Loading...
HomeMy WebLinkAboutDWQ-2025-005499VICINITY MAP (N.T.S.) PROJECT SITE LOST CREEK STATE PARK STATE OF UTAH CONSTRUCTION DOCUMENTS NOVEMBER, 2024 DFCM PROJECT NO. 22087510 PREPARED BY MATT BOYER DATE DFCM CAPITAL DEVELOPMENT ASSISTANT DIRECTOR CHASE PRINCE DATE STATE PARKS CONSTRUCTION PROGRAM MANAGER APPROVALS DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT CAPITOL HILL COMPLEX 450 STATE STREET, STE 4110 SALT LAKE CITY, UT 84114 (801) 957-7230 PROJECT MANAGER DATE CODY HOWICK, P.E. ASSISTANT PROJECT MANAGER DATE RYAN DEVITT, P.E. PL O T : 20 2 4 - 0 8 - 1 3 1 1 : 3 5 P M PA T H : L : \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ G E N E R A L . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP G003 G004 GENERAL NOTES SURVEY CONTROL & REFERENCE G002 ABBREVIATIONS & LEGEND LANDSCAPE SITE PLAN INDEX TO CIVIL SHEETS G001 COVER & SHEET INDEX VICINITY MAP, SYMBOL, LEGEND, NOTES, & CODE REQUIREMENTS FLOOR PLANS SCHEDULES & LEGENDS INDEX TO ARCHITECTURAL SHEETS AJ601-AJ604 AE101-AE106 1453 S. DIXIE DRIVE, STE 150 ST. GEORGE,UT 84770 435.986.0100 PROJECT SITE CIVIL ENGINEER CIVIL SCIENCE INC. 1453 S. DIXIE DRIVE, STE 150 ST. GEORGE,UT 84770 PHONE: 435.986.0100 CONTACT: RYAN DEVITT EMAIL: RDEVITT@CIVILSCIENCE.COM BUILDING ARCHITECT AJC ARCHITECTS 1703 E 1700 S #3170 SALT LAKE CITY, UT 84105 PHONE: 801.466.8818 CONTACT: HEBER SLABBERT EMAIL: HSLABBERT@AJCARCHITECTS.COM STRUCTURAL ENGINEER CIVIL SCIENCE INC. 1453 S. DIXIE DRIVE, STE 150 ST. GEORGE,UT 84770 PHONE: 435.986.0100 CONTACT: TREVOR GARDNER EMAIL: TGARDNER@CIVILSCIENCE.COM MECHANICAL ENGINEER WHW ENGINEERING, LLC. 8619 SANDY PKWY SANDY, UT 84070 PHONE: 801.466.4021 CONTACT: JACOB SUTCH EMAIL: JACOBS@WHW-ENGINEERING.COM LANDSCAPE ARCHITECT DHM DESIGN CORPORATION 900 S BROADWAY # 300 DENVER,CO 84770 PHONE: 970.385.4219 CONTACT: LEE PETTY EMAIL: LPETTY@DHMDESIGN.COM ELECTRICAL ENGINEER BNA CONSULTING 393 E RIVERSIDE DRIVE, STE 202 ST. GEORGE,UT 84790 PHONE: 435.628.3670 CONTACT: IAN MADISON EMAIL: IMADISON@BNACONSULTING.COM LOST C R E E K R D . ROOF PLANSAE111-AE122 EXTERIOR ELEVATIONSAE201-AE206 INTERIOR ELEVATIONSAJ211-AJ216 BUILDING SECTIONSAJ301-AJ306 RANGER HOUSE GRADINGCG106-CG107 CD101-CD102 DEMOLITION PLAN LS101-LS102 CG108-CG110 WATERLINE PLAN & PROFILECU106-CU109 CAMPGROUND UTILITIESCU101-CU105 LS501-LS505 LANDSCAPE DETAILS CHRIS HARAMATO DATE LOST CREEK STATE PARK MANAGER TANK SITE GRADING Know what'sbelow. before you dig.Call CU501-CU504 UTILITY DETAILS G2-G7 CAMPGROUND GRADINGCG101-CG104 EVAPORATION POND GRADINGCG105 RANGER HOUSE UTILITIESCU113 CAMPGROUND SITE PLANCS101-CS102 EVAPORATION POND SITE PLANCS103 TANK SITE PLANCS105 RANGER HOUSE SITE PLANCS104 Fx. 21182 1 50 STW RWD PB G-001 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K CO V E R & S H E E T I N D E X WELL & PUMP HOUSE EQUIPMENTCW501 TANK PLAN, NOTES, & DETAILSCT501-CT508 WALL SECTIONS/VERTICAL CIRCULATIONAJ311-AJ313 AREA 'A' PLANS INDEX TO ELECTRICAL SHEETS E0.01-E0.03 SYMBOLS, SCHEDULES, & NOTES E1.01 OVERALL SITE PLAN E2.01-E2.21 AREA 'B' PLANSE3.01-E3.21 AREA 'C' PLANSE4.01-E4.22 ONE-LINE DIAGRAMSE5.01-E5.03 PANELBOARD SCHEDULES ELECTRICAL DIAGRAMSE6.01-E6.03 E5.11 DETAILSAJ501-AJ503 MECHANICAL DETAILS INDEX TO MECHANICAL SHEETS MG001 MECHANICAL LEGEND AND GENERAL NOTES ME101-ME106 FLOOR PLANS ME501-ME502 MECHANICAL SCHEDULESME601 PLUMBING DETAILS PG001 PLUMBING LEGEND AND GENERAL NOTES PE001-PE106 FLOOR PLANS PE501-PE502 PLUMBING SCHEDULESPE601 PLUMBING ISOMETRICSPE901-PE904 PLANTING PLANLP101-LP103 LARGE & SMALL RESTROOM BUILDING PLAN INDEX TO STRUCTURAL SHEETS S1.1 GENERAL STRUCTURAL NOTES SR2.1-SR3.1 RANGER RESIDENCE PLANSH2.1-SH3.3 STRUCTURAL DETAILSS8.1-S8.3 CS501-CS502 SITE DETAILS ASSEMBLIESAE010 MECHANICAL ISOMETRICSME901-ME902 ED.01 ELECTRICAL DEMOLITION SITE PLAN INDEX TO LANDSCAPE SHEETS ENTRY KIOSK PLANSE2.1 POND DRAIN PLAN & PROFILECU110-CU112 CULVERT PLAN & PROFILECU114 STRUCTURAL ENGINEER MJ STRUCTURAL 5673 S. REDWOOD RD, STE 22 TAYLORSVILLE, UT 84123 PHONE: 801.905.1097 CONTACT: MATT JACKSON EMAIL: MJACKSON@MJSTRUCTURALENGINEERS.COM PUMP HOUSE STRUCTURAL PLANS & DETAILSS101-S701 8/14/24 8/14/24 8/14/22 PUMP HOUSE PLANS, ELEVATIONS, SECTIONS, & DETAILSA010-G010 PROJECT MANAGER DATE CODY HOWICK, P.E. ASSISTANT PROJECT MANAGER DATE RYAN DEVITT, P.E. 11/11/24 11/11/24 11/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 CONFORMED SET MAY, 2025 呁之 5 呁之 呁之 5 RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D ABBREVIATIONS AC ACRE AGGR AGGREGATE ALT.ALTERNATE APPR.APPROXIMATELY AR MH AIR RELEASE MANHOLE ARV AIR RELEASE VALVE AS AS SHOWN ASSY.ASSEMBLY ASTM AMERICAN SOCIETY FOR TESTING MATERIALS AVE AVENUE BFV BUTTERFLY VALVE BFO BURIED FIBER OPTIC BH BORE HOLE BITUM.BITUMINOUS BK BACK BLV BALL VAVLE B.O.BY OTHERS BOA BEGINNING OF ALIGNMENT BOP BEGINNING OF PROJECT BTEL BURIED TELEPHONE BVC BEGIN VERTICAL CURVE C&G CURB AND GUTTER CB CATCH BASIN C-C CENTER TO CENTER CF CUBIC FEET CFS CUBIC FEET PER SECOND CI CAST IRON CIP CAST IRON PIPE CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEANOUT CONC.CONCRETE CONSTR.CONSTRUCTION CSV CURB STOP VALVE CU COPPER CY/CU YD CUBIC YARD DBL DOUBLE DI DUCTILE IRON DIA/D DIAMETER DIP DUCTILE IRON PIPE DR DRIVE DWG DRAWING E.EAST EA.EACH EF EACH FACE EG EXISTING GRADE EP EDGE OF PAVEMENT ELEC. ELECTRICAL ELEV.ELEVATION ELOH OVERHEAD ELECTRICAL EOA END OF ALIGNMENT EOP END OF PROJECT EQ EQUAL ESMT EASEMENT EVC END VERTICAL CURVE EW EACH WAY EX.EXISTING EXT.EXTENSION FES FLARED END SECTION FH FIRE HYDRANT FL FLOWLINE FM FORCE MAIN FO FIBER OPTIC FT.FOOT/FEET GALV.GALVANIZED GB GRADE BREAK GR GRATE GV GATE VALVE HDPE HIGH-DENSITY POLYETHYLENE HOR.HORIZONTAL HP HIGH POINT HYD.HYDRANT IN.INCH I.D.INSIDE DIAMETER INS.INSULATION INV.INVERT LB.POUND LEN.LENGTH LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM MFG.MANUFACTURER MH MANHOLE MIN.MINIMUM MJ MECHANICAL JOINT MON.MONUMENT N.NORTH NO.NUMBER NTS NOT TO SCALE O.C.ON CENTER O.D.OUTSIDE DIAMETER OH OVERHEAD PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PI POINT OF INTERSECTION PL PROPERTY LINE POLY POLYETHYLENE POT.POTABLE PP POWER POLE PRC POINT OF REVERSE CURVATURE PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION PUE PUBLIC UTILITY EASEMENT RAD RADIUS RCP REINFORCED CONCRETE PIPE REQ'D REQUIRED ROW RIGHT-OF-WAY RR RAILROAD RT RIGHT S.SOUTH SAN SANITARY SCH.SCHEDULE SD STORM DRAIN SDR STANDARD DIMENSION RATIO SF/SQ FT SQUARE FEET SHT SHEET SIM.SIMILAR SPA SPACES SS SANITARY SEWER ST STREET ST. STL STAINLESS STEEL STA STATION STD STANDARD SY/SQ YD SQUARE YARD TEL TELEPHONE TBC TOP BACK OF CURB TBR TO BE REMOVED TW TOP OF WALL TYP.TYPICAL UEC UNDERGROUND ELECTRIC UTBC UNTREATED BASE COURSE VAR.VARIES VERT.VERTICAL W WEST WL WATER LINE LEGEND EXISTING PROPOSED MAJOR CONTOUR MINOR CONTOUR GRADING CUT LINE GRADING FILL LINE GRADE TO DRAIN EDGE OF PAVEMENT EDGE OF GRAVEL STREET CENTERLINE RIGHT-OF-WAY LINE PROPERTY LINE SECTION LINE SECTION CORNER PUBLIC UTILITY EASEMENT TEMPORARY CONSTRUCTION EASEMENT FIELD FENCE SANITARY SEWER MAIN (SIZE AS NOTED) SANITARY SEWER MANHOLE WATER MAIN (SIZE AS NOTED) TEE CROSS GATE VALVE PRV AIR VAC FITTING STUB / CAP HYDRANT WATER METER PRESSURIZED IRRIGATION PRESSURE IRRIGATION SERVICE/VALVE STORM DRAIN PIPE (SIZE AS NOTED CULVERT WITH FLARED END SECTION STORM DRAIN MANHOLE STORM DRAIN CURB INLET STREET LIGHT SIGN (SINGLE POLE, 2 OR MORE POLES) IMPROVEMENT ELEVATIONS CONCRETE ASPHALT PAVEMENT BASE COURSE CRUSHER FINES NATURAL GROUND ENVIRONMENTAL AREA SECTION CALL-OUT SYMBOL UNDERGROUND ELECTRIC LINE OVERHEAD ELECTRIC LINE GAS LINE POWER POLE GUY WIRE ANCHOR ELECTRICAL BOX OR LOCKER 4 D1 SECTION / DETAIL NUMBER SHEET WHERE DRAWN TBC ELEV: xxxx.xx G G E CUT FILL 18501850 18501850 PL O T : 2 0 2 4 - 0 8 - 1 3 1 1 : 3 5 P M PA T H : L : \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ G E N E R A L . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP Fx. 21182 2 50 STW RWD PB G-002 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K AB B R E V I A T I O N S & L E G E N D 8/14/22 ARCHITECTENGINEER STAMP 11/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 PL O T : 2 0 2 4 - 0 8 - 1 3 1 1 : 3 5 P M PA T H : L : \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ G E N E R A L . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP GENERAL 1.THE LOST CREEK STATE PARK PROJECT IS DESIGNED IN ACCORDANCE WITH DFCM DESIGN STANDARDS, HIGH PERFORMANCE BUILDING REQUIREMENTS, AND ENHANCED ACCESSIBILITY REQUIREMENTS (ABAAS). IF ANY DISCREPANCIES SHOULD ARISE BETWEEN DFCM STANDARDS AND THESE DRAWINGS, DFCM STANDARDS SHALL GOVERN. SEE ARCHITECTURE SHEET G4 FOR CODE ANALYSIS. 2.STANDARD DRAWINGS & SPECIFICATIONS: ALL CONSTRUCTION SHALL CONFORM TO "APWA MANUAL OF STANDARD PLANS" AND SPECIFICATIONS (LATEST EDITION) UNLESS SPECIFIED OTHERWISE. CONTRACTOR SHALL OBTAIN COPIES OF SAID STANDARDS AND APPLICABLE DETAILS PRIOR TO CONSTRUCTION AND HAVE COPIES ON SITE DURING CONSTRUCTION. 3.PROPERTY & CONSTRUCTION LIMITS: ALL CONSTRUCTION WORK INCLUDING VEHICLES, EQUIPMENT, MATERIALS, ETC. SHALL BE KEPT WITHIN EXISTING RIGHT-OF-WAY AND EASEMENTS OF THE PROJECT BOUNDARIES. CONSTRUCTION IS INTENDED TO BE WITHIN PROPERTY LIMITS, ROADWAY RIGHT-OF-WAY OR EASEMENTS. ANY WORK BEYOND CONSTRUCTION LIMITS IS TO BE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN WRITTEN RIGHT OF INGRESS AND EGRESS SHOULD THEY VENTURE ONTO PRIVATE PROPERTY WHICH IS NOT INCLUDED IN ACQUIRED RIGHTS-OF-WAY AND EASEMENTS. 4.EXISTING IMPROVEMENTS: CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PRESERVE AND PROTECT EXISTING STRUCTURES, WALLS, DRIVEWAYS, TRAFFIC SIGNS, WATERWAYS, FENCES, LANDSCAPING, TREES, RIPRAP, DITCHES, ASPHALT AND CONCRETE TRAILS, CURB AND GUTTER, MAILBOXES, SIDEWALK, AND OTHER IMPROVEMENTS. ANY SUCH IMPROVEMENTS REMOVED OR DAMAGED BY CONTRACTOR'S ACTIVITY SHALL BE REPLACED OR REPAIRED TO ORIGINAL OR BETTER CONDITION ACCORDING TO THE SPECIFICATIONS OF THE GOVERNMENTAL ENTITY HAVING JURISDICTION, AT THE SOLE EXPENSE OF THE CONTRACTOR. 