAND FLOOR 10' OPW 3: NORMAL VENT WITH RAIN GUARD (2) BENNETT DISPENSER - DSL (HIGH FLOW)BENNETT DISPENSER - RUL & DSL (LOW FLOW) LIGHT POLE LIGHT POLE KEY CARD DISPLAY VENT STACK STRUCTURE DISPENSER ISLAND CONCRETE PAD ISLAND - TOP DOWN NTS M 8 DEF TANK LIGHT POLE DISPENSER CARD READER LIGHT POLE DISPENSER 24" 12" VENT STACKS 72" 197" 120" 12" 6" 36" 30" 20" 5- FOOT RADIUS BETWEEN LIGHT HEAD AND VENT 13 0 1 A c a d e m y C o u r t , F o r t C o l l i n s C O 8 0 5 2 4 T e l : ( 9 7 0 ) 4 9 3 - 7 7 8 0 w w w . c g r s . c o m DATE:DRAWN BY: SHEET: E-100 SITE #:PROJECT #: TH E U S E O F T H E S E D R A W I N G S A N D S P E C I F I C A T I O N S S H A L L B E R E S T R I C T E D T O T H E OR I G I N A L U S E F O R W H I C H T H E Y W E R E P R E P A R E D . R E U S E , R E P R O D U C T I O N , MO D I F I C A T I O N O R P U B L I C A T I O N , I N W H O L E O R I N P A R T , I S P R O H I B I T E D W I T H O U T TH E W R I T T E N C O N S E N T O F T H E E N G I N E E R O F R E C O R D A N D C G R S , I N C . RE V DA T E RE V I S I O N S DE S QC A B C D E A B C D E 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 WA R N I N G : T H I S D R A W I N G M A Y H A V E B E E N R E D U C E D FR O M I T S O R I G I N A L S C A L E NO T T O S C A L E TI T L E : PR O J E C T I N F O R M A T I O N : 6/6/2025 JH 22060 29508 SN O W B A S I N R E S O R T 39 2 5 E O L D S N O W B A S I N R O A D HU N T S V I L L E , U T 8 4 3 1 7 EL E C T R I C A L S I N G L E L I N E NOTES 1.PVC CONDUIT, WITH LAST 5 FEET TO BE PVC COATED GRC 2.ALL CONDUIT SYSTEMS TO CONFORM TO NEC ARTICLE 514. 3.WIRING IN HAZARDOUS AREAS SHALL COMPLY WITH THE CODE PROVISIONS FOR THOSE AREAS. 4.CIRCUIT DISCONNECT - EACH CIRCUIT LEADING TO OR THROUGH A HAZARDOUS ZONE SHALL BE ROUTED THROUGH A CIRCUIT DISCONNECT THAT SHALL SIMULTANEOUSLY DISCONNECT ALL CONDUCTORS OF THE SUPPLY CIRCUITS, INCLUDING THE NEUTRAL CONNECTOR. 5.CONTRACTOR TO VERIFY TERMINATION LOCATIONS WITH EQUIPMENT SUPPLIER. 6.ALL CONDUCTORS TO BE COPPER, THHN/THWN-2 90C TYPE. 7.ALL UNISTRUT TO BE GALVANIZED. 8.SEE ALSO MANUF. EQUIPMENT DRAWINGS. PANEL SCHEDULE NO LOAD CHANGES. REMOVE AND REPLACE FUEL PUMPS, DISPENSERS AND EQUIPMENT WITH LIKE FOR LIKE EQUIPMENT. MDP 3ɸ,480/277V 400/3 125A Panel E 3ɸ, 208/120V 400/3 MAIN TRANSFORMER 500KVA 3ɸ 480V/277V 60A UTILITIES GENERATOR Panel E1 SINGLE LINE DIAGRAM