Loading...
HomeMy WebLinkAboutDERR-2025-005056GEORGE STURM UTAH STATE FUEL NETWORK 4315 S 2700 W SALT LAKE CITY, UT 84129 RE:Request for Petroleum Storage Tank Records UDOT HQ RAMPTON, located at 4501 S 2700 W, SALT LAKE CITY Facility Identification No. 4001151 Dear GEORGE STURM: PST operators are required to ensure that certain tests are conducted for their tank system. Dates highlighted in "Yellow" - tests are due soon. Dates highlighted in "Red" - tests are due and you are out of compliance. Tank ID/Alt ID Description LTT -------------------- LLD Spill Bucket -------------------- Overfill Tank or Flex -------------------- Pipe CP ATG -------------------- Sump 1/1 Gasoline-Regular-15000 5/9/2025 N/A N/A 5/9/2025 5/9/2025 N/A N/A N/A 2/2 Gasoline-Midgrade-15000 5/9/2025 N/A N/A 5/9/2025 5/9/2025 N/A N/A N/A 3/3 Diesel-Diesel #2 (U.L.S.)-8000 5/9/2025 N/A N/A 5/9/2025 5/9/2025 N/A N/A N/A LTT - Line Tightness Test LLD - Line Leak Detector Overfill ±Overfill Device Tank or Flex/Pipe CP - Corrosion Tests ATG ±Automatic Tank Gauging Sump - Tank Top Sump and applicable Dispenser Sumps Please note that UDC tests are not listed, but are required on your facility's next sump test cycle starting July 1, 2023, if applicable. Also, effective immediately pressure vent valves must be tested every three years for gasoline tanks. Please submit a copy of the required tests to the DERR within 30 days of the date due. If you have any questions please call Melissa Ottley at 801-536-4100. 195 North 1950 West - Salt Lake City, UT Mailing Address: - P.O. Box 144840 - Salt Lake City, UT 84114-4840 Telephone (801) 536-4100 - Fax (801) 359-8853 - T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper June 02, 2025 State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Tim Davis Executive Director DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION Brent H. Everett Director APPLIED ENVIRONMENTAL SERVICES, L.C. PO BOX 1073 BOUNTIFUL, UTAH 84011 801-540-9258 TEI 5000 NON VOLUMETRIC, TEI 4000 VOLUMETRIC, TEI ULLAGE, TEI LT3 PRECISION TANK & LINE TEST RESULTS SUMMARY INVOICE ADDRESS:TANK LOCATION: WORK ORDER # TECH # 94027 TECHNICIAN: SM STATE TECH # STATE FUEL NETWORK PO BOX 141152 SALT LAKE CITY, UTAH 84141-1152 UTAH DOT HQ (RAMPTON) 4501 SOUTH 2700 WEST SALT LAKE CITY, UTAH 25046 UT 0121 DATE: 5-22-2025 TIME START: 10:30 TIME END: 17:00 GROUNDWATER DEPTH: N/A DW TKS TANK TANK CAPACITY 14976 14976 7812 PRODUCT R/UL R/UL DSL TANK PASS PASS PASS VENT PASS PASS PASS PRODUCT LINE PASS PASS PASS LINE LEAK DETECTOR PASS PASS PASS WATER IN TANK 0.0" 0.0" 0.0" PUMP TYPE PRESS PRESS PRESS TANK MATERIAL DWF DWF DWF 1. 2. 3. 4. 5. 6. PRODUCT LINES TESTED AT 50 PSI FOR 15 MIN LINE RATES (GPH) 1. 2. 3. 5. 6. R/UL -.008 R/UL -.010 EAST DSL -.013 ADDITIONAL INFORMATION: CERTIFIED TECHNICIAN SIGNATURE:DATE:5-22-2025 These systems meet all requirements set forth by USEPA 40 CFR and has received third party certification. 4. TEST METHODS USED FOR THIS LOCATION TEI 5000 NON VOLUMETRIC TANK TEST TEI 4000 VOLUMETRIC TANK TEST TEI TANK ULLAGE TEST TEI LT3 LINE TESTX X LINE LEAK DETECTOR TYPE & SIMULATED LEAK RATE 1. 2. 3. M = MECHANICAL E = ELECTRONIC # = (GPH) RATE 4. 5. 