5.TESTING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED INSPECTION AND TESTING. WORK CONCEALED WITHOUT THE REQUIRED INSPECTION OR TESTING SHALL BE SUBJECT TO EXPOSURE AT THE CONTRACTOR'S SOLE EXPENSE. 6.NON-CONFORMING WORK: WORK PERFORMED WHICH IS NOT IN CONFORMANCE WITH THE DRAWINGS AND/OR SPECIFICATIONS OR WITHOUT OWNER OR ENGINEER REPRESENTATIVE'S APPROVAL SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S SOLE EXPENSE. 7.WORK HOURS & CONSTRUCTION NOISE: THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO DAYLIGHT HOURS ONLY AND NO CONSTRUCTION WORK WILL BE ALLOWED ON SATURDAYS, SUNDAYS, OR HOLIDAYS OBSERVED BY THE OWNER UNLESS OTHERWISE APPROVED BY THE OWNER OR ENGINEER'S REPRESENTATIVE. 8.OSHA COMPLIANCE: IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL OSHA REGULATIONS AND STANDARDS ARE COMPLIED WITH ON THE PROJECT SITE DURING THE CONSTRUCTION PERIOD. 9.EPA COMPLIANCE: THE CONTRACTOR SHALL MEET ALL DEPARTMENT OF ENVIRONMENTAL QUALITY AND U.S. EPA REQUIREMENTS. 10.CONSTRUCTION ACTIVITIES: IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PERFORM CONSTRUCTION ACTIVITIES PER THE CONTRACT DOCUMENTS. ANY ADDITIONS, DELETIONS, OR MODIFICATIONS SHALL FIRST MEET WITH THE WRITTEN APPROVAL OF THE OWNER OR ENGINEER'S REPRESENTATIVE. 11.SETTLEMENT: CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY SETTLEMENT OF EXCAVATIONS, AND ANY DAMAGE OF UTILITIES RESULTING FROM SETTLEMENT. 12.SURVEY MONUMENTS: CONTRACTOR SHALL NOT DESTROY, REMOVE, OR DISTURB ANY EXISTING SURVEY MONUMENTS WITHOUT AUTHORIZATION OF CONTROLLING AGENCY. NO PAVEMENT CUTTING OR REMOVAL SHALL BEGIN UNTIL ALL SURVEY MARKERS OR MONUMENT POINTS THAT HAVE THE POTENTIAL OF BEING DISTURBED BY THE CONSTRUCTION OPERATIONS HAVE BEEN PROPERLY REFERENCED BY A REGISTERED LAND SURVEYOR. ALL SURVEY MONUMENTS OR POINTS DISTURBED BY THE CONTRACTOR SHALL BE ACCURATELY RESET BY A REGISTERED LAND SURVEYOR AFTER ALL RESTORATION AND RESURFACING HAS BEEN COMPLETED. 13.LANDSCAPE RESTORATION: CONTRACTOR SHALL STRIP, STOCKPILE, AND REPLACE EXISTING TOP SOIL (MINIMUM TOP 12 INCHES OF MATERIAL) WITHIN THE TRENCH CUT. CONTRACTOR SHALL GRADE AND RESTORE GROUND MATCHING OR EXCEEDING ORIGINAL LANDSCAPING CONDITIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: TOPSOIL, GRASS, TREES, CONCRETE TRAIL, BOLLARDS, SPRINKLERS AND LANDSCAPE ROCKS, BARK AND VEGETATION. COORDINATE WITH OWNER ON LANDSCAPING PRIOR TO RESTORATION. 14.DISCREPANCIES, OMISSIONS AND CONFLICTS: THE CONTRACTOR SHALL NOTIFY THE OWNER OR ENGINEER'S REPRESENTATIVE OF ANY DISCREPANCIES, OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE DRAWINGS AND/OR SPECIFICATIONS BEFORE PROCEEDING WITH RELATED WORK. 15.CONSTRUCTION TIMELINE: THE CONTRACTOR RECOGNIZES THAT TIME IS OF THE ESSENCE WITH THIS PROJECT AND SHALL SELECT AND UTILIZE LABOR, EQUIPMENT, AND MATERIALS THAT MINIMIZE THE CONSTRUCTION TIMELINE. THE CONTRACTOR SHALL ALSO REGULARLY APPRISE THE OWNER OR ENGINEER'S REPRESENTATIVE OF THE ELEMENTS REQUIRING LONG LEAD, INSTALLATION OR CURE TIMES. 16.PRE-CONSTRUCTION DOCUMENTATION: PRIOR TO CONSTRUCTION, THE CONTRACTOR IS REQUIRED TO DOCUMENT WITH DIGITAL PHOTOGRAPH OR VIDEO THE EXISTING CONDITIONS OF THE PROJECT SITE INCLUDING BUT NOT LIMITED TO: DRIVEWAYS, WALL, FENCES, SIDEWALKS, ROADWAYS, UTILITIES, TREES, LANDSCAPING AND ALL OTHER ELEMENTS THAT WILL BE DISTURBED BY CONSTRUCTION. THE DOCUMENTATION MUST BE PROVIDED UPON THE REQUEST OF THE OWNER OR ENGINEER'S REPRESENTATIVE. 17.INCIDENTAL WORK: WORK INTENDED BY THE DRAWINGS AND SPECIFICATIONS, BUT NOT SPECIFICALLY IDENTIFIED IN A PARTICULAR BID ITEM SHALL BE CONSIDERED INCIDENTAL TO THE OTHER BID ITEMS. 18.LEGAL DISPOSAL: ANY DEBRIS RESULTING FROM THE PROJECT IS TO BE DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DISPOSAL SITES AT WHICH DEBRIS MAY BE LAWFULLY WASTED. UTILITIES 1.EXISTING UTILITIES: UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION PROVIDED BY OTHERS, AND SHOULD BE CONSIDERED APPROXIMATE AND FOR GENERAL INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE TO LOCATE AND PROTECT ALL UTILITIES IN THE PROJECT AREA, INCLUDING THOSE THAT MAY NOT BE SHOWN OR THAT MAY BE SHOWN INCORRECTLY. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE REPAIR OF ANY UTILITY DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS. RELOCATIONS AND/OR REPLACEMENTS OF EXISTING UTILITIES SHALL BE COORDINATED BY THE CONTRACTOR WITH THE UTILITY OWNER. CONTRACTOR SHALL CONTACT, SCHEDULE, AND ESTABLISH UTILITY SHUT DOWN TIMES AND DETERMINE THE RELOCATION AND/OR REPLACEMENT REQUIREMENTS OF EXISTING UTILITIES PRIOR TO THE START OF ANY WORK. 2.UTILITY FIELD VERIFICATION: CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND INVERT ELEVATIONS OF EXISTING MANHOLES, PIPE SIZES AND OTHER UTILITIES BEFORE CONSTRUCTING ANY NEW SEWER, WATER, STORM DRAIN OR OTHER UTILITY LINES. REPORT ANY DISCREPANCIES BETWEEN EXPECTED LOCATION AND ACTUAL LOCATION TO THE OWNER OR ENGINEER'S REPRESENTATIVE IMMEDIATELY. 3.ALIGNMENT & DEPTH: LAY PIPE TO DEPTH OR SPECIFIC SLOPE AND ALONG HORIZONTAL ALIGNMENT AS DEFINED IN THESE DRAWINGS. CONTRACTOR SHALL NOT DEVIATE FROM PROPOSED ALIGNMENT OR DEPTH. GRAVITY PIPE INSTALLATION SHALL REQUIRE LASER GRADE LINE BE USED AND WILL BE CHECKED PRIOR TO ANY PIPE ACCEPTANCE. 4.UTILITY IMPACTS: AVOID EXISTING UTILITIES WHERE POSSIBLE. WHERE IMPACTS TO UTILITIES ARE EXPECTED OR ENCOUNTERED, COORDINATED RELATED CONSTRUCTION ACTIVES AND REQUIRED UTILITY MODIFICATION WITH UTILITY OWNERS AND OWNER OR ENGINEER'S REPRESENTATIVE. THE CONTRACTOR SHALL INFORM AND COORDINATED PLANNED PROJECT CONSTRUCTION WITH ALL UTILITY OWNERS WITHIN PROJECT AREA PRIOR TO CONSTRUCTION. 5.FLOW DIVERSION: CONTRACTOR WILL BE REQUIRED TO DIVERT WATER OR WASTEWATER OF EXISTING FLOWS AS NECESSARY FOR FULL DURATION OF PROJECT. 6.UTILITY SHUTDOWN: ALL UTILITY SHUTDOWNS REQUIRE AT LEAST 72 HOURS IN ADVANCE OR AS REQUIRED BY UTILITY COMPANY. 7.TRENCH OPERATIONS: CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMANCE WITH LOCAL AND FEDERAL CODES GOVERNING SHORING AND BRACING OF EXCAVATIONS AND TRENCHES. CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF THE PUBLIC AND PROTECTION OF PERSONNEL AND WORKERS. TRENCH SUPPORTS AND DEWATERING SHALL BE RESPONSIBILITY OF THE CONTRACTOR. MAXIMUM OPEN TRENCH DURING WORK HOURS SHALL BE 200 FEET AND ALL TRENCHES SHALL BE BACKFILLED AND/OR PLATED DURING NON-WORKING HOURS. 8.POT HOLING: CONTRACTOR SHALL VERIFY THE EXACT LOCATION, SIZE, TYPE, AND ELEVATION OF ALL UTILITIES PRIOR TO CONSTRUCTION BY POT HOLING A MINIMUM OF 400 FEET IN ADVANCE OF TRENCHING OPERATIONS TO CONFIRM CLEARANCE FROM THE PROPOSED PIPELINES. 9.NEW PIPE PROTECTION: CONTRACTOR SHALL IMPLEMENT MEASURES DURING CONSTRUCTION THAT WILL PREVENT RUNOFF, DEBRIS AND SEDIMENT FROM ENTERING UNFINISHED PORTIONS OF THE NEW PIPE DURING CONSTRUCTION. 10.DEWATERING: GROUND WATER AND SURFACE WATER CONTROL SHALL BE PERFORMED AND RESPONSIBLY HANDLED BY THE CONTRACTOR ACCORDING TO, AND IN COMPLIANCE WITH, ALL LOCAL GOVERNING AUTHORITIES. HEAVY GROUND WATER AND/OR SURFACE WATER PUMPING MAY BE REQUIRED. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE POTENTIAL PUMPING NEEDS. THE CONTRACTOR SHALL NOT RELY ON OWNER SUPPLIED PROCTOR, GROUND WATER AND/OR SURFACE WATER DATA. CONTRACTOR SHALL OBTAIN DEWATERING PERMIT AS NECESSARY. 11.MATERIAL CONDITION: INSTALL ALL MATERIALS ACCORDING TO MANUFACTURER RECOMMENDATIONS AND STATE AND LOCAL REQUIREMENTS. USE ONLY NEW AND UNUSED MATERIALS. ALL MATERIALS SHALL BE PROVIDED BY MANUFACTURERS REGULARLY ENGAGED IN PRODUCING SAID ITEMS, AND WHICH SHALL BE FIRST QUALITY, HEAVY DUTY, COMMERCIAL/INDUSTRIAL GRADE, SUITABLE FOR THE INTENDED USE. WATER 1.CONTRACTOR SHALL PROVIDE ANY ADDITIONAL TEMPORARY BLOW OFF VALVES & FITTINGS AS NEEDED TO FLUSH AND DISINFECT NEW WATERLINES. THE CONTRACTOR SHALL PROVIDE DISINFECTION PLAN TO THE OWNER OR ENGINEER'S REPRESENTATIVE FOR APPROVAL BEFORE BEGINNING CONSTRUCTION. TEMPORARY BLOWOFF & FITTINGS SHALL BE REMOVED PRIOR TO PUTTING NEW LINE INTO SERVICE. 2.WATERLINE SHALL BE MINIMUM SLOPE OF 0.3%, UNLESS INDICATED OTHERWISE, WITH NO LOCAL HIGH POINTS EXCEPT AS INDICATED ON THE DRAWINGS. 3.DEFLECTIONS IN PIPE JOINTS SHALL NOT EXCEED 5 DEGREES FOR DI PIPE, OR MANUFACTURER'S PUBLISHED DEFLECTIONS, WHICHEVER IS SMALLER. 4.USE JOINT RESTRAINT AT ALL BENDS, FITTINGS, VALVES, ETC. THRUST RESTRAINTS ARE REQUIRED FOR ALL BURIED FITTINGS. 5. ALL DUCTILE RON PIPE AND ALL COMPRESSION COUPLINGS, MECHANICAL JOINTS, FLANGED JOINTS, VALVES, HYDRANTS AND FITTINGS INCLUDING TEES, WYES, ELBOWS, PLUGS, ETC. EXPOSED TO SOIL SHALL BE WRAPPED WITH 8 MIL THICK POLYETHYLENE FILM TUBE. ALL FITTINGS, VALVES AND EXPOSED NUTS & BOLTS SHALL BE LIBERALLY COATED WITH FM GREASE PRIOR TO WRAPPING. THE FILM SHALL BE HELD IN PLACE BY 2-INCH WIDE PLASTIC BACKED ADHESIVE TAPE EQUAL TO POLYKEN NO. 900 OR SCOTCHRAP NO. 50. THE TAPE SHALL BE INSTALLED TO TIGHTLY SECURE THE FILM TO THE PIPE. ENOUGH FILM SHALL BE USED TO OVERLAP ADJOINING SECTIONS OF FILM A MINIMUM OF ONE (1) FOOT. 6.VALVES SHALL BE WRAPPED BY BRINGING THE WRAP ON THE ADJACENT PIPE OVER THE BELLS OR FLANGES OF THE VALVE AND SEALING WITH THE ADHESIVE TAPE. THE VALVE BODIES ARE THEN WRAPPED WITH A FLAT SHEET OF THE FILM PASSED UNDER THE VALVE BOTTOM AND BROUGHT UP AROUND THE BODY TO THE STEM AND FASTENED IN PLACE WITH THE ADHESIVE TAPE. 7.POLYETHYLENE WRAP SHALL BE PROTECTED FROM THE SUN AND WEATHERING PRIOR TO USE. CARE SHALL BE EXERCISED DURING BACK FILLING OF THE PROTECTED AREAS TO PREVENT PUNCTURING OF THE FILM. 8.ALL PVC WATER PIPE SHALL BE AWWA C-900 SDR-18 PC 235. ALL DUCTILE IRON PIPE SHALL BE CL350 MIN. ALL OTHER PIPE AND FITTINGS SHALL BE RATED TO 200 PSI MIN. 9.MINIMUM PIPE SEPARATION: MAINTAIN A MINIMUM 18" VERTICAL SEPARATION BETWEEN WATER LINES AND SEWER OR STORM DRAIN LINES. WHERE OWNER OR ENGINEER'S REPRESENTATIVE DETERMINES MECHANICAL COMPACTION CANNOT BE ADEQUATELY PERFORMED, CONTRACTOR SHALL BACKFILL TRENCH AREAS WHERE NEW WATER LINES CROSS OVER EXISTING BURIED UTILITIES WITH CEMENT TREATED FLOWABLE FILL. FOR EXISTING SEWER LINE CROSSINGS, CONTRACTOR SHALL COORDINATE WITH OWNER OR ENGINEER'S REPRESENTATIVE TO EITHER BACKFILL WITH CEMENT TREATED FLOWABLE FILL OR LOOP WATERLINE. 