Loading...
HomeMy WebLinkAboutDWQ-2025-005553July 10, 2025 Jody Edwards American Pacific Corporation (AMPAC) 10622 West 6400 South Cedar City, UT 84720 Subject: WECCO Evaporation Pond #2 Approval to Use Dear Mr. Edwards: The Division of Water Quality (“Division”) issued a Construction Permit for theWECCO Evaporation Pond #2on October 7, 2024. The construction has been completed and a Certification Report prepared by GEM Engineering, Inc.was received on June 23, 2025. TheCertification Report was signed and stamped by Robert W. Corry, P.E. a Utah certified Professional Engineer (P.E.). The Division has completed the review of that Certification Report and everything looks good. A final inspection of the pond was completed on May 16, 2025. At that time the fencing around the pond had not been installed. It has now been completed and Mr. Edwards sent photos of that fencing. Based on the final inspection and the review of theCertification Report, DWQ approves the use of theWECCO Evaporation Pond #2. If you have any questions about this letter please contact me at (801) 536-4353 or wwcampbell@utah.gov. Sincerely, Woodrow W. Campbell, P.E. Environmental Engineer Ground Water Section WWC/DLB/ Attachments:DWQ-2025-005544 AMPAC WECCO Pond 2 Final Inspection 5-16-25 (includes pictures of the new fence) cc: Via EmailPaul Wright, DEQ District EngineerJeremy Roberts, Southwest Utah Public Health DepartmentRobert Corry, GEM Engineering, Inc