HomeMy WebLinkAboutDAQ-2025-003195April29,2024
CERTIFIED MAIL: 9s89 0710 5270 1318 3713 15
tu
BigWestEil>
DEPARTMENT OF
ENVIRONMENTAT CUATITY
IJAY - 5 202s
DMSIO{ OF AR OI.IAIITV
Bryce Bird, Director
Utah Department of Environmental Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, Utah 84114-4820
RE: Tank 9 Degassing and Refill Notification; Utah SIP Section IX.H.I1.g.vi., UAC307-327-5(5)
Dear Mr. Bird:
This letter is notification that Big West Oil, LLC will be deinventorying, degassing, inspecting, maintaining, and refilling
Tank 9. This notification is being provided in accordance with requirements of Utah SIP Section IX.H.I l.g.vi.,
$60. I I 3b(a)(5), and U AC307 -327-5(5). Tank degassing operations are currently scheduled for the week of May Sth, 2025 .
The schedule for the tank refill will depend on maintenance but is currently anticipated to return to service May 26'h,2025.
The following table provides the information required by Utah State Implementation Plan Section IX.H.l 1.g.vi.C., for a
tank degassing notifi cation:
SIP Citation Requirement Detail
IX.H.1l.g.v C.I Start Date & Time May 5th2025,08:00 AM
IX.H.l l.g.vi.C.II Tank Owner Big West Oil LLC
Address 333 West Center Street, North Salt Lake, UT 84054
Tank Location Tank Farm
Applicable Tank Permit Numbers Tank 9 is covered by DAQE-AN101220080-23
Degassing Operator's Name Envent
Contact Person Daniel Rapaport
Telephone Number (s62) 7s6-s884
Tank Capacity Approximately I 7,400 bbls.
Volume of Space to be Degassed Up to approximately 15,000 ft3
Materials Stored Wastewater
IX.H.l l.g.vi.C.V Description of Vapor Control Device Portable Thermal oxidizer
Should you have any questions or require further information, please contact me at (385) 324-1256.
Sincerely,
Eric Simdom
Environmental Engineer
CC: Mr. Jeremy Marsigli, UDAQ - jmarsigli@utah.gov
B-2-10122