10.ABANDONED WATER PIPES SHALL HAVE INLETS AND OUTLETS SEALED WITH PIPE PLUGS AND GROUT. 11.CONTRACTOR SHALL PROTECT ADJACENT PRESSURE PIPELINES AND PROVIDE TEMPORARY THRUST RESTRAINT AS NECESSARY DURING CONSTRUCTION INCLUDING EXISTING VALVES, TEES, BENDS, ETC. 12.ALL EXISTING PUBLIC VALVES ARE TO BE OPERATED BY AUTHORIZED EMPLOYEES. GIVE PRIOR NOTICE TO OWNER OR ENGINEER'S REPRESENTATIVE BEFORE ANY WATERLINES REQUIRE SHUTOFF TO AVOID ANY AMBIGUITIES. SEPTIC & SEWER 1.CONTRACTOR SHALL NOT INSTALL ANY SEPTIC SYSTEM IMPROVEMENTS PRIOR TO DESIGN VERIFICATION AND APPROVAL FROM ENGINEER. 2.SEPTIC SYSTEM DESIGN IS BASED ON PRELIMINARY SOIL TESTING DATA. DESIGN VERIFICATION IS BASED ON SITE AND SOIL EVALUATION BY WEBER/MORGAN HEALTH DEPARTMENT. 3.CONTRACTOR SHALL PREPARE (4) EXPLORATION PITS IN THE CAMPGROUND LEACH FIELD AREA AND (1) EXPLORATION PIT IN THE RANGER HOUSE LEACH FIELD AREA. CONTRACTOR TO COORDINATE WITH WEBER/MORGAN HEALTH DEPARTMENT TO ARRANGE FOR A HEALTH DEPARTMENT INSPECTOR TO PERFORM A SITE AND SOIL EVALUATION. CONTACT FRONT DESK: 801-399-7160 EMAIL: ENVHEALTH@CO.WEBER.UT.US 4.EXPLORATION (TEST) PITS SHALL BE EXCAVATED ACCORDING TO THE INSTRUCTIONS PROVIDED BY WEBER/MORGAN HEALTH DEPARTMENT ON THE "APPLICATION FOR WASTEWATER SITE AND SOIL EVALUATION" WHICH STATES THE FOLLOWING: EXPLORATION PITS ARE TO BE DUG BY BACKHOE IN THE APPROXIMATE LOCATION OF THE PROPOSED ABSORPTION FIELD(S) TO A MINIMUM DEPTH OF TEN FEET OR FOUR FEET BELOW THE PROPOSED ABSORPTION FIELD. EXPLORATION PITS SHOULD HAVE A VERTICAL SIDEWALL AND BE SLOPED FOR ENTRY NOT TO EXCEED 1.5 FT HORIZONTAL TO 1 FT VERTICAL FALL. THE AREA MUST ALSO BE MARKED WITH AN ADDRESS OR OTHER IDENTIFIER IF THE PIT IN NOT VISIBLE FROM THE ROAD. 5.SEWER MAINS ONLY TO BE LAID IN SEWER TRENCHES, ALL BUILDING LATERALS TO BE LAID AT NOT LESS THAN MINIMUM SLOPES SHOWN IN STANDARDS AND A MINIMUM OF 4” DIAMETER UNLESS OTHERWISE NOTED. 6.ALL NEW SEWER LINE CONSTRUCTION WILL BE PLUGGED AT THE MAIN LINE TIE-IN AND THERE WILL BE NO SEWER LINE USAGE UNTIL ALL SEWER LINES WITHIN THE PROJECT ARE ACCEPTED BY THE OWNER. 7.SOIL TESTING, EXFILTRATION, INFILTRATION AND AIR TESTING OF LINES SHALL BE IN ACCORDANCE WITH THE STANDARDS. STORM DRAIN 1.CONTRACTOR WILL BE REQUIRED TO DIVERT WATER OF EXISTING STORM DRAIN FLOWS FOR FULL DURATION OF PROJECT. POWER 1.CONTRACTOR SHALL COMPLY WITH SAFETY REQUIREMENTS FOR OPERATING CONSTRUCTION EQUIPMENT AND CONSTRUCTION ACTIVITIES BENEATH HIGH VOLTAGE POWER LINES. STATE FIRE MARSHAL REQUIREMENTS 1.OCCUPANCY OF THIS PROJECT IS SUBJECT TO DFCM CERTIFICATE OF OCCUPANCY AND A FINAL INSPECTION BY THE STATE FIRE MARSHAL'S OFFICE. A MINIMUM THREE DAY NOTICE SHALL BE GIVEN FOR THIS INSPECTION. 2.ALL PRECAUTIONS SHOULD BE TAKEN DURING CONSTRUCTION TO MAINTAIN FIRE PROTECTION AND PROTECT THE CONSTRUCTION CREW. FIRE 1.ON ANY BUILDING CONSTRUCTION SITE, ACCESSIBLE FIRE HYDRANTS SHALL BE INSTALLED BEFORE COMBUSTIBLE MATERIALS ARE DELIVERED TO THE SITE AND CONSTRUCTION COMMENCES. SAID FIRE HYDRANTS SHALL BE IN GOOD WORKING ORDER WITH REQUIRED WATER SUPPLY. 2.IF DURING CONSTRUCTION IT BECOMES NECESSARY TO CLOSE ANY CONTROL VALVE OR PLACE A HYDRANT OUT OF SERVICE, THE OWNER OR ENGINEER'S REPRESENTATIVE SHALL BE NOTIFIED. 3.UNOBSTRUCTED ACCESS TO FIRE HYDRANTS SHALL BE MAINTAINED AT ALL TIMES. THE FIRE DEPARTMENT SHALL NOT BE DETERRED OR HINDERED FROM GAINING IMMEDIATE ACCESS TO FIRE PROTECTION EQUIPMENT OR FIRE HYDRANT. ROADWAY & TRAFFIC CONTROL 1.CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN AND ALL SIGNING BARRICADES AND TRAFFIC DELINEATION SHALL CONFORM TO THE PROJECT SPECIFICATIONS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES - CURRENT EDITION. ALL TRAFFIC CONTROL PLANS ARE TO BE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE PRIOR TO TRAFFIC CONTROL IMPLEMENTATION. PROVIDE A MINIMUM OF ONE WEEK FOR TRAFFIC CONTROL REVIEW AND APPROVAL. 2.CONTRACTOR SHALL MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES WHILE CONSTRUCTION OCCURS AND ACCOMMODATE LOCAL AND THROUGH TRAFFIC. CONTRACTOR MAY NOT DISRUPT MAIL SERVICE TO RESIDENTS. 3.ALL LOCAL CITIES, COUNTIES, EMERGENCY SERVICES (I.E. HOSPITALS), SCHOOL DISTRICTS, AND PROPERTY OWNERS SHALL BE NOTIFIED OF LANE LIMITATION AND/OR ROAD CLOSURES 14 DYAS PRIOR TO COMMENCEMENT OF LIMITATION OR CLOSURE. CENTRAL DISPATCH OF EACH IMPACTED AGENCY AND ADJOINING ENTITIES SHALL RECEIVE NOTIFICATION. 4.BASE COURSE MATERIAL SHALL BOT BE PLACED ON THE SUBGRADE UNTIL SUBGRADE REQUIREMENTS HAVE BEEN COMPLETED AND ACCEPTED BY THE OWNER OR ENGINEER'S REPRESENTATIVE. 5.EXACT POINTS OF MATCHING, TERMINATION, OVERLAY AND PAVEMENT CUTTING MAY, WHERE APPLICABLE, BE DETERMINED IN THE FIELD BY THE OWNER OR ENGINEER'S REPRESENTATIVE. 6.NO PAVING CONSTRUCTION SHALL BE STARTED UNTIL ALL UNDERGROUND UTILITIES WITHIN THE ROADWAY ARE COMPLETED AND HAVE PASSED TESTING REQUIREMENTS. 7.ALL GRINDING AND/OR EPOXY PATCHING OF DAMAGED OR INCORRECTLY INSTALLED ELEMENTS SHALL NOT BE PERMITTED. ALL REPAIRS SHALL BE MADE BY REPLACING WHOLE UNITS. 8.NO MATERIALS OR EQUIPMENT OF ANY KIND SHALL BE STORED OR STOCKPILED ON NEWLY PAVED ASPHALT OR CONCRETE SURFACES. 9.ALL NEW PAVEMENTS AND CONCRETE SURFACE SHALL BE SWEPT CLEAN AND DEBRIS PROPERLY DISPOSED OF AND ALL SURVEY MONUMENTS SHALL BE FULLY INSTALLED AS WELL AS ALL UTILITY ADJUSTMENTS MADE PRIOR TO THE OWNER OR ENGINEER'S REPRESENTATIVE RECOMMENDING FINAL ACCEPTANCE. 10.ALL PAVEMENT MARKINGS SHALL COMPLY WITH THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES - CURRENT EDITION AND INSTALLED WITHIN FIVE DAYS OF COMPLETION OF THE FINAL LIFT OF ASPHALT. CONTRACTOR SHALL SPOT MARK THE ENTIRE PROJECT BEFORE APPLYING ANY PAVEMENT MARKINGS AND NOTIFY THE OWNER OR ENGINEER'S REPRESENTATIVE FOR ACCEPTANCE BEFORE APPLYING ANY PERMANENT MARKINGS. 11.WHEN STRIPING OBLITERATION IS REQUIRED, IT SHALL BE ACCOMPLISHED BY WATER BLASTING UNLESS OTHERWISE APPROVED BY OWNER OR ENGINEER'S REPRESENTATIVE AND MAY BE REQUIRED BEYOND THE PROJECT LIMITS SO THAT THE NEW STRIPING WILL MATCH PERMANENT EXISTING PAVEMENT MARKINGS. IF OBLITERATION CAUSES SHADOWING, OR IN THE OPINION OF THE OWNER OR ENGINEER'S REPRESENTATIVE WILL CAUSE CONFUSION ON THE PART OF THE DRIVER, THE CONTRACTOR SHALL SEAL THE AREA WITH SLURRY. APPLYING PAINT OVER STRIPING SHALL NOT CONSTITUTE STRIPE OBLITERATION. UTILITY CONTACT INFORMATION UTILITY COMPANY CONTACT NAME UTILITY TELEPHONE ROCKY MOUNTAIN POWER LOUIS DISTEFANO POWER 435-655-7812 PHILIPS 66 PIPELINE LLC COLT FARLEY GAS, OIL, PETROLEUM 801-299-3622 HOLLY ENERGY PARTNERS DWAYNE RUST GAS, OIL, PETROLEUM 435-729-9073 Fx. 21182 3 50 STW RWD PB G-003 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K GE N E R A L N O T E S 435-655-7812POWER 8/14/22 ARCHITECTENGINEER STAMP 11/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 R R 1 3 4 30 2 5 6 7 8 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 9 Room201 Room202 201 12 R WD DW UP BEDROOM #3107W.I.C.108A W.I.C.107A BEDROOM #2108 CLOSET106 BATH #2113CLOSET112 BATH #1110A Room111 LIVING102 DINING103 FOYER101 KITCHEN104 BEDROOM #1110 W.I.C.110B STAIR114 GARAGE105 101 108A 107A107 106 105A 105B 104 114113 112111 110A 110 108HALL109 2% SLOPE 2% SLOPE 110BR.A.R.A.R.A.R.A. 104B HB HB X X X X X X X X X X X X X X X X X X X X POINT NO.EASTINGNORTHING POINT ELEV.DESCRIPTION 50 666848.80'593791.75'6253.61' 14 12 11 1019 667190.79'589569.86'5846.90' MONUMENT - ALUMINUM CAP 1018 113 672568.83'594704.46'6313.79' 668312.67'590156.39'5970.37' SURVEY CONTROL POINTS LEGEND SURVEY CONTROL MONUMENT 200 673422.36'592101.09'6093.62' 668870.21'592005.53'6028.89' 591850.36'669239.02 6028.32' MONUMENT - BRASS CAP AT SPIKE AT SPIKE REBAR & CAP 13 REBAR IN CONCRETE PL O T : 20 2 4 - 0 8 - 1 4 0 1 : 0 0 P M PA T H : L : \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ S U R V E Y C O N T R O L . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP REBAR IN CONCRETE REBAR IN CONCRETE REBAR & CAP 668491.71'592110.19'6028.55' 668336.63'592230.90'6029.16' 50 113 200 1018 1019 11 12 13 14 N 0 250 500 Fx. 21182 4 50 STW RWD PB G-004 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K SU R V E Y C O N T R O L & R E F E R E N C E CD101 CU101 CS101 CG101 CD102 CU102 CS102 CG102 CU106 CU107 CU108 CS104 CG106 CU113 CU114 CG105 CG108 CG109 CU110 CS105 CT501 5 COORDINATE SYSTEM AND PROJECT INFORMATION DATE OF FINAL ADJUSTMENT: MAY 2022 HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (NAD83) VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) COORDINATE SYSTEM: US STATE PLANE 1983, (2011) UTAH NORTH ZONE 4301 PROJECT UNITS: US SURVEY FOOT COMBINED SCALE FACTOR: 1.0003362430 SCALE LOCATION: LAT - 31°14'07.4182"N LON - 116°40'32.28549"W FALSE NORTHING: 3000000.00 FALSE EASTING: 1000000.00 PROJECT HEIGHT: 6000.00 GEOID MODEL: GEOID18 COORDINATE SYSTEM AND PROJECT INFORMATION STATE PLANE NORTHING = (PROJECT NORTHING + 3000000)/1.0003362430 STATE PLANE EASTING = (PROJECT EASTING + 1000000)/1.0003362430 5 668311.68'592157.50'6029.51'GPS-PCC CU109 CU111 CU112 CU110 CS103 DAVID T MOR TEN S EN PLS-6436557 08/09/2024 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 1 3 4 30 2 5 6 7 8 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 9 Room201 Room202 201 12 X X X XX X X X X X X X X PL O T : 20 2 5 - 0 5 - 2 3 1 2 : 5 6 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ S U R V E Y C O N T R O L . D W G 50 1018 1019 11 12 13 14 CD101 CU101 CS101 CG101 CD102 CU102 CS102 CG102 CU106 CU107 CU108 CS104 CG106 CU113 CU114 CG105 CG108 CG109 CU110 CS105 CT501 5 CU109 CU111 CU112 CU110 CS103 RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D 5 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 X X X X X XXXX X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SD SD SD CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT CUT CU T CU T CU T CU T FIL L FILL FILL FI L L FILL FILL FILL FI L L C U T C U T CUT 5880 5890 5900 5910 5920 5930 598 0 5990 6000 596 0 5970 5950 5960 5970 5980 5990 5900 591 0 59 2 0 5 9 3 0 59 4 0 5950 59 4 0 59 5 0 5942 5944 5946 5950 5960 -1 . 