Loading...
HomeMy WebLinkAboutDAQ-2024-0073481 DAQC-316-24 Site ID 10303 (B5) MEMORANDUM TO: CEM FILE – ASH GROVE CEMENT COMPANY THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Rob Leishman, Environmental Scientist DATE: April 5, 2024 SUBJECT: Source: Main Kiln Contact: Cody Watkins – 435-857-1283 Location: Highway 132, 6 miles East of Leamington, Millard County, UT Test Contractor: Mostardi Platt FRS ID#: UT0000004902300015 Permit/AO#: Title V operating permit 2300015005 dated September 22, 2023 Last Revision September 22, 2023 Subject: Review of RA/PST Protocol dated April 3, 2024 On April 3, 2024, Utah Division of Air Quality (DAQ) received a protocol for a RA/PST (relative accuracy/performance specification test) of the Ash Grove Cement Company Main Kiln stack near Leamington, Utah. Testing will be performed on June 11, 2024, to determine the relative accuracy of the HCL, Hg, O2, CO2, NOX, and CO monitoring systems. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3A used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 25A used to determine total gaseous organic concentration by flame ionization detector: OK 6. RM 30B used to determine Mercury emissions by sorbent trap: OK 7. RM 205 used to validate gas dilution systems for field instrument calibration: OK 8. RM 320/321 used to measure Vapor Phase Organic and Inorganic Emissions by Fourier transform Infrared (FTIR) Spectroscopy: OK 1 8 2 2 DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send attached protocol review and test date confirmation notice.