Loading...
HomeMy WebLinkAboutDERR-2025-004928You don't often get email from jkatz@utah.gov. Learn why this is important Joseph Katz <jkatz@utah.gov> RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power District Property 1 message Wilson, DavidWilson <DavidWilson.Wilson@tetratech.com>Thu, Jan 9, 2025 at 12:12 PM To: Joseph Katz <jkatz@utah.gov>, "Wetzel, Scott (PacifiCorp)" <Scott.Wetzel@pacificorp.com> Cc: Bill Rees <brees@utah.gov>, Jeff Tucker <jct4pac@gmail.com>, "carl.duke" <carl.duke@lhm.com>, "matthew.blocker@lhm.com" <matthew.blocker@lhm.com>, "Stripeika, Curt" <CURT.STRIPEIKA@tetratech.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Thanks Joe, Carl and Scott – I will issue an invite for Tuesday, January 21, 2025 with a time from 1 to 2:30 PM. Scott – This may be a bit tight for your 2:30 PM other commitment, but the window appears rather narrow – so hope this works, and we understand if you need to step away a few minutes early. Joe – Can you please set up a conference room where we can meet; I expect we’ll need room for 10-12 participants. Appreciate everyone’s responses to schedule this meeting! Regards, Dave W. David S. Wilson, P.E., P.G., Senior Principal Engineer | Tetra Tech Business +1 (801) 736-7451 | Mobile +1 (801) 916-6957 | davidwilson.wilson@tetratech.com This message, including any attachments, may include privileged, confidential and/or inside information. Any distribution or use of this communication by anyone other than the intended recipient is strictly prohibited and may be unlawful. If you are not the intended recipient, please notify the sender by replying to this message and then delete it from your system. From: Joseph Katz <jkatz@utah.gov> Sent: Wednesday, January 8, 2025 11:32 AM To: Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Bill Rees <brees@utah.gov>; Wilson, DavidWilson <DavidWilson.Wilson@tetratech.com>; Jeff Tucker <jct4pac@gmail.com>; carl.duke <carl.duke@lhm.com>; matthew.blocker@lhm.com; Stripeika, Curt <CURT.STRIPEIKA@tetratech.com>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: Re: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power District Property 7/3/25, 11:24 AM State of Utah Mail - RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1820542563294797897%7Cmsg-f:1820799759174560793…1/5 ⚠ CAUTION: This email originated from an external sender. Verify the source before opening links or attachments. ⚠ Hello Scott, Thanks. It looks like Bill and I are available on 1/21 from 1:00 - 2:30 or from 3:00 - 4:30. On 1/22 and 1/23, we are available most of the day except 9:00 - 10:00. Please let me know what works best for you and I will find accommodations at the DEQ office building. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Wed, Jan 8, 2025 at 11:17 AM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, I just noticed that you weren’t included in the original email on this meeting request for the Rocky Mountain Power Redevelopment project with the LHM team. The details of proposed times are in the email chain below. Thanks, Scott Scott Wetzel 801.220.2427 | 801.631.4572 7/3/25, 11:24 AM State of Utah Mail - RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1820542563294797897%7Cmsg-f:1820799759174560793…2/5 Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> Sent: Tuesday, January 7, 2025 9:17 AM To: Carl Duke <carl.duke@lhm.com>; Wilson, DavidWilson <DavidWilson.Wilson@tetratech.com>; brees@utah.gov; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com>; Jeff Tucker <jct4pac@gmail.com> Cc: Matthew Blocker <matthew.blocker@lhm.com>; Stripeika, Curt <CURT.STRIPEIKA@tetratech.com> Subject: RE: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power District Property At this point my calendar is open for during the times Carl has available below except for 2:30-3 on Tuesday 1/21. But if that time works best for everyone else I can move that meeting. Also including Jeff Tucker in this discussion for a meeting. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:24 AM State of Utah Mail - RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1820542563294797897%7Cmsg-f:1820799759174560793…3/5 From: Carl Duke <carl.duke@lhm.com> Sent: Monday, January 6, 2025 3:58 PM To: Wilson, DavidWilson <DavidWilson.Wilson@tetratech.com>; brees@utah.gov; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com>; Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> Cc: Matthew Blocker <matthew.blocker@lhm.com>; Stripeika, Curt <CURT.STRIPEIKA@tetratech.com> Subject: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power District Property THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Thank you Bill for your willingness to meet with us. I am available Tuesday morning before 9:30 and after 11:00, I can move most of my appointments on Thursday the 23rd. I am not available on the 22nd. Best, From: "Wilson, DavidWilson" <DavidWilson.Wilson@tetratech.com> Date: Monday, January 6, 2025 at 3:54 PM To: Bill Reese <brees@utah.gov>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com>, "Wetzel, Scott (PacifiCorp)" <scott.wetzel@pacificorp.com> Cc: Carl Duke <carl.duke@lhm.com>, Matthew Blocker <matthew.blocker@lhm.com>, "Stripeika, Curt" <CURT.STRIPEIKA@tetratech.com> Subject: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power District Property Hello Bill, Mike and Scott – Happy New Year! Carl Duke of Larry H. Miller Real Estate (LHM) has asked that Tetra Tech coordinate a meeting between the Utah DEQ/DERR, RMP, and LHM/Tetra Tech to discuss LHM’s plans for the RMP property within the greater Power District project. A key element of these plans will be LHM’s assumption of responsibility to conduct the Voluntary Cleanup 7/3/25, 11:24 AM State of Utah Mail - RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1820542563294797897%7Cmsg-f:1820799759174560793…4/5 Program (VCP) initiated by RMP for its property during the coming years. We would like to bring appropriate representatives together from each organization during the week of January 20, 2025 if it works for everyone. Can you please “reply to all” to confirm your availability for a meeting on one or more of these dates/times; and please recommend preferred times (if any). We propose to make this an in-person meeting at the Utah DERR Office if Bill can set up a room where we can meet (assume 1.5 hours). Tuesday, Jan. 21 – Morning Wednesday, Jan. 22 – Anytime Thursday, Jan. 23 – Anytime I ask Carl and Matt to compare calendars and provide similar input on their preferred dates with a “reply to all.” We will defer particularly Bill and his team based on when they can host the meeting at DERR’s office. Thanks for your responses! Dave W. David S. Wilson, P.E., P.G. | Senior Principal Engineer Business +1 (801) 736-7451 | Mobile +1 (801) 916-6957 | davidwilson.wilson@tetratech.com Time Zone: Mountain Tetra Tech | Leading with Science® 4750 West 2100 South, Suite 400 | Salt Lake City, Utah 84120 | tetratech.com This message, including any attachments, may include privileged, confidential and/or inside information. Any distribution or use of this communication by anyone other than the intended recipient is strictly prohibited and may be unlawful. If you are not the intended recipient, please notify the sender by replying to this message and then delete it from your system. 7/3/25, 11:24 AM State of Utah Mail - RE: FW: [INTERNET] Re: Meeting to Discuss LHM Approach for VCP at Rocky Mountain Power (RMP) Power … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1820542563294797897%7Cmsg-f:1820799759174560793…5/5 Joseph Katz <jkatz@utah.gov> Re: Rocky Mountain Power - North Temple Redevelopment - Revised Arsenic and Lead Risk Evaluation - VCP Area A 1 message Scott Everett <severett@utah.gov>Thu, Feb 6, 2025 at 9:16 AM To: Joseph Katz <jkatz@utah.gov> I think we're good. On Tue, Feb 4, 2025 at 11:46 AM Joseph Katz <jkatz@utah.gov> wrote: Hello Scott, I have completed review of the Rocky Mountain Power Revised Risk Evaluation (see below). I did not have any comments. I just wanted to confirm that you have looked at it and did not have any comments either. I believe you worked on this with them over the holidays and I think you mentioned that you did not have any additional concerns but I wanted to double check. Thanks, Joe ---------- Forwarded message --------- From: Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> Date: Mon, Dec 30, 2024 at 9:38 AM Subject: Rocky Mountain Power - North Temple Redevelopment - Revised Arsenic and Lead Risk Evaluation - VCP Area A To: Scott Everett <severett@utah.gov>, Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com> Hi Scott and Joe, Attached is the revised arsenic and lead risk evaluation document we discussed, as well as the new figure and revised input/output information for the calculated EPCs. Please let me or Dan know if you have any questions as you review these documents. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 7/3/25, 11:24 AM State of Utah Mail - Re: Rocky Mountain Power - North Temple Redevelopment - Revised Arsenic and Lead Risk Evaluation - VCP … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1819884090011408219%7Cmsg-f:1823325417130548048&…1/2 1407 W North Temple, Salt Lake City, UT 84116 -- Scott Everett Toxicologist | DERR M: (801) 536-4100 P: (385) 391-8149 Please note my new phone number environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 7/3/25, 11:24 AM State of Utah Mail - Re: Rocky Mountain Power - North Temple Redevelopment - Revised Arsenic and Lead Risk Evaluation - VCP … https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1819884090011408219%7Cmsg-f:1823325417130548048&…2/2 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Re: VCP Area RAP(s) question 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Mon, Mar 3, 2025 at 5:36 PM To: Joseph Katz <jkatz@utah.gov> Cc: "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Thanks Joe, We’re nearing having the draft work plan ready to send to you. We are also updating the legal description of the VCP Areas. If we get the draft work plan completed before the legal descriptions, should we send the draft work plan to you to start the review prior to having the legal descriptions of the areas submitted? Also, do you need a drawing with the new Areas, or just the legal description? Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Thursday, February 27, 2025 5:54 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> 7/3/25, 11:25 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1825621759027360215…1/3 Cc: Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: [INTERNET] Re: VCP Area RAP(s) queson THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Glad to hear things are coming together. I believed we did discuss this somewhat during our meeting a few weeks back. I am assuming the enlargement of Area B is to accommodate utility access that will support development in Area B. Is that correct? A single characterization plan and report for Area B makes a lot of sense to me, so no concerns there. In terms of your questions about two risk assessments and RAPs for the same area, I am not sure we have ever had to address this scenario before under the VCP. While the rationale for doing this is very clear, I can anticipate some objections on our end about the potential for confusion with two RAPs covering the same area, particularly in the public arena during public comment. If the documents are very clear and deliberate about the boundaries they cover, I think we could work through this, but I will bring this up with Bill when he gets back next week to make sure I am not missing anything. I will get back with you after I speak with Bill. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Feb 25, 2025 at 11:52 AM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, We’re nearing having the Site Characterization Work Plan finalized with the new legal description of the boundary that we will be investigating. A question has come up that I think we discussed but I wanted to get confirmation from you. 7/3/25, 11:25 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1825621759027360215…2/3 Currently in our VCA we have VCP Area A, Area B, Area C, and Area D. We are going to keep the same footprint, but slightly enlarge Area B, which will require us to slightly reduce Area C and Area D. Area B will be the focus of the Site Characterization Work Plan and the next phase of investigation. Area B will include the new RMP headquarters area as well as a development area for LHM. Once the Site Characterization Work Plan is approved we plan to conduct a single investigation (rather than an RMP investigation and a LHM investigation) and develop one (1) Site Characterization Report. Here’s my question: once the Site Characterization Work plan is complete and accepted by DEQ/DERR, RMP will do a risk assessment and develop a RAP for the intended use of the property we will develop (likely commercial due to it being an office building space); and LHM will do a risk assessment and develop a RAP for the intended use of the property they will develop (likely residential). Is it acceptable to have the two different risk assessments/RAPs for the two different areas/land uses within the same VCP Area (B)? Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:25 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1825621759027360215…3/3 Joseph Katz <jkatz@utah.gov> Draft VCP Area B Work Plan 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Mon, Mar 10, 2025 at 3:20 PM To: Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>, Jeff Tucker <jct4pac@gmail.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, "Wilson, DavidWilson" <DavidWilson.Wilson@tetratech.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Hi Joe, Here is the draft work plan for the next phase (Area B) of investigation at the North Temple Redevelopment site. We are working on updated legal descriptions of the adjacent VCP Areas (Areas C and D) and will send those to you, along with the legal description for Area B, to amend those areas in the VCA. Thank you, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 VCP 119 Area B Work Plan DERR Draft 03 10 2025.pdf 16903K 7/3/25, 11:26 AM State of Utah Mail - Draft VCP Area B Work Plan https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1826243634584369015%7Cmsg-f:1826243634584369015…1/1 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Re: Draft VCP Area B Work Plan 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Fri, Mar 14, 2025 at 9:05 AM To: Joseph Katz <jkatz@utah.gov> Thanks Joe, Any thoughts on the need for an official site map to go along with the updated VCP areas? Or do you just need the legal description of the updated boundaries? When it’s reviewed and ready to go, should I send the new legal descriptions (and site map if needed) in an official request to you to modify the VCA? Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Wednesday, March 12, 2025 5:43 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Subject: [INTERNET] Re: Dra VCP Area B Work Plan 7/3/25, 11:27 AM State of Utah Mail - RE: [INTERNET] Re: Draft VCP Area B Work Plan https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1826243634584369015%7Cmsg-f:1826582384893042370…1/3 THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, I have received the work plan and will start working on reviewing it. I am still working to get a perspective on the questions about two RAPs for the same area question. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Mon, Mar 10, 2025 at 3:20 PM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, Here is the draft work plan for the next phase (Area B) of investigation at the North Temple Redevelopment site. We are working on updated legal descriptions of the adjacent VCP Areas (Areas C and D) and will send those to you, along with the legal description for Area B, to amend those areas in the VCA. Thank you, Scott Scott Wetzel Env Remediation & Reclamation Mgr 801.220.2427 | 801.631.4572 7/3/25, 11:27 AM State of Utah Mail - RE: [INTERNET] Re: Draft VCP Area B Work Plan https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1826243634584369015%7Cmsg-f:1826582384893042370…2/3 RMP Environmental Services | PacifiCorp scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:27 AM State of Utah Mail - RE: [INTERNET] Re: Draft VCP Area B Work Plan https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1826243634584369015%7Cmsg-f:1826582384893042370…3/3 Joseph Katz <jkatz@utah.gov> FW: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Wed, Mar 26, 2025 at 2:34 PM To: Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Hi Joe, I don’t remember seeing an update on this one, if so I’m sorry. If not, I just wanted to get this back on your radar. This is draft language that we had proposed to use regarding the Jordan River and include as an addendum to the VCP Area A RAP. If acceptable, we would also use this language to finalize the Jordan River Sediment report. I know we’ve put a few things on your plate right now, so from my perspective I don’t want this to take priority over your review of the Area B work plan review. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:28 AM State of Utah Mail - FW: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1802327454107155440%7Cmsg-f:1827690295250141161&…1/3 From: Wetzel, Scott (PacifiCorp) Sent: Wednesday, June 19, 2024 3:43 PM To: Joseph Katz <jkatz@utah.gov> Subject: FW: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment Hi Joe, Here is the draft language we discussed in our meeting today. More emails to follow. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Wetzel, Scott (PacifiCorp) Sent: Thursday, April 11, 2024 11:53 AM To: Chris Howell <cjhowell@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com>; Jeff Tucker <jct4pac@gmail.com> Subject: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment Hi Chris, Attached for your review is a draft outline of the items we discussed for inclusion in a RAP amendment. Thanks for reviewing and providing feedback. Any questions please let me/us know. 7/3/25, 11:28 AM State of Utah Mail - FW: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1802327454107155440%7Cmsg-f:1827690295250141161&…2/3 Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 2 attachments Draft Language for the Addendum to the VCP Area A RAP,ver2.docx 26K f1_Area A - ROC-Layout1.pdf 1636K 7/3/25, 11:28 AM State of Utah Mail - FW: draft language/outline for Rocky Mountain Power Redevelopment RAP amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1802327454107155440%7Cmsg-f:1827690295250141161&…3/3 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Area B Site Visit 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Tue, Apr 1, 2025 at 4:53 PM To: Joseph Katz <jkatz@utah.gov> Cc: Jeff Tucker <jct4pac@gmail.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Joe, Wednesday (4/9) works for us. Let’s plan on 11:00. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Tuesday, April 1, 2025 2:48 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Jeff Tucker <jct4pac@gmail.com>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: Re: [INTERNET] Area B Site Visit 7/3/25, 11:29 AM State of Utah Mail - RE: [INTERNET] Area B Site Visit https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r1279004493170586671%7Cmsg-f:1828242603356211202…1/5 THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, It looks like next Wednesday (9th) between 11:00 - 2:00 would be our first choice. Tuesday (8th) after 11:00 would be our second choice. Do either of these work for you? Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Mon, Mar 31, 2025 at 5:36 PM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, That’s not a problem. Friday won’t work for us, let’s try for next week. Tuesday or Wednesday would be best for us. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com 7/3/25, 11:29 AM State of Utah Mail - RE: [INTERNET] Area B Site Visit https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r1279004493170586671%7Cmsg-f:1828242603356211202…2/5 www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Monday, March 31, 2025 5:26 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Subject: Re: [INTERNET] Area B Site Visit THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Thanks for getting back to me. Bill has asked to attend the site visit but is not available tomorrow afternoon so I will need to reschedule. Is this Friday an option for you and Jeff or should we look at dates next week? Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 7/3/25, 11:29 AM State of Utah Mail - RE: [INTERNET] Area B Site Visit https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r1279004493170586671%7Cmsg-f:1828242603356211202…3/5 On Mon, Mar 31, 2025 at 10:23 AM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, Tuesday (tomorrow) afternoon works for me and Jeff. What time would you like to meet? Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Sunday, March 30, 2025 10:56 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Subject: [INTERNET] Area B Site Visit THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Just wondering if you have any time over the next week or two to do a site visit to the Area B area. This will facilitate the review of the characterization work plan and the generation of comments, if any. 7/3/25, 11:29 AM State of Utah Mail - RE: [INTERNET] Area B Site Visit https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r1279004493170586671%7Cmsg-f:1828242603356211202…4/5 I am available Tuesday PM and Friday after 11:30 this week. Next week I am pretty open. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 7/3/25, 11:29 AM State of Utah Mail - RE: [INTERNET] Area B Site Visit https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r1279004493170586671%7Cmsg-f:1828242603356211202…5/5 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Re: VCP Area RAP(s) question 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Fri, Apr 4, 2025 at 5:15 PM To: Joseph Katz <jkatz@utah.gov> Cc: "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Sounds great, thanks Joe! Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Friday, April 4, 2025 5:14 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: Re: [INTERNET] Re: VCP Area RAP(s) queson THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, 7/3/25, 11:30 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1828515801724109332…1/5 Sorry for the delay on this. I have not gotten a straight answer, but we are going to discuss this next week and hopefully have an answer at the site visit. A preference to have a single RAP was expressed, but this is not the final decision just so you are aware. Looking forward to the site visit. We will make sure to bring our PPE. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Wed, Apr 2, 2025 at 4:51 PM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, As we’re preparing the application and letter to add the LHM Group to the VCA it would be helpful to know the status of the question below regarding multiple RAPs in the same VCP area (one RAP for Pac/RMP and one for the LHM Group). Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com 7/3/25, 11:30 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1828515801724109332…2/5 RMP Environmental Services | PacifiCorp www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Thursday, February 27, 2025 5:54 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: [INTERNET] Re: VCP Area RAP(s) queson THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Glad to hear things are coming together. I believed we did discuss this somewhat during our meeting a few weeks back. I am assuming the enlargement of Area B is to accommodate utility access that will support development in Area B. Is that correct? A single characterization plan and report for Area B makes a lot of sense to me, so no concerns there. In terms of your questions about two risk assessments and RAPs for the same area, I am not sure we have ever had to address this scenario before under the VCP. While the rationale for doing this is very clear, I can anticipate some objections on our end about the potential for confusion with two RAPs covering the same area, particularly in the public arena during public comment. If the documents are very clear and deliberate about the boundaries they cover, I think we could work through this, but I will bring this up with Bill when he gets back next week to make sure I am not missing anything. I will get back with you after I speak with Bill. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 7/3/25, 11:30 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1828515801724109332…3/5 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Feb 25, 2025 at 11:52 AM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, We’re nearing having the Site Characterization Work Plan finalized with the new legal description of the boundary that we will be investigating. A question has come up that I think we discussed but I wanted to get confirmation from you. Currently in our VCA we have VCP Area A, Area B, Area C, and Area D. We are going to keep the same footprint, but slightly enlarge Area B, which will require us to slightly reduce Area C and Area D. Area B will be the focus of the Site Characterization Work Plan and the next phase of investigation. Area B will include the new RMP headquarters area as well as a development area for LHM. Once the Site Characterization Work Plan is approved we plan to conduct a single investigation (rather than an RMP investigation and a LHM investigation) and develop one (1) Site Characterization Report. Here’s my question: once the Site Characterization Work plan is complete and accepted by DEQ/DERR, RMP will do a risk assessment and develop a RAP for the intended use of the property we will develop (likely commercial due to it being an office building space); and LHM will do a risk assessment and develop a RAP for the intended use of the property they will develop (likely residential). Is it acceptable to have the two different risk assessments/RAPs for the two different areas/land uses within the same VCP Area (B)? Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 7/3/25, 11:30 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1828515801724109332…4/5 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:30 AM State of Utah Mail - RE: [INTERNET] Re: VCP Area RAP(s) question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1825056553634163384%7Cmsg-f:1828515801724109332…5/5 Joseph Katz <jkatz@utah.gov> Fw: [INTERNET] Final Area B Work Plan 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Thu, Apr 10, 2025 at 8:52 PM To: Joseph Katz <jkatz@utah.gov>, Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com> Hi Joe, Here are the changes we made to the work plan after our site walk and discussion yesterday. We can use this for our discussion on Monday. Thanks, Scott 2 attachments Area B Work Plan, revised 04 10 2025.docx 462K f4_PropShallowBorLoc_r11-Paper.pdf 1999K 7/3/25, 11:31 AM State of Utah Mail - Fw: [INTERNET] Final Area B Work Plan https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829073033227051217%7Cmsg-f:1829073033227051217…1/1 Joseph Katz <jkatz@utah.gov> North Temple Redevelopment VCP Area B Work Plan - revised 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Thu, Apr 17, 2025 at 3:53 PM To: Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com> Hi Joe, Here is the updated work plan that includes items discussed last week at the Area B site walk as well as our phone call earlier this week. A redlined version is included as well. FYI, and I believe we discussed this last week at the site walk, we are currently scheduled with a driller to do the investigation the week of May 19-23. Depending on when this plan is approved, we may try to move those dates up a week or two. We’ll keep you posted on that. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 2 attachments 7/3/25, 11:31 AM State of Utah Mail - North Temple Redevelopment VCP Area B Work Plan - revised https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829688360478499182%7Cmsg-f:1829688360478499182…1/2 VCP 119 Area B Work Plan, Final 04 16 2025 - redline.docx 447K VCP 119 Area B Work Plan, Final 04 16 2025_Opt.pdf 7182K 7/3/25, 11:31 AM State of Utah Mail - North Temple Redevelopment VCP Area B Work Plan - revised https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829688360478499182%7Cmsg-f:1829688360478499182…2/2 Joseph Katz <jkatz@utah.gov> Re: PFAS Question 1 message Scott Everett <severett@utah.gov>Fri, Apr 18, 2025 at 1:41 PM To: Joseph Katz <jkatz@utah.gov> Hello Joe, Given that no landfill material has been encountered, it's possible that PFAS chemicals may not be present in the soil. While the screening levels for these chemicals are very low, any findings could be hard to definitively link as the source of PFAS in the groundwater. It would be helpful to know the proposed sampling locations and what will happen to the soil. Will they be sampling in areas slated for excavation, under hardscapes, or in landscaping zones? I'm okay with foregoing soil sampling unless there's reason to believe the soil is the primary source of the groundwater contamination. I'm available to discuss this further at your convenience. Thanks, Scott On Thu, Apr 17, 2025 at 4:09 PM Joseph Katz <jkatz@utah.gov> wrote: Hello Scott, Rocky Mountain Power (RMP) is preparing a SAP to characterize the property for their new headquarters. The property is within the larger South Temple Landfill CERCLIS site although prior investigations have not encountered landfill contents on this specific property. We have previously provided them feedback to sample for PFAS due to the historic landfill and the low-level detections of PFAS in groundwater on the eastern portion of the RMP campus. They have proposed to sample groundwater for PFAS but not soil. Do you recommend sampling soils for PFAS at old landfills or is it preferable to