4 : 1 -2 : 1 -1 . 7 : 1 -1 . 5 : 1 -4 . 1 % -4 . 9 % -1. 1 % -11 . 2 % -5.9% 42.50 40.00 42.50 40.00 42.50 40.00 42.50 42.5042.50 42.50 43.10 43.37 45.50 45.78 49.91 41.99 50.09 41.65 42.50 42.50 41.00 40.72 42.50 44.46 47.57 FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FI L L FILL FILL C U T C U T C U T CUT -2 : 1 -2 : 1 CU T CU T FIL L FI L L FI L L FIL L 5920 5930 5940 5950 5960 5920 5930 5940 5950 5960 0+00 EG : 5 9 3 8 . 7 6 FG : EG : 5 9 4 0 . 3 4 FG : EG : 5 9 3 9 . 8 7 FG : EG : 5 9 3 9 . 5 8 FG : 1+00 EG : 5 9 3 9 . 7 0 FG : EG : 5 9 3 9 . 8 7 FG : EG : 5 9 4 1 . 3 0 FG : EG : 5 9 4 2 . 2 8 FG : 2+00 EG : 5 9 4 2 . 2 1 FG : EG : 5 9 4 2 . 0 0 FG : EG : 5 9 4 1 . 0 7 FG : EG : 5 9 4 0 . 7 1 FG : 3+00 EG : 5 9 4 1 . 3 7 FG : EG : 5 9 4 1 . 9 7 FG : 5 9 4 2 . 5 0 EG : 5 9 4 2 . 3 2 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 3 1 FG : 5 9 4 0 . 0 0 4+00 EG : 5 9 4 1 . 9 7 FG : 5 9 4 0 . 0 0 EG : 5 9 4 3 . 1 1 FG : 5 9 4 2 . 2 5 EG : 5 9 4 3 . 1 6 FG : 5 9 4 0 . 0 0 EG : 5 9 4 3 . 3 1 FG : 5 9 4 0 . 0 0 5+00 EG : 5 9 4 3 . 4 3 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 3 0 FG : 5 9 4 1 . 7 5 EG : 5 9 4 0 . 8 1 FG : 5 9 4 0 . 0 0 EG : 5 9 4 0 . 5 7 FG : 5 9 4 0 . 0 0 6+00 EG : 5 9 4 0 . 7 7 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 0 6 FG : 5 9 4 2 . 5 0 EG : 5 9 4 3 . 1 4 FG : 5 9 4 3 . 1 6 6+70.63 EG : 5 9 4 4 . 9 9 FG : -4.0 : 1 -4.0 : 1 -4.0 : 1 4.0:14.0:14.0:1 N 0 30 60 PL O T : 20 2 5 - 0 5 - 2 1 0 4 : 3 3 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 11 50 STW RWD PB CG105 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K EV A P O R A T I O N P O N D G R A D I N G CUT FILL 7036 1114 ESTIMATED EVAPORATION POND EXCAVATION (CY) NOTE: THESE QUANTITIES ARE FROM SUB-GRADE OF ALL PAVEMENT SECTIONS TO EXISTING GRADE. 4:1 SIDE SLOPES 6' WIDE BERM FOR LINER ANCHOR TRENCH. SWALE FLOW LINE (HIGH POINT) BACKFILL MOUNDING OVER PIPE TO ENSURE 4' COVER. EVAPORATION POND PROFILE SWALE FLOW LINE SWALE FLOW LINE 4'x4'x4' FILTER FABRIC WRAPPED INFILTRATION POCKET (3/4" WASHED ROCK) SWALE FLOW LINE 0.5% SLOPE 1.5:1 CUT SLOPE REQUIRED TO CATCH GRADE OF EXISTING HILLSIDE. COORDINATE WITH GEOTECH TO ENSURE SLOPES ARE PROPERLY COMPACTED AND STABILIZED. GRADE SWALE TO DRAIN 5 5 4876 364 䙉义午⁇剁䑅 OF SURFACE IMPROVEMENTS ARCHITECTENGINEER STAMP 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 SD 896 + 0 0 897+ 0 0 8 9 8 + 0 0 8 9 9 + 0 0 9 0 0 + 0 0 901+00 90 2 + 0 0 90 2 + 4 2 FILL FILL FILL FILL FILL FILL FILL FILL FILLFI L L FI L L CU T CU T C U T C U T CUTCUTCUT CUT CUT CUT CU T C U T SD SD SD SD FILL FILL FILL FILL FILL FILL FILL FILL FI L L FI L L F I L L FI L L FIL L FILL FILL FILL FI L L FIL L FI L L FIL L FILL FILL CUT CUT CUT FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FIL L 604 0 60 5 0 60 6 0 6 0 6 0 6 0 5 0 6060 60 6 0 607 0 608 0 609 0 61 0 0 61 1 0 607 0 6070 6080 608 0 6090 605 0 6050 6 0 3 0 6 0 4 0 6 0 5 0 6 0 6 0 60 7 0 608 0 609 0 FI L L FI L L FI L L FIL L CU T CU T CU T CU T CUTCUT CUTCUT -3. 9 % -2.0:1 -2 . 0 : 1 - 2 . 0 : 1 -2.0 : 1 -2.3:1 -2.1:1 - 5 0 . 3 % -52.2% -50.0% -2 . 0 : 1 53.37 54.04 53.45 53.56 53.37 53.49 53.08 68.48 65.61 64.99 67.56 53.50 53.50 53.50 53.50 53.41 FILL FILL FIL L FI L L FI L L FI L L FI L L FIL L FILL FILL FILL FIL L FIL L FIL L FILL FILL -9. 5 % - 9 . 5 % -9.6% -9. 6 % - 1 2 . 6 % -3. 9 % -10.3% 66.50 67.84 68.48 67.01 68.46 WELL & T A N K A C C E S S N 0 20 40 PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 4 2 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 12 50 STW RWD PB CG106 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K RA N G E R H O U S E G R A D I N G TIE LOCATION AND ELEVATION OF EXISTING ROAD IS APPROXIMATE. CONTRACTOR TO FIELD VERIFY AND COORDINATE FINDINGS WITH ENGINEER. PROTECT IN PLACE EXISTING DRAINAGE DITCH CUT FILL 1335 609 ESTIMATED WELL AND TANK SITE EXCAVATION (CY) NOTE: THESE QUANTITIES ARE FROM SUB-GRADE OF ALL PAVEMENT SECTIONS TO EXISTING GRADE. SUB-GRADE FOR ALL BUILDINGS WAS CONSIDERED TO BE 12" BELOW FINISH FLOOR ELEVATION. EXCAVATION FOR BUILDING FOOTINGS WERE NOT INCLUDED. THIS ESTIMATED QUANTITY INCLUDES TANK EXCAVATION TO SUB-GRADE INCLUDING FOOTINGS AND SUBDRAINAGE. 18" REINF. CONCRETE PIPE (SEE UTILITY SHEETS) PROTECT IN PLACE EXISTING DRAINAGE DITCH SLOPE TO DRAIN INSIDE TANK FF: 6050.00 SEE CT502 MATCH EXISTING GRADE RIP RAP (SEE CU112) RIP RAP (SEE CU112) RIP RAP (SEE CU112) 18" REINF. CONCRETE PIPE (SEE UTILITY SHEETS) TYPICAL SECTION 1 - STATION 897+41.00 TO 899+06.00 CUT S L O P E 12' ACCESS - 4" UTBC 2: 1 M A X FI L L S L O P E 2:1 M A X FILL S L O P E 2% CROSS SLOPE TYPICAL SECTION 2 - STATION 899+06.00 TO 900+12.00 2 1 M A X C U T S L O P E 12' - 4" UTBC 4' SHLDRS - EARTH 2:1 M A X FILL S L O P E 2:1 M A X CUT S L O P E 2: 1 M A X FI L L S L O P E 2% CROSS SLOPE TYPICAL SECTION 3 - STATION 900+12.00 TO 902+40.00 2 1 M A X C U T S L O P E 2:1 M A X FILL S L O P E 2:1 M A X CUT S L O P E 2: 1 M A X FI L L S L O P E 2% CROSS SLOPE 2: 1 M A X C U T S L O P E RANGER HOUSE TANK ACCESS 12' - 4" UTBC 2:1 M A X 8" SCARIFY AND RECOMPACT 8" SCARIFY AND RECOMPACT 8" SCARIFY AND RECOMPACT 5 5 TA N K 1550 3510 5 ARCHITECTENGINEER STAMP 8/14/2211/11/24 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 6025 6030 6040 6050 6060 6070 6025 6030 6040 6050 6060 6070 HIGH PT STA: 899+33.95 HIGH PT ELEV: 6052.620 PVI STA:899+13.95 PVI ELEV: 6052.09 K: 3.23 LVC: 40.00' BV C S : 8 9 8 + 9 3 . 9 5 BV C E : 6 0 4 9 . 0 9 EV C S : 8 9 9 + 3 3 . 9 5 EV C E : 6 0 5 2 . 6 2 LOW PT STA: 898+16.00 LOW PT ELEV: 6038.57 PVI STA: 898+36.00 PVI ELEV: 6040.40 K: 6.83 LVC: 40.00' BV C S : 8 9 8 + 1 6 . 0 0 BV C E : 6 0 3 8 . 5 7 EV C S : 8 9 8 + 5 6 . 0 0 EV C E : 6 0 4 3 . 4 0 LOW PT STA: 899+92.09 LOW PT ELEV: 6054.15 PVI STA: 900+12.09 PVI ELEV: 6054.67 K: 6.81 LVC: 40.00' BV C S : 8 9 9 + 9 2 . 0 9 BV C E : 6 0 5 4 . 1 5 EV C S : 9 0 0 + 3 2 . 0 9 EV C E : 6 0 5 6 . 3 7 897+35 EG : 6 0 3 1 . 1 9 FG : EG : 6 0 3 2 . 0 2 FG : 6 0 3 2 . 5 3 EG : 6 0 3 3 . 6 0 FG : 6 0 3 4 . 8 2 898+00 EG : 6 0 3 5 . 8 2 FG : 6 0 3 7 . 1 0 EG : 6 0 3 7 . 5 3 FG : 6 0 3 9 . 4 5 EG : 6 0 3 8 . 3 5 FG : 6 0 4 2 . 5 2 EG : 6 0 3 9 . 7 0 FG : 6 0 4 6 . 2 5 899+00 EG : 6 0 4 1 . 9 3 FG : 6 0 4 9 . 9 4 EG : 6 0 4 4 . 6 7 FG : 6 0 5 2 . 2 6 EG : 6 0 4 6 . 9 7 FG : 6 0 5 3 . 0 4 EG : 6 0 4 9 . 1 9 FG : 6 0 5 3 . 7 0 900+00 EG : 6 0 5 1 . 6 0 FG : 6 0 5 4 . 4 0 EG : 6 0 5 3 . 8 4 FG : 6 0 5 5 . 8 1 900+50 EG : 6 0 5 5 . 9 4 FG : 6 0 5 7 . 8 9 9.15% 15.01% 2.63% 6055 6060 6070 6080 6055 6060 6070 6080 900+50 EG : 6 0 5 5 . 9 4 FG : 6 0 5 7 . 8 9 EG : 6 0 5 9 . 8 3 FG : 6 0 6 0 . 0 2 901+00 EG : 6 0 6 4 . 2 0 FG : 6 0 6 2 . 1 2 EG : 6 0 6 6 . 9 1 FG : 6 0 6 3 . 8 0 EG : 6 0 7 0 . 0 2 FG : 6 0 6 4 . 9 5 EG : 6 0 6 8 . 8 6 FG : 6 0 6 5 . 7 9 902+00 EG : 6 0 6 7 . 1 0 FG : 6 0 6 6 . 6 2 EG : 6 0 6 6 . 6 9 FG : 6 0 6 7 . 4 5 EG : FG : EG : FG : 903+00 EG : FG : 3.33% 8.50% GR A D E B R E A K S T A = 9 0 2 + 4 1 . 6 0 EL E V = 6 0 6 8 . 0 0 PVI STA:901+22.24 PVI ELEV:6064.03 K:11.60 LVC:60.00' BV C S : 9 0 0 + 9 2 . 2 4 BV C E : 6 0 6 1 . 4 8 EV C S : 9 0 1 + 5 2 . 2 4 EV C E : 6 0 6 5 . 0 3 RANGER HOUSE TANK ACCESS PL O T : 20 2 5 - 0 5 - 2 1 0 4 : 3 3 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 13 50 STW RWD PB CG107 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K RA N G E R H O U S E G R A D I N G RANGER HOUSE TANK ACCESS MATCH EXISTING MATCH GARAGE FLOOR ELEVATION TYPICAL SECTION 1 - STATION 897+41.00 TO 899+06.00 CUT S L O P E 12' ACCESS - 4" UTBC 2:1 M A X FI L L S L O P E 2:1 M A X FILL S L O P E 2% CROSS SLOPE TYPICAL SECTION 2 - STATION 899+06.00 TO 900+12.00 2 1 M A X C U T S L O P E 12' - 4" UTBC 4' SHLDRS - EARTH 2:1 M A X FILL S L O P E 2:1 M A X CUT S L O P E 2: 1 M A X FI L L S L O P E 2% CROSS SLOPE TYPICAL SECTION 3 - STATION 900+12.00 TO 902+40.00 2 1 M A X C U T S L O P E 2:1 M A X FILL S L O P E 2:1 M A X CUT S L O P E 2: 1 M A X FI L L S L O P E 2% CROSS SLOPE 2: 1 M A X C U T S L O P E RANGER HOUSE TANK ACCESS 12' - 4" UTBC 2:1 M A X 8" SCARIFY AND RECOMPACT 8" SCARIFY AND RECOMPACT 8" SCARIFY AND RECOMPACT TA N K 5 ARCHITECTENGINEER STAMP 8/14/2211/11/24 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 6040 6050 6060 6070 6080 6090 6100 6110 6120 6130 6040 6050 6060 6070 6080 6090 6100 6110 6120 6130 599+50 EG : FG : EG : FG : 600+00 EG : 6 0 5 0 . 5 6 FG : EG : 6 0 5 3 . 5 1 FG : 6 0 5 5 . 4 6 EG : 6 0 5 6 . 7 7 FG : 6 0 5 7 . 1 9 EG : 6 0 6 3 . 8 2 FG : 6 0 5 9 . 8 1 601+00 EG : 6 0 6 9 . 1 7 FG : 6 0 6 3 . 4 8 EG : 6 0 7 2 . 4 0 FG : 6 0 6 8 . 1 5 EG : 6 0 7 5 . 7 3 FG : 6 0 7 3 . 0 2 EG : 6 0 7 9 . 8 7 FG : 6 0 7 7 . 9 0 602+00 EG : 6 0 8 6 . 0 9 FG : 6 0 8 2 . 7 7 EG : 6 0 9 0 . 7 5 FG : 6 0 8 7 . 6 6 EG : 6 0 9 4 . 0 1 FG : 6 0 9 2 . 6 1 EG : 6 0 9 8 . 0 5 FG : 6 0 9 7 . 6 0 603+00 EG : 6 1 0 2 . 6 9 FG : 6 1 0 2 . 6 0 EG : 6 1 0 6 . 2 4 FG : 6 1 0 7 . 5 9 EG : 6 1 1 0 . 6 1 FG : 6 1 1 2 . 5 9 EG : 6 1 1 7 . 5 5 FG : 6 1 1 7 . 5 8 604+00 EG : 6 1 2 4 . 6 1 FG : 6 1 2 2 . 5 8 6.50% 19.50% GR A D E B R E A K S T A = 6 0 0 + 0 2 . 6 5 EL E V = 6 0 5 4 . 0 1 PVI STA:600+77.45 PVI ELEV:6058.87 K:5.91 LVC:76.84' BV C S : 6 0 0 + 3 9 . 