Loading...
HomeMy WebLinkAboutDDW-2025-006322Sanitary Survey - Deficiency Report PWS Number:UTAH09051 Deficiency Points:15 Survey Date:07/09/2025 Survey Name:PANGUITCH LAKE GENERAL STORE Surveyor:Brent Arns Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | WELL NO. 2 67. Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) Notes:No Smooth nosed sampling tap Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S023 NO SMOOTH NOSED SAMPLING TAP ON DISCHARGE PIPING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | WELL NO. 2 69. Well discharge line has a pressure gauge. Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. Notes:No pressure gauge Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S025 NO PRESSURE GAUGE ON WELL DISCHARGE PIPING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | WELL NO. 2 71. Well discharge line has a shut-off valve (last item from the well head). Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. Notes:No shutoff valve Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S027 NO SHUT OFF VALVE ON WELL DISCHARGE PIPING