HomeMy WebLinkAboutDAQ-2024-0073411
DAQC-314-24
Site ID 10337 (B4)
MEMORANDUM
TO: STACK TEST FILE – UTAH METAL WORKS INCORPORATED – Utah Metal
Works
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: April 4, 2024
SUBJECT: Source: Unit 1: One (1) Wire Chopper Baghouse and Cyclone,
Unit 2: Gravity Separator Baghouse and Cyclone, and
One (1) Chopping Line Baghouse
Location: 805 Everett Avenue, Salt Lake City, UT
Contact: Brenda Terry: 801-364-5679
Tester: Alliance Technical Group
Site ID #: 10337
Permit/AO #: DAQE-AN103370009-24 dated March 27, 2024
Subject: Review of Pretest Protocol received April 3, 2024
On April 3, 2024, Utah Division of Air Quality (DAQ) received a test notification for the testing of the
above listed units located at Utah Metal Works in Salt Lake City, Salt Lake County, UT. Testing will be
performed May 7, 2024, through May 9, 2024, to determine compliance with the emission limits found in
condition II.B.3.A of Approval Order DAQE-AN103370009-24.
PROTOCOL CONDITIONS:
1. RM 1 used to determine sample velocity traverses: OK
2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK
3. RM 3A used to determine dry molecular weight of the gas stream: OK
4. RM 4 used to determine moisture content: OK
5. RM 201A used to determine PM10 emissions: OK
DEVIATIONS: No deviations stated in the protocol.
CONCLUSION: The protocol appears to be acceptable.
RECOMMENDATION: Send protocol review and test date confirmation notice.
ATTACHMENTS: Utah Metal Works pretest protocol.
2
3
4
5
6
7
8
9
10
11
12
13