0 3 BV C E : 6 0 5 6 . 3 8 EV C S : 6 0 1 + 1 5 . 8 7 EV C E : 6 0 6 6 . 3 7 PVI STA:602+32.45 PVI ELEV:6089.10 K:94.47 LVC:45.46' BV C S : 6 0 2 + 0 9 . 7 2 BV C E : 6 0 8 4 . 6 7 EV C S : 6 0 2 + 5 5 . 1 8 EV C E : 6 0 9 3 . 6 4 SD 5 9 9 + 9 6 6 0 0 + 0 0 60 1 + 0 0 60 2 + 0 0 6 0 3 + 0 0 6 0 4 + 0 0 899+00 900+0 0 90 1 + 0 0 FILL FI L L FIL L FI L L FILL FILL F I L L F I L L FI L L FI L L FI L L FILL FIL L FILL CUT CUT CUT CUT CUT FIL L FILL FILL FILL CUT FILL FILL FILL FILL FILL FILL FILL CUT CUT FILL FILL FILL FILL FILL FILL FILL FILL FIL L FIL L FIL L CUT FILL FILLCUT CUT CU T CUT CUT CUT CUT CUT CUTCUT CUTCUT CUT CUT CU T CU T CU T CUT CUT CUT SD SD SD F I L L FI L L FILL FILL FILL FILL FI L L FI L L FI L L FI L L FI L L FI L L FI L L F I L L FI L L F I L L FILL 6 0 6 0 60 7 0 6 0 8 0 6 0 9 0 6 1 0 0 61 1 0 61 2 0 6130 60 5 0 606 0 6070 608 0 6090 6100 6110 6120 6130 6050 606 0 60 6 0 6 0 7 0 6 0 8 0 6 0 9 0 61 0 0 61 1 0 60 5 0 FILL FILL FILL FILL CU T CUT CUT CUT FIL L FIL L FI L L -1 0 . 1 % -1 1 . 0 % -50.3% -5 2 . 2 % -5 0 . 0 % -2.0:1 53.37 54.04 53.45 53.56 53.37 54.65 53.49 53.08 65.48 65.36 64.57 64.75 64.22 65.45 53.50 53.50 53.50 53.50 53.41 TANK A C C E S S N 0 20 40 PL O T : 20 2 5 - 0 4 - 0 3 1 0 : 5 1 A M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 BI D A D D E N D U M RW D RW D 3/ 2 5 / 2 0 2 5 3 BI D A D D E N D U M JR P RW D 4/ 3 / 2 0 2 5 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 14 50 STW RWD PB CG108 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K TA N K S I T E G R A D I N G M A T C H L I N E S E E S H E E T C G 1 0 9 R A N G E R H O U S E A C C E S S 8" SCARIFY AND RECOMPACT 4% CROSS SLOPE TYPICAL SECTION 1 - STATION 600+00.00 TO 608+80.001 16' - 4" UTBC 2:1 M A X FI L L S L O P E 2:1 MAXCUT SLOPE 2:1 M A X FILL S L O P E CUT COND. TANK ACCESS TYPICAL SECTION 4" UTBC 4% SLOPE TO DAYLIGHT CUT FILL ESTIMATED TANK SITE EXCAVATION (CY) NOTE: THESE QUANTITIES ARE FROM SUB-GRADE OF ALL PAVEMENT SECTIONS TO EXISTING GRADE. SUB-GRADE FOR ALL BUILDINGS WAS CONSIDERED TO BE 12" BELOW FINISH FLOOR ELEVATION. EXCAVATION FOR BUILDING FOOTINGS WERE NOT INCLUDED. THIS ESTIMATED QUANTITY INCLUDES TANK EXCAVATION TO SUB-GRADE INCLUDING FOOTINGS AND SUBDRAINAGE. 3379 7215 18" RCP (SEE CU SHEETS) 18" RCP (SEE CU SHEETS) ALL IMPROVEMENTS UP TO THE RANGER RESIDENCE BEYOND THIS LINE ARE INCLUDED IN THE RANGER RESIDENCE BID. RIP RAP (SEE CU112) GRADE TO DRAIN AROUND PUMP HOUSE 3 04/03/2024 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 6120 6130 6140 6150 6160 6170 6180 6190 6200 6120 6130 6140 6150 6160 6170 6180 6190 6200 604+00 EG : 6 1 2 4 . 6 1 FG : 6 1 2 2 . 5 8 EG : 6 1 3 1 . 1 8 FG : 6 1 2 7 . 5 7 EG : 6 1 3 4 . 9 7 FG : 6 1 3 2 . 5 7 EG : 6 1 4 0 . 8 7 FG : 6 1 3 7 . 5 6 605+00 EG : 6 1 4 6 . 7 8 FG : 6 1 4 2 . 5 6 EG : 6 1 5 1 . 5 9 FG : 6 1 4 7 . 5 5 EG : 6 1 5 6 . 1 7 FG : 6 1 5 2 . 5 5 EG : 6 1 6 0 . 2 7 FG : 6 1 5 7 . 5 5 606+00 EG : 6 1 6 4 . 3 8 FG : 6 1 6 2 . 5 4 EG : 6 1 6 8 . 9 9 FG : 6 1 6 7 . 5 4 EG : 6 1 7 3 . 6 1 FG : 6 1 7 2 . 5 3 EG : 6 1 7 7 . 8 4 FG : 6 1 7 7 . 5 3 607+00 EG : 6 1 8 4 . 1 9 FG : 6 1 8 2 . 5 2 EG : 6 1 8 9 . 8 9 FG : 6 1 8 7 . 5 2 607+50 EG : 6 1 9 5 . 5 5 FG : 6 1 9 2 . 5 1 19.98% 60 3 + 0 0 60 4 + 0 0 60 5 + 0 0 60 6 + 0 0 60 7 + 0 0 608+ 0 0 FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL CUT FIL L FILL FILL FILL FILL FILL FI L L FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL FIL L FI L L FILL FILL FI L L FI L L FI L L FI L L CUT CUT C U T CUT C U T CUTCUTCUTCUT CUTCUT CUT CUT CUTCUTCUTCUTCUTCUT CUT CUT CUT CUT CUTCUT CUT CUT CUT CU T 61 0 0 61 1 0 61 2 0 6130 6140 6150 6160 6 0 9 0 61 0 0 6 1 1 0 6 1 2 0 61 3 0 61 8 0 619 0 6200 6110 61 2 0 61 3 0 61 4 0 616 0 6170 6180 6190 620 0 MA T C H L I N E SE E S H E E T C G 1 1 0 N 0 20 40 PL O T : 20 2 5 - 0 4 - 0 3 1 0 : 5 1 A M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 BI D A D D E N D U M RW D RW D 3/ 2 5 / 2 0 2 5 3 BI D A D D E N D U M JR P RW D 4/ 3 / 2 0 2 5 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 15 50 STW RWD PB CG109 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K TA N K S I T E G R A D I N G MA T C H L I N E SE E S H E E T C G 1 0 8 TANK ACCESS 8" SCARIFY AND RECOMPACT 4% CROSS SLOPE TYPICAL SECTION 1 - STATION 600+00.00 TO 608+80.001 16' - 4" UTBC 2: 1 M A X FI L L S L O P E 2:1 MAXCUT SLOPE 2:1 M A X FILL S L O P E CUT COND. TANK ACCESS TYPICAL SECTION 4" UTBC 4% SLOPE TO DAYLIGHT CUT FILL NOTE: THESE QUANTITIES ARE FROM SUB-GRADE OF ALL PAVEMENT SECTIONS TO EXISTING GRADE. SUB-GRADE FOR ALL BUILDINGS WAS CONSIDERED TO BE 12" BELOW FINISH FLOOR ELEVATION. EXCAVATION FOR BUILDING FOOTINGS WERE NOT INCLUDED. THIS ESTIMATED QUANTITY INCLUDES TANK EXCAVATION TO SUB-GRADE INCLUDING FOOTINGS AND SUBDRAINAGE. ESTIMATED TANK SITE EXCAVATION (CY) 3379 7215 3 04/03/2024 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 KEY DESCRIPTION GRADING NOTES: SPOT ELEV. (TYP) 1.SLOPE ARROW LABELS ARE FOR INFORMATION ONLY. 2.ALL GRADING & CONSTRUCTION SHALL BE KEPT WITHIN PROPERTY BOUNDARIES AND STAY COMPLETELY CLEAR OF ENVIRONMENTAL PROTECTION AREA OF THE RIVER. 18.50 6170 6180 6190 6200 6210 6220 6230 6240 6250 6260 6170 6180 6190 6200 6210 6220 6230 6240 6250 6260 607+50 EG : 6 1 9 5 . 5 5 FG : 6 1 9 2 . 5 1 EG : 6 2 0 1 . 5 5 FG : 6 1 9 7 . 5 1 608+00 EG : 6 2 0 4 . 9 7 FG : 6 2 0 2 . 5 0 EG : 6 2 0 7 . 8 9 FG : 6 2 0 7 . 4 9 EG : 6 2 1 0 . 5 3 FG : 6 2 1 1 . 9 4 EG : 6 2 1 2 . 2 5 FG : 6 2 1 5 . 5 1 609+00 EG : 6 2 1 3 . 9 7 FG : 6 2 1 8 . 2 3 EG : 6 2 1 5 . 1 2 FG : EG : 6 2 1 3 . 7 7 FG : EG : 6 2 0 9 . 1 0 FG : 610+00 EG : 6 2 0 4 . 2 8 FG : 610+10 EG : 6 2 0 1 . 9 2 FG : 6.12% GR A D E B R E A K S T A = 6 0 9 + 2 3 . 7 1 EL E V = 6 2 2 0 . 0 0 HIGH PT STA: 609+21.62 HIGH PT ELEV: 6219.872 PVI STA:608+71.62 PVI ELEV: 6216.81 K: 7.21 LVC: 100.00' BV C S : 6 0 8 + 2 1 . 6 2 BV C E : 6 2 0 6 . 8 2 EV C S : 6 0 9 + 2 1 . 6 2 EV C E : 6 2 1 9 . 8 7 606 + 0 0 6 0 7 + 0 0 60 8 + 0 0 60 9 + 0 0 61 0 + 0 0 61 0 + 1 0 FIL L FI L L FIL L FILL FILL FILL FIL L FIL L FILL FILL FILL FILL FILL FILL FILL F I L L FI L L FI L L FI L L FILL FILL FILL FILL FILL FILL FILL FILL FIL L FI L L F I L L FI L L FI L L FI L L FI L L FIL L FILL C U T C U T C U T C U T CUT CUT CUT CUT CUT CU T CUT CU T CU T C U T CUT CUT CU T CUT CUT CUT CUT CU T CU T CU T CU T 61 8 0 6 1 9 0 62 0 0 6220 6230 6240 620 0 6210 6180 6190 6180 6220 623 0 6120 613 0 614 0 6150 6160 6170 618 0 619 0 620 0 621 0 -5 . 9 % -9. 9 % -11. 6 % -10 . 3 % -2 . 2 % 18.44 18.84 19.21 18.13 18.13 16.44 17.65 18.44 17.79 20.00 20.00 SEE TANK SHEETS FOR DETAILS N 0 20 40 PL O T : 20 2 5 - 0 4 - 0 3 1 0 : 5 1 A M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C G . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 BI D A D D E N D U M RW D RW D 3/ 2 5 / 2 0 2 5 3 BI D A D D E N D U M JR P RW D 4/ 3 / 2 0 2 5 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 16 50 STW RWD PB CG110 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K TA N K S I T E G R A D I N G M A T C H L I N E S E E S H E E T C G 1 0 9 TANK ACCESS 4' ROCK RETAINING WALL (SEE CS105) RIP RAP DRAIN PAD (SEE CT501) 8" SCARIFY AND RECOMPACT 4% CROSS SLOPE TYPICAL SECTION 1 - STATION 600+00.00 TO 608+80.00 16' - 4" UTBC 2: 1 M A X FI L L S L O P E 2: 1 M A X C U T S L O P E 2:1 M A X FILL S L O P E CUT COND. TANK ACCESS TYPICAL SECTION 4" UTBC 4% SLOPE TO DAYLIGHT 4' ROCK RETAINING WALL (SEE CS105) CUT FILL NOTE: THESE QUANTITIES ARE FROM SUB-GRADE OF ALL PAVEMENT SECTIONS TO EXISTING GRADE. SUB-GRADE FOR ALL BUILDINGS WAS CONSIDERED TO BE 12" BELOW FINISH FLOOR ELEVATION. EXCAVATION FOR BUILDING FOOTINGS WERE NOT INCLUDED. THIS ESTIMATED QUANTITY INCLUDES TANK EXCAVATION TO SUB-GRADE INCLUDING FOOTINGS AND SUBDRAINAGE. DRAINAGE DITCH HIGH POINT. SLOPE DRAINAGE EACH WAY TO PREVENT PONDING STORM WATER UPHILL FROM THE WATER TANK. ESTIMATED TANK SITE EXCAVATION (CY) 3379 7215 3 04/03/2024 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 X X X XXXX XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 5920 5930 5940 6''SD 6''SD 6''SD 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 54 + 0 0 55 + 0 0 56 + 0 0 5 7 + 0 0 5 8 + 0 0 5 9 + 0 0 6''SD 6''SD 589 0 5900 5910 5920 5930 5940 5950 5960 5970 5980 5990 KEY DET DESCRIPTION UTILITY NOTES: 1 RV DUMP STATION RV SEWER CONNECTION 8" PVC C900 SEWER MAIN 6" PVC C900 SEWER MAIN 4" PVC SEWER LATERAL 48" SEWER MANHOLE 4" SEWER CLEANOUT 5000 GALLON SEPTIC TANK CAMPGROUND LEACH FIELD 1500 GALLON SEPTIC TANK RANGER HOUSE LEACH FIELD 8" C900 WATER MAIN W/ FITTINGS 4" C900 WATER MAIN W/ FITTINGS 2-1/2" PVC WATER SERVICE LINE W/ TAP 2" PVC WATER SERVICE LINE W/ TAP 1-1/2" PVC WATER SERVICE LINE W/ TAP 1" PE WATER SERVICE LINE W/ TAP 3/4" PE WATER SERVICE LINE W/ TAP 6" PRV W/ 2" BYPASS 8" GATE VALVE 6" GATE VALVE 4" GATE VALVE 2-1/2" BRONZE CURB STOP VALVE 2" BRONZE CURB STOP VALVE 1-1/2" BRONZE CURB STOP VALVE 1" BRONZE CURB STOP VALVE FIRE HYDRANT ASSEMBLY CAMPSITE UTILITY POD ACCESSIBLE UTILITY POD 36" CMP EXTENSION W/ END SECTION 18" REINF. CONCRETE PIPE 6" PVC C900 DRAIN PIPE RIP RAP DITCH 12" NYLOPLAST DRAIN BASIN WITH DUCTILE IRON FRAME AND LID PER MANUFACTURERS SPECIFICATIONS. 12" THICK COLLAR WHERE REQUIRED. 2 3 4 5 6 1 CU501 2 CU503 1 CU503 5 CU502 2 CU501 7 8 9 10 11 5 CU501 5 CU501 3 CU501 12 13 14 15 16 17 18 5 CU503 19 20 21 22 6 CU502 3 CU503 23 24 25 26 27 28 6 CU503 2 CU502 29 30 31 3 CU502 APWA STD 5 CU502 2 CU503 4 CU501 5 CU502 5 CU502 5 CU503 5 CU503 5 CU503 5 CU503 6 CU502 6 CU502 4 CU503 2 CU502 4 CU503 4 CU503 4 CU503 32 33 34 APWA STD 1 CU114 MFR STD 5890 5900 5925 5950 5975 6000 5890 5900 5925 5950 5975 6000 50+00 EG : 5 9 3 8 . 7 6 FG : EG : 5 9 4 0 . 3 4 FG : EG : 5 9 3 9 . 8 7 FG : EG : 5 9 3 9 . 5 8 FG : 51+00 EG : 5 9 3 9 . 7 0 FG : EG : 5 9 3 9 . 8 7 FG : EG : 5 9 4 1 . 3 0 FG : EG : 5 9 4 2 . 