HomeMy WebLinkAboutDWQ-2025-005544
Date:
May 16, 2025
Time:
1:00 PM
Facility:
AMPAC
Permit #:
UGW210002
Address:
West of Cedar City
County:
Iron
Facility Representatives:
Jody Edwards
DWQ Representatives:
Woodrow Campbell
Reason for Inspection:
Final Pond Inspection WECCO Pond 2
Weather Conditions:
Fair and Warm
CONSTRUCTION INSPECTION
General Comments:
Closing Conference:
Signature
Copy Sent to Facility
Yes
Woodrow Campbell, P.E.
Environmental Engineer
Groundwater Protection Permitting
Utah Division of Water Quality
wwcampbell@utah.gov
Photos
Panoramic View of Pond Water in the bottom from recent storms.
Pipe into leak detection sump.
Piping into pond
Close up of patch with testing markings
Pictures of the new fence provided by Jody Edwards