6. M 3 M 3 M 3 All tests were performed according to manufacturer protocol, and within the common practices of the industry. However due to the variables of tightness testing, these results cannot be guaranteed. There are no warranties expressed, written or implied. DEQ ID#4001151 Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2025.06.04 10:40:59 -07'00' Reason: I am the author of this document STATE FUEL NETWORK PO BOX 141152 SALT LAKE CITY, UT 84141-1152 (801) 619-7232 GAS STATION INSPECTION REPORT Facility ID# Facility Name and Site Address: Date: Purpose:Regular______Reinspection_____Complaints______Annual Inspection ______ Nu m b e r Te s t e d Sa t i s f i e d Re j e c t e d Ad j u s t e d Pumps tested for calibration Water tests/Fuel storage Storage tanks properly labeled Fill caps and underground storage covers-good Fuel filters on pumps Overfill prevention valves Security seals intact MOTOR FUEL PRODUCTS USED FOR INSPECTION Regular_____ gallons Unleaded Regular_____ gallons Unleaded Plus_____ gallons Unleaded Premium_____ gallons Diesel_____ gallons Product was returned to fuel storage tanks. Inspection Remarks: Received by:Inspected by:Steven B. Martin UT0121 Applied Environmental Services L.C. ACTION TAKEN UTAH DOT HQ (RAMPTON) 4501 SOUTH 2700 WEST SALT LAKE CITY, UTAH 5-22-2025 4001151 X XX X X X X Dispenser Continuity Test UTAH DOT HQ ( RAMPTON ) 4501 SOUTH 2700 WEST SALT LAKE CITY, UTAH 4001151 STATE FUEL NETWORK APPLIED ENVIRONMENTAL SERVICES PO BOX 141152 SALT LAKE CITY, UT BRETT GURNEY 385-602-4872 801-540-9258 5-22-2025 1 R/UL RED J FX X 24 14 125 2 8 1 X X X X 2 R/UL RED J FX X 24 13 125 1 8 1 X X X X STEVEN B MARTIN 3 DSL RED J FX1DV X 25 10 125 1 7 1 X X X X Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2025.06.04 12:04:38 -07'00' Reason: I am the author of this document AUTOMATIC TANK GAUGE OPERATION INSPECTION Facility Name: Address: City, State, Zip Code: Facility I.D. # Testing Company: Owner: Address: City, State, Zip Code: Phone # Testers Phone # Date: This procedure is to determine whether the ( ATG) is operating properly. See PEI/RP1200 Section 8.2 for the proper inspection procedure. Tank Number Product Stored: ATG Brand and Model 1. Tank Volume, gallons 2. Tank Diameter, inches 3. After removing the ATG from the tank, has it been inspected and any damaged or missing parts replaced? 4. Float moves freely on the stem without 5. Fuel float level agrees with the value programmed into the console? 6. Water float level agrees with the value programmed into the console? 7. Inch level from bottom of stem when 90% alarm is triggered. 8. Inch level at which the overfill alarm activates corresponds with value programmed in the gauge? 9. Inch level from the bottom when the water float first triggers an alarm. 10. Inch level at which the float alarm activates corresponds with value programmed in the gauge? If any answers in Lines 3,4,5, or 6 are "NO" the system has failed the test. TEST RESULTS Comments: Testers Name: Steven B. Martin Testers Signature: UTAH DOT HQ ( RAMPTON ) 4501 SOUTH 2700 WEST SALT LAKE CITY, UTAH 4001151 AES UTAH TESTER # UT 0121 STATE FUEL NETWORK PO BOX 141152 SALT LAKE CITY, UTAH 84141-1152 BRETT GURNEY 385-602-4872 801-540-9258 5-22-2025 1 R/UL TLS 300 14976 118 YES YES YES YES 98 YES 2.0 YES 2 R/UL TLS 300 14976 118 YES YES YES YES 98 YES 2.0 YES PASS PASS PASS 3 DSL TLS 300 7812 88 YES YES YES YES 75 YES 2.0 YES BATTERY BACKUP FUNCTIONS PROPERLY, SETUP REPORT PRINTED Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2025.06.04 10:42:35 -07'00' Reason: I am the author of this document