2 8 FG : 52+00 EG : 5 9 4 2 . 2 1 FG : EG : 5 9 4 2 . 0 0 FG : EG : 5 9 4 1 . 0 7 FG : EG : 5 9 4 0 . 7 1 FG : 53+00 EG : 5 9 4 1 . 3 7 FG : EG : 5 9 4 1 . 9 7 FG : 5 9 4 2 . 5 0 EG : 5 9 4 2 . 3 2 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 3 1 FG : 5 9 4 0 . 0 0 54+00 EG : 5 9 4 1 . 9 7 FG : 5 9 4 0 . 0 0 EG : 5 9 4 3 . 1 1 FG : 5 9 4 2 . 2 5 EG : 5 9 4 3 . 1 6 FG : 5 9 4 0 . 0 0 EG : 5 9 4 3 . 3 1 FG : 5 9 4 0 . 0 0 55+00 EG : 5 9 4 3 . 4 3 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 3 0 FG : 5 9 4 1 . 7 5 EG : 5 9 4 0 . 8 1 FG : 5 9 4 0 . 0 0 EG : 5 9 4 0 . 5 7 FG : 5 9 4 0 . 0 0 56+00 EG : 5 9 4 0 . 7 7 FG : 5 9 4 0 . 0 0 EG : 5 9 4 2 . 0 6 FG : 5 9 4 2 . 5 0 EG : 5 9 4 2 . 8 6 FG : 5 9 4 3 . 1 5 EG : 5 9 4 4 . 7 3 FG : 5 9 4 4 . 6 3 57+00 EG : 5 9 4 5 . 4 9 FG : 5 9 4 5 . 5 2 EG : 5 9 4 7 . 2 0 FG : EG : 5 9 4 9 . 3 4 FG : EG : 5 9 5 1 . 3 3 FG : 58+00 EG : 5 9 5 6 . 6 6 FG : 6" PVC PIPE 32 L.F. @ 2.43% 12" NYLOPLAST BASIN DMH#01 RIM = 5942.50 6" INV IN = 5940.77 6" INV OUT = 5940.77 STA: 56+35.66 6" PVC PIPE 20 L.F. @ 0.50% 6" PVC PIPE 20 L.F. @ 0.50% 6" PVC PIPE 148 L.F. @ 3.40% 12" NYLOPLAST BASIN DMH#02 RIM = 5951.94 6" INV IN = 5945.78 6" INV OUT = 5945.78 STA: 57+83.20 N 0 40 80 PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 0 6 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C U S E W E R P L A N & P R O F I L E . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 M A T C H L I N E SE E S H E E T C U 1 1 0 6" PVC DRAIN PIPE PUMP HOUSE TO EVAPORATION POND EVAPORATION PONDS 32 32 Fx. 21182 26 50 STW RWD PB CU110 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K PO N D D R A I N P L A N & P R O F I L E NO COLLAR 34 NO COLLAR 34 5 CS50232 5 CS50232 5 CS50232 5 ARC+,T(CT(1*,1((RSTAMP 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 60 0 0 60 1 0 60 2 0 6030 6040 605 0 6060 607 0 5910 5920 5930 5940 5950 5960 5970 598 0 59 9 0 6''SD 6''SD 6''SD 6''SD 6''SD 6''SD5 8 + 0 0 5 9 + 0 0 6 0 + 0 0 61 + 0 0 62 + 0 0 63 + 0 0 64 + 0 0 65 + 0 0 66 + 0 0 67 + 0 0 6 8 + 0 0 6''SD 6''S D 6''SD 6''SD 6''S D KEY DET DESCRIPTION UTILITY NOTES: 1 RV DUMP STATION RV SEWER CONNECTION 8" PVC C900 SEWER MAIN 6" PVC C900 SEWER MAIN 4" PVC SEWER LATERAL 48" SEWER MANHOLE 4" SEWER CLEANOUT 5000 GALLON SEPTIC TANK CAMPGROUND LEACH FIELD 1500 GALLON SEPTIC TANK RANGER HOUSE LEACH FIELD 8" C900 WATER MAIN W/ FITTINGS 4" C900 WATER MAIN W/ FITTINGS 2-1/2" PVC WATER SERVICE LINE W/ TAP 2" PVC WATER SERVICE LINE W/ TAP 1-1/2" PVC WATER SERVICE LINE W/ TAP 1" PE WATER SERVICE LINE W/ TAP 3/4" PE WATER SERVICE LINE W/ TAP 6" PRV W/ 2" BYPASS 8" GATE VALVE 6" GATE VALVE 4" GATE VALVE 2-1/2" BRONZE CURB STOP VALVE 2" BRONZE CURB STOP VALVE 1-1/2" BRONZE CURB STOP VALVE 1" BRONZE CURB STOP VALVE FIRE HYDRANT ASSEMBLY CAMPSITE UTILITY POD ACCESSIBLE UTILITY POD 36" CMP EXTENSION W/ END SECTION 18" REINF. CONCRETE PIPE 6" PVC C900 DRAIN PIPE RIP RAP DITCH 12" NYLOPLAST DRAIN BASIN WITH DUCTILE IRON FRAME AND LID PER MANUFACTURERS SPECIFICATIONS. 12" THICK COLLAR WHERE REQUIRED. 2 3 4 5 6 1 CU501 2 CU503 1 CU503 5 CU502 2 CU501 7 8 9 10 11 5 CU501 5 CU501 3 CU501 12 13 14 15 16 17 18 5 CU503 19 20 21 22 6 CU502 3 CU503 23 24 25 26 27 28 6 CU503 2 CU502 29 30 31 3 CU502 APWA STD 5 CU502 2 CU503 4 CU501 5 CU502 5 CU502 5 CU503 5 CU503 5 CU503 5 CU503 6 CU502 6 CU502 4 CU503 2 CU502 4 CU503 4 CU503 4 CU503 32 33 34 APWASTD 1 CU114 MFR STD 5940 5950 5975 6000 6025 6050 5940 5950 5975 6000 6025 6050 58+00 EG : 5 9 5 6 . 6 6 EG : 5 9 6 4 . 2 7 EG : 5 9 7 2 . 5 3 EG : 5 9 7 4 . 5 9 59+00 EG : 5 9 7 6 . 7 4 EG : 5 9 7 8 . 8 3 EG : 5 9 8 2 . 3 5 EG : 5 9 8 4 . 0 3 60+00 EG : 5 9 8 5 . 7 3 EG : 5 9 8 9 . 4 4 EG : 5 9 9 2 . 8 5 EG : 5 9 9 5 . 0 8 61+00 EG : 5 9 9 5 . 9 3 EG : 5 9 9 8 . 0 9 EG : 5 9 9 9 . 7 3 EG : 6 0 0 1 . 9 4 62+00 EG : 6 0 0 3 . 7 1 EG : 6 0 0 5 . 9 9 EG : 6 0 0 8 . 3 8 EG : 6 0 0 8 . 9 5 63+00 EG : 6 0 1 2 . 8 8 EG : 6 0 1 5 . 1 0 EG : 6 0 1 7 . 2 8 EG : 6 0 1 7 . 0 7 64+00 EG : 6 0 1 7 . 7 5 EG : 6 0 1 7 . 4 4 EG : 6 0 2 0 . 1 7 EG : 6 0 2 0 . 7 6 65+00 EG : 6 0 2 1 . 0 5 EG : 6 0 2 1 . 7 1 EG : 6 0 2 2 . 8 9 EG : 6 0 2 3 . 8 1 66+00 EG : 6 0 2 4 . 9 0 6" PVC PIPE 117 L.F. @ 6.69% 12" NYLOPLAST BASIN DMH#05 RIM = 6017.00 6" INV IN = 6009.58 6" INV OUT = 6009.58 STA: 63+91.43 12" NYLOPLAST BASIN DMH#03 RIM = 5986.24 6" INV IN = 5980.19 6" INV OUT = 5980.19 STA: 60+05.73 6" PVC PIPE 225 L.F. @ 15.47% 6" PVC PIPE 270 L.F. @ 8.02% 6" PVC PIPE 50 L.F. @ 5.94% 6" PVC PIPE 50 L.F. @ 5.32% 6" PVC PIPE 50 L.F. @ 4.44% 6" PVC PIPE 50 L.F. @ 3.44% 12" NYLOPLAST BASIN DMH#04 RIM = 6008.93 6" INV IN = 6001.78 6" INV OUT = 6001.78 STA: 62+74.90 N 6" PVC DRAIN PIPE PUMP HOUSE TO EVAPORATION POND 0 40 80 PL O T : 2 0 2 4 - 0 8 - 1 3 1 1 : 4 5 P M PA T H : L : \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C U S E W E R P L A N & P R O F I L E . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 27 50 STW RWD PB CU111 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K PO N D D R A I N P L A N & P R O F I L E MA T C H L I N E SE E S H E E T C U 1 1 1 MA T C H L I N E SE E S H E E T C U 1 0 9 3232 32 32 ASPHALT ROAD GRAVEL ROAD 4'-0" MIN SEE DETAIL 5 ON SHEET CU502 FOR SURFACING 3'-0" 8" C900 PVC WATERLINE 6" C900 PVC DRAIN PIPE TYPICAL SHARED UTILITY TRENCH DETAIL 8" C900 PVC WATERLINE NO COLLAR 34 NO COLLAR 34 NO COLLAR34 DRAIN PIPE IS SHOWN IN SEGMENTS WITH CHANGING SLOPES TO SHOW PIPE DEFLECTION AT JOINTS. INSTALL PER THE TYPICAL SHARED UTILITY TRENCH DETAIL AS MUCH AS POSSIBLE. 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 6030 6040 6050 6060 6070 6080 6''S D 6''S D 6''S D 6''SD 6''SD 6''SD 6''SD 6''SD 65 + 0 0 66 + 0 0 67 + 0 0 6 8 + 0 0 6 9 + 0 0 7 0 + 0 0 71+ 0 0 72+ 0 0 73 + 0 0 73+ 1 6 SD SD EL W W W SDSD SD SD KEY DET DESCRIPTION UTILITY NOTES: 1 RV DUMP STATION RV SEWER CONNECTION 8" PVC C900 SEWER MAIN 6" PVC C900 SEWER MAIN 4" PVC SEWER LATERAL 48" SEWER MANHOLE 4" SEWER CLEANOUT 5000 GALLON SEPTIC TANK CAMPGROUND LEACH FIELD 1500 GALLON SEPTIC TANK RANGER HOUSE LEACH FIELD 8" C900 WATER MAIN W/ FITTINGS 4" C900 WATER MAIN W/ FITTINGS 2-1/2" PVC WATER SERVICE LINE W/ TAP 2" PVC WATER SERVICE LINE W/ TAP 1-1/2" PVC WATER SERVICE LINE W/ TAP 1" PE WATER SERVICE LINE W/ TAP 3/4" PE WATER SERVICE LINE W/ TAP 6" PRV W/ 2" BYPASS 8" GATE VALVE 6" GATE VALVE 4" GATE VALVE 2-1/2" BRONZE CURB STOP VALVE 2" BRONZE CURB STOP VALVE 1-1/2" BRONZE CURB STOP VALVE 1" BRONZE CURB STOP VALVE FIRE HYDRANT ASSEMBLY CAMPSITE UTILITY POD ACCESSIBLE UTILITY POD 36" CMP EXTENSION W/ END SECTION 18" REINF. CONCRETE PIPE 6" PVC C900 DRAIN PIPE RIP RAP DITCH 12" NYLOPLAST DRAIN BASIN WITH DUCTILE IRON FRAME AND LID PER MANUFACTURERS SPECIFICATIONS. 12" THICK COLLAR WHERE REQUIRED. 2 3 4 5 6 1 CU501 2 CU503 1 CU503 5 CU502 2 CU501 7 8 9 10 11 5 CU501 5 CU501 3 CU501 12 13 14 15 16 17 18 5 CU503 19 20 21 22 6 CU502 3 CU503 23 24 25 26 27 28 6 CU503 2 CU502 29 30 31 3 CU502 APWA STD 5 CU502 2 CU503 4 CU501 5 CU502 5 CU502 5 CU503 5 CU503 5 CU503 5 CU503 6 CU502 6 CU502 4 CU503 2 CU502 4 CU503 4 CU503 4 CU503 32 33 34 APWA STD 1 CU114 MFR STD 5960 5975 6000 6025 6050 6075 5960 5975 6000 6025 6050 6075 66+00 EG : 6 0 2 4 . 9 0 FG : EG : 6 0 2 5 . 8 8 FG : EG : 6 0 2 6 . 8 3 FG : EG : 6 0 2 7 . 3 8 FG : 67+00 EG : 6 0 2 8 . 2 5 FG : EG : 6 0 2 8 . 6 6 FG : EG : 6 0 2 9 . 3 4 FG : EG : 6 0 2 9 . 3 5 FG : 68+00 EG : 6 0 2 8 . 9 9 FG : EG : 6 0 2 8 . 9 4 FG : EG : 6 0 2 8 . 9 9 FG : EG : 6 0 2 8 . 7 9 FG : 69+00 EG : 6 0 2 8 . 6 7 FG : EG : 6 0 2 8 . 5 2 FG : EG : 6 0 2 8 . 4 2 FG : EG : 6 0 2 8 . 4 7 FG : 70+00 EG : 6 0 2 8 . 4 8 FG : EG : 6 0 2 8 . 7 4 FG : EG : 6 0 2 9 . 5 0 FG : EG : 6 0 3 0 . 5 9 FG : 71+00 EG : 6 0 3 1 . 9 9 FG : 6 0 3 2 . 5 6 EG : 6 0 3 3 . 5 8 FG : 6 0 3 4 . 7 8 EG : 6 0 3 5 . 6 9 FG : 6 0 3 7 . 0 1 EG : 6 0 3 7 . 2 9 FG : 6 0 3 9 . 3 7 72+00 EG : 6 0 3 8 . 3 9 FG : 6 0 4 2 . 5 3 EG : 6 0 3 9 . 6 9 FG : 6 0 4 6 . 2 9 EG : 6 0 4 1 . 9 3 FG : 6 0 4 9 . 9 5 EG : 6 0 4 2 . 1 6 FG : 6 0 5 1 . 8 5 73+00 EG : 6 0 4 1 . 3 9 FG : 6 0 5 3 . 3 9 EG : FG : EG : FG : EG : FG : 74+00 EG : FG : 6" PVC PIPE 54 L.F. @ 5.97% 6" PVC PIPE 180 L.F. @ 8.43% 6" PVC PIPE 287 L.F. @ 0.92% 12" NYLOPLAST BASIN DMH#07 RIM = 6030.71 6" INV IN = 6025.02 6" INV OUT = 6025.02 STA: 70+78.40 12" NYLOPLAST BASIN DMH#08 RIM = 6050.85 6" INV IN = 6040.15 6" INV OUT = 6040.15 STA: 72+57.92 DCO#03 RIM = 6053.39 4" INV IN = 6048.36 6" INV OUT = 6043.36 STA: 73+11.74 12" NYLOPLAST BASIN DMH#06 RIM = 6029.10 6" INV IN = 6022.38 6" INV OUT = 6022.38 STA: 67+91.43 6" PVC PIPE 50 L.F. @ 1.68% 6" PVC PIPE 50 L.F. @ 0.74% 6" PVC PIPE 42 L.F. @ 0.44% 6" PVC PIPE 50 L.F. @ 2.82% N 6" PVC DRAIN PIPE PUMP HOUSE TO EVAPORATION POND 0 40 80 PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 0 5 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C U S E W E R P L A N & P R O F I L E . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 28 50 STW RWD PB CU112 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K PO N D D R A I N P L A N & P R O F I L E MA T C H L I N E SE E S H E E T C U 1 1 0 WELL & PUMP HOUSE EQUIPMENT SEE SHEET CW101 DRAIN CLEANOUT WITHIN 5' OF BUILDING IS INCLUDED WITH PUMP HOUSE BUILDING. 32 18" SD CULVERT PIPE INV = 6043.80 32 32 32 8" C900 PVC WATERLINE 12" THICK COLLAR34 12" THICK COLLAR34 12" THICK COLLAR 34 ASPHALT ROAD GRAVEL ROAD 4'-0" MIN SEE DETAIL 5 ON SHEET CU502 FOR SURFACING 3'-0" 8" C900 PVC WATERLINE 6" C900 PVC DRAIN PIPE TYPICAL SHARED UTILITY TRENCH DETAIL ELECTRICAL CONDUITS/EQUIPMENT SEE ELECTRICAL PLANS DRAIN PIPE IS SHOWN IN SEGMENTS WITH CHANGING SLOPES TO SHOW PIPE DEFLECTION AT JOINTS. INSTALL PER THE TYPICAL SHARED UTILITY TRENCH DETAIL AS MUCH AS POSSIBLE. 33 33 TANK DRAIN LINES SEE CT501 ARC+,T(CT(1*,1((RSTAMP 8/14/2211/11/24 1 3 4 30 2 5 6 7 810 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 9 Room201 Room202 201 12 KEY DET DESCRIPTION 1 2 3 1 CS501 1 CU501 SITE & PAVING NOTES: 4 2 CS501 2.5" HOT MIX ASPHALT UNTREATED BASE COURSE (4" THICK) RV DUMP STATION 4" CONCRETE FLATWORK 6" CONCRETE FLATWORK 8' CONCRETE WATERWAY DUMPSTER ENCLOSURE BOLLARD 5 2 CS501 KEY DET DESCRIPTION 6 CS501 SIGNAGE & STRIPING NOTES: 9 10 11 STOP, R1-1, 30" WIDTH ONE WAY, R6-2 DO NOT ENTER, R5-1 REDUCE SPEED LIMIT AHEAD, W3-5 15 MPH SPEED LIMIT, R2-1, 24" WIDTH NO LEFT TURN, R3-2, 24" WIDTH 6 3 CS501 12 7 4 CS501 8 5 CS501 13 14 PAVEMENT MARKING PAINT: INSTALL STRIPING AND PAVEMENT MESSAGES PER MUTCD GUIDELINES AND PROJECT SPECIFICATIONS. 6 CS501 6 CS501 6 CS501 6 CS501 6 CS501 PL O T : 20 2 5 - 0 6 - 1 8 1 1 : 1 1 A M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C S . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D 6 AS I 0 0 1 RW D 6/ 1 2 / 2 0 2 5 RW D 7 CC D 0 0 1 RW D 6/ 1 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 LITTLE TRAIL CREEK CAMPGROUND LOST CREEK RD MA T C H L I N E SE E S H E E T C S 1 0 2 Fx. 21182 31 50 STW RWD PB CS101 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K CA M P G R O U N D S I T E P L A N PROPOSED LARGE RESTROOM BUILDING SEE ARCHITECTURAL SHEETS 3 4 N 0 40 80 PROPOSED ENTRY KIOSK SEE ARCHITECTURAL SHEETS 1 1 1 1 1 1 1 1 PARK MONUMENT SIGN INSTALLED BY OTHERS 13 12 6 5 5 9 8 7 7 5 2 2 9 9 11 11 10 14 1 11 109'190' 69' 26' 23' 24' ON L Y 14 911 32' 34' 6 65 LEGEND: UNTREATED BASE COURSE ASPHALT PAVEMENT CONCRETE FLATWORK CRUSHER FINES PATH SEE LANDSCAPE SHEETS ENVIRONMENTAL AREA DO NOT DISTURB SEPTIC LEACH FIELD DO NOT DISTURB PROPERTY LINE PROPERTY LINE RELOCATED LOCATION OF EXISTING VAULT RESTROOM. CONTRACTOR TO ENSURE THE CONCRETE VAULT IS SET AT THE PROPER ELEVATION SO THAT ADA SLOPE REQUIREMENTS ARE MET AROUND THIS AREA. VERIFY FINISH GRADES PRIOR TO PLACEMENT. PROPOSED CAMPSITE (TYP) SEE LANDSCAPE SHEETS PROPOSED CAMPSITE (TYP) SEE LANDSCAPE SHEETS CRUSHER FINES PATH SEE LANDSCAPE SHEETS CRUSHER FINES PATH SEE LANDSCAPE SHEETS DYL SYL RIGHT TURN ARROW RIGHT TURN ARROW "ONLY" PAVEMENT MESSAGE DYL SYL 12" STOP BAR 12" STOP BAR ACCESSIBLE SIGNAGE & PAINTING SEE LANDSCAPE SHEETS ACCESSIBLE SIGNAGE & PAINTING SEE LANDSCAPE SHEETS 10 11 11 8 8 8 CAMPSITE UTILITY POD (TYP) SEE CU101 & CU102 8 CRUSHER FINES PATH SEE LANDSCAPE SHEETS ENVIRONMENTAL AREA DO NOT DISTURB #CAMPSITE NUMBER NOTE: STRAIGHT ARROW 4 DIVIDING LINE FOR FUTURE GROUP CAMPSITES AREA. 8 8 7 6/18/25 Ŝ 1  ŜȦ ŗ Ř Ȧ Ř Ŗ Ř ś 1  ŝ   Ŗ Ŗ ŗ 1  ŜȦ ŗ Ş Ȧ Ř Ŗ Ř ś 1  ŝ 1  ŜȦ ŗ Ş Ȧ Ř Ŗ Ř ś 1  PR 0 0 1 29 31 32 33 X X X X XXX XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X SD KEY DET DESCRIPTION 1 2 3 1 CS501 1 CU501 SITE & PAVING NOTES: 4 2 CS501 2.5" HOT MIX ASPHALT UNTREATED BASE COURSE (4" THICK) RV DUMP STATION 4" CONCRETE FLATWORK 6" CONCRETE FLATWORK 8' CONCRETE WATERWAY DUMPSTER ENCLOSURE BOLLARD 5 2 CS501 KEY DET DESCRIPTION 6 CS501 SIGNAGE & STRIPING NOTES: 9 10 11 STOP, R1-1, 30" WIDTH ONE WAY, R6-2 DO NOT ENTER, R5-1 REDUCE SPEED LIMIT AHEAD, W3-5 15 MPH SPEED LIMIT, R2-1, 24" WIDTH NO LEFT TURN, R3-2, 24" WIDTH 6 3 CS501 12 7 4 CS501 8 5 CS501 13 14 PAVEMENT MARKING PAINT: INSTALL STRIPING AND PAVEMENT MESSAGES PER MUTCD GUIDELINES AND PROJECT SPECIFICATIONS. 6 CS501 6 CS501 6 CS501 6 CS501 6 CS501 N PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 2 4 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C S . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 80400 LOST CREEK R D MA T C H L I N E SE E S H E E T C S 1 0 1 Fx. 21182 32 50 STW RWD PB CS102 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K CA M P G R O U N D S I T E P L A N PROPOSED SMALL RESTROOM BUILDING SEE ARCHITECTURAL PLAN SHEETS. PROPOSED EVAPORATION POND (SEE CS103) 1 2 4 1 1 1 75 5 77' DYL ACCESSIBLE SIGNAGE & PAINTING SEE LANDSCAPE SHEETS 4 PROPOSED GROUP CAMPSITE (TYP) SEE LANDSCAPE SHEETS 8 ACCESSIBLE UTILITY POD (TYP) SEE CU101 & CU102 8 CAMPSITE UTILITY POD (TYP) SEE CU101 & CU102 #CAMPSITE NUMBER NOTE: 6 8 LEGEND: UNTREATED BASE COURSE ASPHALT PAVEMENT CONCRETE FLATWORK CRUSHER FINES PATH SEE LANDSCAPE SHEETS ENVIRONMENTAL AREA DO NOT DISTURB 1 FUTURE IMPROVEMENTS FUTURE IMPROVEMENTS 5 $5&+,7(&7P(1*,1((5A67$03 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 KEY DET DESCRIPTION 1 2 NOT USED 6' CHAIN LINK FENCE 3/4" PVC PIEZOMETER W/ 1-3/4" HOLE 40 MIL RPE POND LINER (130'x110') 8 OZ. GEOTEXTILE (130'X110') PIPE W/ PENETRATION BOOT GENERAL SITE CLEARING. SEE SITE GRADING PLANS FOR LIMITS OF CONSTRUCTION. 4' MAX. ROCK RETAINING WALL SITE PLAN NOTES: 3 2 CS502 4 5 6 4 CS502 5 CS502 5 CS502 5 CS502 7 8 3 CS502 32 X X X X X XXXX X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SD SD SD PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 2 4 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C S . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 33 50 STW RWD PB CS103 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K EV A P . P O N D S I T E P L A N N 60300 LEGEND: UNTREATED BASE COURSE ASPHALT PAVEMENT CONCRETE FLATWORK ENVIRONMENTAL AREA DO NOT DISTURB 6" PVC DRAIN LINE (SEE CU112) 18' MIN. WIDTH FENCE GATE 2 2 2 2 3 4 5 4 5 4 5 666 3 7 7 7 7 5 ARC+,T(CT(1*,1((RSTAMP 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 KEY DET DESCRIPTION 1 SITE PLAN NOTES: 2 3 4 5 6 CONCRETE WATER TANK (SEE CT501-CT507) UNTREATED BASE COURSE (4" THICK) BOLLARD RIP RAP DRAIN PAD GENERAL SITE CLEARING. SEE SITE GRADING PLANS FOR LIMITS OF CONSTRUCTION. 12" THICK RIP RAP DITCH (D50=6") 4" REINF. CONCRETE FLATWORK 6 CT507 1 CU114 5 CS501 2 CS5017 PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 2 5 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C S . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 34 50 STW RWD PB CS104 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K RA N G E R H O U S E S I T E P L A N WELL AC C E S S T A N K A C C E S S 2 2 EXISTING VAULT RESTROOMS AND CONCRETE PAD PROTECT IN PLACE 12' 12' 23' 2 R32' 2 N 40200 2 LEGEND: UNTREATED BASE COURSE ASPHALT PAVEMENT CONCRETE FLATWORK CRUSHER FINES PATH SEE LANDSCAPE SHEETS ENVIRONMENTAL AREA DO NOT DISTURB 20' 94' WELL & PUMP HOUSE EQUIPMENT SEE SHEET CW101 2 2 48' 27' R16' 30' 12' REPLACE 384 SF PUMP HOUSE BUILDING AS DESIGNED PER ARCHITECTURAL PLANS WITH SHIPPING CONTAINER STRUCTURE IN ACCORDANCE WITH THE PERFORMANCE SPECIFICATION. PROVIDE INTERIOR INSULATION, AND A PAINTED EXTERIOR. EXCLUDE ALL THE HIGH END EXTERIOR AND INTERIOR FINISHES. 3 3 1 5 5 5 5 6 6 6 4 20.58' 16.00' 40.56' 65.21' 79.87' R30.00' R36.58' R30.00' 7 7 5 ARC+,T(CT(1*,1((RSTAMP 8/14/2211/11/24 5.00' 32.00' 4.00' 18.00' 1-1/2" SPRING ASSISTED CHECK VALVE 1-1/2" ELECTRIC ACTUATED BALL VALVE 01029501 CTM PLUMBING ADAPTER, 2" NPT, INLET/OUTLET 01021811 VARIABLE FREQUENCY DR. 01029507 01025279 01024803 01016327 AQUA-SENSOR KIT (OUTDOOR-RATED) PRESSURE GAUGE KIT (ON WATER SOFTENER INLET AND OUTLET) BRINE SYSTEM W/ 42" x 48" TANK, 3/4" VALVE & 2700 LB CAPACITY CULLIGAN GBE STANDARD COMMUNICATION CABLE (TO COMMUNICATE WITH SCADA) DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 Fx. 21182 36 50 STW RWD PB CW501 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K WE L L & P U M P H O U S E E Q U I P . 01029687 CULLIGAN EQUIPMENT SCHEDULE OR APPROVED EQUAL MARK PART NO.DESCRIPTIONQTY 2 CTM-300-PF SOFTENER WITH NO HARD WATER BYPASS 2 2 2 2 1 1 GRUNDFOS DOSING PUMP SETUP REFERENCE IMAGE INJECTION QUILL CHLORINE INJECTION SYSTEM NOTES: 1.CHLORINE INJECTION SYSTEM SHALL BE GRUNDFOS DDA 7.5-16 FC W/ WALL MOUNT SKID SUPPLIED BY WATERFORD SYSTEMS OR APPROVED EQUAL. CONTACT NAME: MATT WEIST P:801-463-9900 M:801-633-0036 E:MATT.WATERFORD@GMAIL.COM WEB:WWW.WATERFORDSYSTEMS.COM. 2.CHLORINE INJECTION PUMP TO HAVE DYNAMIC FLOW CONTROL VIA THE FLOW METER. PRELIMINARY DOSING RATES (TO BE VERIFIED BY THE SUPPLIER PRIOR TO OPERATION) ARE AS FOLLOWS: TO BE VERIFIED BY THE SUPPLIER PRIOR TO OPERATION. TO ACHIEVE 2 PPM RESIDUAL SET DOSING RATE TO 0.016 GPH. TO ACHIEVE 0.5 PPM RESIDUAL SET THE DOSING RATE TO 0.004 GPM. 3.SUPPLIER MUST SUPPLY THE DOSING PUMP SYSTEM ON A WALL MOUNT SKID, INCLUDING CALIBRATION COLUMN, MULTIFUNCTION VALVE, PRESSURE GAUGE, WYE STRAINER, VENTED BALL VALVES, TUBING, INJECTION QUILL, AND OTHER MISC. FITTINGS. 0.5 HP WELL SUBMERSIBLE PUMP GRUNDFOS W/ FRANKLIN ELECTRIC MOTOR (1-1/4" DISCHARGE) OR EQUAL HYPOCHLORITE DOSING PUMP INJECTION QUILL W/ BALL VALVE YASKAWA OR EQUAL OTHER EQUIPMENT SCHEDULE MARK ITEM DESCRIPTIONQTY GRUNDFOS DDA 7.5-16 FC W/ WALL MOUNT SKID OR EQUAL GRUNDFOS OR EQUAL (SIZE PER MANUFACTURER'S RECOMMENDATIONS *FLOW METER SHALL BE EQUIPED WITH 4-20 DISPLAY ON THE METER FOR SCADA INTEGRATION (ENSURE FLOW METER HAS REQUIRED UPSTREAM AND DOWNSTREAM DISTANCE OF UNDISTURBED FLOW PER MANUFACTURER'S RECOMMENDATIONS). G2-7HE REVERSE OSMOSIS SYSTEM 750 GAL STORAGE TANK HYPOCHLORITE SOLUTION TANK ON A WEIGHING SCALE AND ON A SECONDARY CONTAINMENT PALLET (18"X18" MIN.) ULINE H2FLOW EYEWASH STATION MODEL NO. H-11042 OR APPROVED EQUAL WITH EMERGENCY SIGN, WALL BRACKET, WATER PRESERVATIVE, INSPECTION TAG AND DRAIN TUBE. 1/2" PVC RETURN LOOP TO TANK 1" PIPE TREATED WATER TO TANK 1" REJECT PIPE 1" PIPE TREATED WATER TO TANK 1-1/2" PIPE TO INTAKE 1-1/4" PVC TANK DRAIN LINE W/ BALL VALVE INTO FLOOR DRAIN SCADA SYSTEM SUPPLIED AND INSTALLED BY OTHERS SEE NOTE 4 BELOW WELL CASING W/ PITLESS ADAPTER AND WELL LEVEL INDICATOR. CONTRACTOR TO PROVIDE A SUBMITTAL ON THE WELL HEAD TO PITLESS ADAPTER CONNECTION AND EXTENSION TO FINISH GRADE ELEVATIONS. 1-1/4" WELL SUPPLY LINE BOLLARD SEE DETAIL 4 ON SHEET CS501 BOLLARD FR O M W E L L NORWESCO OR EQUAL 1 2 3 4 5 6 7 11 2 3 1 2 VALWORX STOCK #: 561212E OR EQUAL2 4 1" AIR RELEASE VALVE1 P U M P T O W A S T E 4 5 SAMPLE VALVE16 GEORG FISCHER MFR. MODEL 161562106 OR EQUAL1 5 1-1/2" FLOW METER* VAL-MATIC MFR. MODEL 38.2 OR EQUAL 27 6 7 3 PUMP TO WASTE FR O M W E L L WELL HEAD - CONDITION AS OF 6/4/2024 5" AIR GAP FITTING28 ZURN WILKINS MFR. MODEL AG-4 OR EQUAL COORD. W/ SHT PE104 8 4" DRAIN PIPE (SEE PE104) 4" DRAIN PIPE (SEE PE104) 3 2 4 5 67 INLETOUTLET 1" REJECT PIPE 1" REJECT PIPE 1-1/4" REJECT PIPE 1-1/2" SCH. 40 PVC PIPE TO WATER SOFTENERSINLETOUTLET 1-1/2" PVC MANUAL BALL VALVE 29 BADGER MFR. MODEL 107-7152 OR EQUAL 810 1 2 8 1" PVC MANUAL BALL VALVE11 12 1 4" FLOOR DRAIN 4 SCH. 80 PVC VAN STONE FLANGE4 WATER TIGHT SEAL INTO TANK (MATCH PIPE SIZE)13 2" STAINLESS FLANGED BALL VALVE414 VALWORX STOCK #: 553016A OR EQUAL 1416 1/2" PVC PRESSURE RETAINING VALVE1 UNITED STATES PLASTIC CORP. ITEM 20895 OR EQUAL 15 3 HP RE-PRESSURIZATION PUMP BALDOR - 3ph TPE - (V09A32E5BB2S) W/ 1-1/4" INLET/OUTLET OR EQUAL2 15 14 4 10 13 13 16 KECKLEY MRF. MODEL DD1F-CI-34136-200 OR EQUAL2 4 2" WAFER STYLE CHECK VALVE 17 1-1/2" PIPE TO INTAKE 19 20 21 1 18 19 1 20 7 1-1/2" PRESSURE GAUGE1 ASHCROFT MFR. MODEL 251009SW02L160# OR EQUAL 17 SODIUM HYPOCHLORITE 5.25%5 GAL - ALLIANCE CHEMICAL SKU:B7-CO3H-YQZK OR EQUAL121 2 EXISTING GROUND ELEVATION AT WELL HEAD = 6044.07 WELL HOUSE FF ELEV. = 6053.50 2" TO 1-1/2" REDUCER 10 SEE ELEVATION VIEW FOR OTHER VALVES IN THIS AREA PLAN VIEW ELEVATION VIEW TO 1 4 0 K G A L T A N K 10 BYPASS VALVE (NORMALLY CLOSED) 10 CTM CONTROLLER 10 HARD WATER INLETSOFT WATER OUTLET 2 1 3 4 5 6 7 7 10 11 11 1-1/2" PVC TANK OUTLET 11ON VERTICAL PIPE 1" REJECT PIPE 11 1-1/2" SCH. 40 PVC PIPE TO WATER SOFTENERS1-1/2" SCH. 40 PVC PIPE TO WATER SOFTENERS 1-1/2" SCH. 40 PVC PIPE TO REVERSE OSMOSIS SYSTEMS 11ON TREATED WATER PIPE ON REJECT PIPE 18 17 12 12 TO 1 4 0 K G A L T A N K 15 1" REJECT PIPE 1416 14 21 20 WALL MOUNT SKID FOR DOSING PUMP BOLLARD SEE DETAIL 4 ON SHEET CS501 1-1/2" X 1-1/4" REDUCER 1-1/2" X 1-1/4" REDUCER WALL MOUNT SKID FOR DOSING PUMP HYPOCHLORITE SOLUTION TANK ON A WEIGHING SCALE AND ON A SECONDARY CONTAINMENT PALLET (18"X18" MIN.) 4" REINF. CONCRETE FLATWORK TR E A T E D W A T E R T O T A N K RE J E C T W A T E R T O F L O O R D R A I N FF ELEVATION: 6053.50 FF ELEVATION: 6053.50FF ELEVATION: 6053.50 PL O T : 20 2 5 - 0 5 - 2 3 0 2 : 5 7 P M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C W _ W E L L & P U M P H O U S E . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP 1 AD J U S T M E N T S P R I O R T O B I D SW RW D 12 / 1 4 / 2 0 2 4 2 BI D A D D E N D U M 2 RW D 3 BI D A D D E N D U M 3 JR P RW D 4/ 3 / 2 0 2 5 3/ 2 5 / 2 0 2 5 RW D 4 BI D A D D E N D U M 4 RW D 4/ 1 7 / 2 0 2 5 RW D 5 PO S T B I D A D D E N D U M 5 RW D 5/ 8 / 2 0 2 5 RW D PUMP HOUSE EQUIPMENT NOTES: 1.LAYOUT IS SCHEMATIC AND BASED ON INFORMATION FROM THE MANUFACTURER. ONCE THE MATERIAL HAS BEEN PURCHASED, CONTRACTOR MAY ADJUST EQUIPMENT LOCATIONS BASED UPON FINAL MANUFACTURER'S RECOMMENDATIONS. 2.CONTRACTOR SHALL PROVIDE STRAPS, SUPPORTS, ETC. AS NEEDED TO PROVIDE A SECURE PLUMBING SYSTEM AND KEEP ALL PIPES STEADY TO PREVENT BREAKING AND LEAKS. 3.COORDINATE WITH ELECTRICAL AND MECHANICAL PLANS FOR ELECTRIC PANELS, WALL HEATERS, ETC. 4.SCADA SYSTEM EQUIPMENT & INSTALLATION IS NOT PART OF THE CONTRACT. THE PROJECT OWNER WILL HIRE IEI - INTERMOUNTAIN ENVIRONMENTAL, INC. OR OTHER APPROVED SUPPLIER FOR INSTALLATION. CONTRACTOR IS REQUIRED TO COORDINATE WITH SCADA PROVIDER FOR PROPER EQUIPMENT OPERATION AND COMMUNICATION BETWEEN WELL AND TANK. EMAIL: INFO@INMTN.COM 5.EQUIPMENT SHALL BE FULLY OPERATIONAL PRIOR TO ACCEPTANCE. CONTRACTOR SHALL BE RESPONSIBLE TO OVERSEE THE EQUIPMENT OPERATION AND CALIBRATION TO ENSURE A FULLY OPERATIONAL WATER SYSTEM. CONTRACTOR TO FILL THE 140,000 GALLON CONCRETE WATER TANK AND PERFORM ALL NECESSARY TESTING OF EQUIPMENT TO ENSURE EQUIPMENT IS FUNCTIONING PROPERLY. 6.ALL EQUIPMENT SHALL BE SUPPLIED WITH OPERATIONS & MAINTENANCE MANUALS AS WELL AS ON-SITE TRAINING FOR STATE PARK MANAGEMENT STAFF. TO E V A P . P O N D 4" PVC DRAIN CLEANOUT WITHIN 5' OF BUILDING FOUNDATION (SEE PE104) COORDINATE ELEVATION WITH SHT CU112 9 9 9 9 SEE SHEET PE104 SEISMIC STRAPS (TOP THIRS AND BOTTOM THIRD) SEISMIC STRAPS (TOP THIRD AND BOTTOM THIRD) POWER PANEL (SEE ELECTRICAL PLANS) PIPE SUPPORTS AS NECESSARY SECURE PIPE TO WALLS AS NECESSARY 8 8 PIPE SUPPORTS AS NECESSARY PIPE SUPPORTS AS NECESSARY SECURE PIPE TO WALLS AS NECESSARY SECURE PIPE TO WALLS AS NECESSARY 4" DRAIN PIPE (SEE PE104) 1 FT 4" DRAIN PIPE (SEE PE104) 4" DRAIN PIPE (SEE PE104) 4" DRAIN PIPE (SEE PE104) 4" DRAIN PIPE (SEE PE104) AIR GAP INTO FUNNEL DRAIN (SEE PE104) 1 INCH AIR GAP INTO FUNNEL DRAIN (SEE PE104) PIPES AND FITTINGS ARE DRAWN SCHEMATICALLY (SEE PE104) PIPES AND FITTINGS ARE DRAWN SCHEMATICALLY (SEE PE104) 20" OFSY1 20" OFSY FILTER SYSTEM - PRETREATMENT FILTER (SYSTEM HAS TWO TANKS)8 140K GAL TANK MIXER (SEE CT501)UWM50 PAX MIXER SUPPLIED BY WATERFORD SYSTEMS OR EQUAL1 6 8 5 5 ARCHITECTENGINEER STAMP 8/14/2211/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024 DETAIL - 4' ROCK RETAINING WALL PL O T : 20 2 4 - 1 1 - 0 9 0 8 : 3 8 A M PA T H : L: \ U T A H \ P R O J E C T S \ A C T I V E 2 0 2 1 \ F X 2 1 1 8 2 . 0 0 - L O S T C R E E K S T A T E P A R K \ 8 0 0 - C A D \ 8 4 0 - S H E E T S \ 2 1 1 8 2 _ C D T . D W G DRAWN BY: CHECKED BY: PROJ. #: SHEET OF DESIGN BY: RE V I S I O N BY NO . DE S C R I P T I O N DA T E AP R . 14 5 3 S . D I X I E D R I V E , S T E 1 5 0 ST . G E O R G E , U T 8 4 7 7 0 43 5 . 9 8 6 . 0 1 0 0 ARCHITECT/ENGINEER STAMP CODE COMPLIANCE STAMP Fx. 21182 46 50 STW RWD PB CS502 DF C M P R O J E C T N O . 2 2 0 8 7 5 1 0 ST A T E O F U T A H LO S T C R E E K S T A T E P A R K SI T E D E T A I L S DETAIL - 6' CHAIN LINK FENCE DETAIL - PROJECT SIGN1 3 2 LOST CREEK STATE PARK STATE OF UTAH DFCM 450 STATE STREET, SALT LAKE CITY, UT CIVIL SCIENCE 1453 S. DIXIE DRIVE, ST GEORGE, UT Contractor Address (second line) Financed by State of Utah Division of Facilities, Construction, and Management White Background Black Lettering Contractor logo here STATE OF UTAH DFCM - DNR STATE PARKS APA RATED A-B GRADE EXTERIOR PLYWOOD PANEL (3/4" THICK) 8'-0" 12" 4' 4' - 0 " 12 ' M I N . 2' 12" BOLT HOLE LOCATION TYPICAL (10) PLACES 2"x4" TYPICAL 4"x4" TREATED POST TYP. (2 PLACES) 3' M I N . 3' M I N . SIGN FRAME AND EMBEDMENT GENERAL ROCK WALL AND LANDSCAPING ROCK NOTES: 1.EACH ROCK IS TO BE PLACED INDIVIDUALLY BY EQUIPMENT SUITABLE FOR LIFTING, MANIPULATING, AND PLACING ROCKS OF THE SIZE AND SHAPE SPECIFIED. ENSURE THAT EACH ROCK IS SET AND SUPPORTED BY UNDERLYING MATERIALS AND ADJACENT ROCKS. REPOSITION AND REPLACE LOOSE ROCKS. 2.BOULDERS SHOULD BE FLAT FOR STACKING WITH THE LARGEST BOULDERS PLACED AT THE BASE OF THE WALL. 3.DIRECT RUNOFF AWAY FROM THE WALL GEOTEXTILE FABRIC ON ALL SIDES OF DRAIN ROCK LOCALLY SOURCED BOULDERS PER PLAN PER PLAN SCARIFY AND COMPACT SUBGRADE 6" OF 1" MINUS DRAIN ROCK Black Lettering 4'-0" MAX. 0.25 1 DETAIL - 3/4" PVC PIEZOMETER W/ 1-3/4" HOLE (10 FEET)4 DETAIL - EVAPORATION POND INSTALLATION5 1 EVAPORATION POND INSTALLATION NOTES: 1.POND LINER SHALL BE 40 MIL. BLACK AQUAARMOR DOUBLE SCRIM REINFORCED POLYETHYLENE LINER BY BTL LINERS OR APPROVED EQUAL. LINER SHALL BE IN ONE PIECE (130'x110') FOR EACH SEPARATE POND. LINER SHALL HAVE A MINIMUM 20 YEAR WARRANTY IN DIRECT UV EXPOSURE. 2.8 OZ. GEOTEXTILE SHALL BE NON WOVEN AND PLACED BETWEEN THE SOIL AND THE POND LINER. 3.CONTRACTOR SHALL CAREFULLY PREPARE THE SOIL SUBGRADE BELOW THE POND LINER TO BE SMOOTH AND FREE OF ROCKS OR SHARP OBJECTS. 4.INSTALL WELD-ON PIPE BOOT PER MANUFACTURERS INSTALLATION RECOMMENDATIONS AND WELD-ON PIPE BOOT INSTALLATION NOTES. 1' 2' MIN.1' 40 MIL. RPE LINER OVER 8 OZ. GEOTEXTILE FABRIC WATER SURFACE W/ 1' FREEBOARD 1.5' 6" SEWER PIPE (0.5% MIN. SLOPE) PREPARED AND COMPACTED TO 95% OF MAX. DRY DENSITY. NATIVE SOIL CLEARED AND FREE OF DEBRIS OR SHARP OBJECTS 1' 2' MIN.1' 40 MIL. RPE LINER OVER 8 OZ. GEOTEXTILE FABRIC WATER SURFACE W/ 1' FREEBOARD 1.5'6" SEWER PIPE (0.5% MIN. SLOPE) PREPARED AND COMPACTED TO 95% OF MAX. DRY DENSITY. NATIVE SOIL CLEARED AND FREE OF DEBRIS OR SHARP OBJECTS SECTION - PIPE BETWEEN PONDS SECTION - PIPE ENTRANCE TO FIRST POND WELD ON PIPE BOOT WELD ON PIPE BOOT COMPACTED SOIL ANCHOR TRENCH COMPACTED SOIL ANCHOR TRENCH 4 1 4 12' 6' CHAIN LINK FENCE 3/4" PVC PIEZOMETER 1-3/4" DIRECT PUSH PIEZOMETER HOLE 10' DEPTH DIRECT PUSH PIEZOMETER LAST 4' SCREENED PIEZOMETER NOTES: 1.DRILL BOREHOLE: DRILL TO THE SPECIFIED DEPTH, MAINTAINING BOREHOLE STABILITY WITH CASING IF NEEDED. 2.PLACE PIEZOMETER TIP: POSITION THE STANDPIPE TIP AT THE TARGET DEPTH AND SURROUND WITH A SAND PACK FOR WATER FLOW. 3.SEAL WITH BENTONITE: ADD A BENTONITE SEAL ABOVE THE SAND PACK TO PREVENT WATER MIGRATION. 4.GROUT THE BOREHOLE: FILL THE REST OF THE BOREHOLE WITH A BENTONITE-CEMENT GROUT UP TO THE SURFACE. 5.INSTALL PROTECTIVE COVER: PLACE A PROTECTIVE CASING AT GROUND LEVEL AND LABEL IT WITH INSTALLATION DETAILS. 6.VERIFY AND TEST: CONFIRM INSTALLATION DEPTH, PERFORM AN INITIAL READING, AND ENSURE FUNCTIONALITY. FENCE GATE NOTES: 1.CONTRACTOR TO SUBMIT GATE SHOP DRAWINGS TO ENGINEER FOR APPROVAL. WELD-ON PIPE BOOT INSTALLATION NOTES: 1.PLAN NOTES FOR RPE LINER PIPE BOOT WELDING MATERIAL COMPATIBILITY: ENSURE THE PIPE BOOT IS COMPATIBLE WITH RPE LINER MATERIAL. 2.SURFACE PREPARATION: CLEAN AND DRY THE AREA AROUND THE PIPE AND LINER THOROUGHLY; ENSURE THE BOOT FITS SNUGLY AROUND THE PIPE. 3.OVERLAP REQUIREMENTS: POSITION THE PIPE BOOT FLANGE TO OVERLAP THE LINER BY A MINIMUM OF 3 INCHES. 4.WELDING METHOD: USE EXTRUSION WELDING ALONG THE BOOT FLANGE EDGES; HOT-AIR WELDERS MAY BE USED FOR TACKING. 5.TEMPERATURE CONTROL: MAINTAIN EXTRUSION WELDING TEMPERATURES BETWEEN 300°C–350°C, ADJUSTING BASED ON CONDITIONS. 6.TESTING: PERFORM VACUUM BOX TESTING TO CONFIRM WELD INTEGRITY; INSPECT VISUALLY FOR CONSISTENT WELD QUALITY. 7.DOCUMENTATION: RECORD WELDING PARAMETERS, TESTING RESULTS, AND ANY REPAIRS MADE. 11/11/24 DIVISION OF FACILITIES CONSTRUCTION ANDMANAGEMENT REVIEWED FOR CODE COMPLIANCE Thomas W Peterson 11/26/2024