have the groundwater data guide future soil sampling efforts if the groundwater shows a PFAS problem? The entire property has been used as a storage yard during RMP's ownership so there are no specific release points to target with the sampling (e.g. no drains, sumps, processing areas, etc.). Thanks, Joe 7/3/25, 11:32 AM State of Utah Mail - Re: PFAS Question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r6421689426607238325%7Cmsg-f:182977067464814140…1/2 -- Scott Everett Toxicologist | DERR M: (801) 536-4100 P: (385) 391-8149 Please note my new phone number environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 7/3/25, 11:32 AM State of Utah Mail - Re: PFAS Question https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r6421689426607238325%7Cmsg-f:182977067464814140…2/2 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Re: North Temple Redevelopment VCP Area B Work Plan - revised 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Tue, Apr 29, 2025 at 3:51 PM To: Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com> Thank you Joe, We will proceed with plans for the field work. I’ll let you know if there is any change in schedule. Additionally, I should have the request for adding the LHM Group to the VCA as well as the legal description of the VCP Areas ready to send to you tomorrow. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Tuesday, April 29, 2025 1:44 PM 7/3/25, 11:32 AM State of Utah Mail - RE: [INTERNET] Re: North Temple Redevelopment VCP Area B Work Plan - revised https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829688360478499182%7Cmsg-f:1830775386665231648…1/3 To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com>; Jeff Tucker <jct4pac@gmail.com> Subject: [INTERNET] Re: North Temple Redevelopment VCP Area B Work Plan - revised THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, I have reviewed the revised work plan for Area B. Thank you for addressing the comments. I do not have any additional feedback at this time. Closing the door on some of the discussions during the call to discuss this work plan: After reviewing the UST file, I do not believe there is a need to adjust any of the sampling locations proposed near the former UST area. DERR will not be requesting PFAS sampling of soils at this time. DERR would prefer to evaluate the groundwater results to determine if PFAS is a potential concern and where potential source areas are, if any, before determining the need for soil sampling for PFAS. I believe field work was originally slated for the week of May 19. If you would like to move it forward, that would be fine, just let me know the proposed schedule. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Thu, Apr 17, 2025 at 3:53 PM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, 7/3/25, 11:32 AM State of Utah Mail - RE: [INTERNET] Re: North Temple Redevelopment VCP Area B Work Plan - revised https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829688360478499182%7Cmsg-f:1830775386665231648…2/3 Here is the updated work plan that includes items discussed last week at the Area B site walk as well as our phone call earlier this week. A redlined version is included as well. FYI, and I believe we discussed this last week at the site walk, we are currently scheduled with a driller to do the investigation the week of May 19-23. Depending on when this plan is approved, we may try to move those dates up a week or two. We’ll keep you posted on that. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:32 AM State of Utah Mail - RE: [INTERNET] Re: North Temple Redevelopment VCP Area B Work Plan - revised https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1829688360478499182%7Cmsg-f:1830775386665231648…3/3 Joseph Katz <jkatz@utah.gov> Legal descriptions 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Wed, Apr 30, 2025 at 11:29 AM To: "jkatz@utah.gov" <jkatz@utah.gov> Hi Joe, I ended up being out of the office today heading down to St. George to pick up my daughter from school. I told you I'd send some information for the North Temple Redevelopment project, so I'll send the documents individually today and I will combine these (and the co-applicant letter and form) into a single PDF when I'm back in the office and get that over to you. Here are the written legal descriptions. I'll send you the co-applicant letter and form in another email. Thanks, Scott 3 attachments VCP AREA D Legal Description.docx 14K VCP AREA C Legal Description.docx 14K Legal Description for the RMP HQ VCP Area.docx 6750K 7/3/25, 11:33 AM State of Utah Mail - Legal descriptions https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1830849538581850450%7Cmsg-f:1830849538581850450…1/1 Joseph Katz <jkatz@utah.gov> RMP VCP Co-applicant letter 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Wed, Apr 30, 2025 at 11:31 AM To: "jkatz@utah.gov" <jkatz@utah.gov> Hi Joe, Here is the RMP co-applicant letter. I will send the co-applicant form in a separate email. Thanks, Scott VCP co-applicant letter_final 4.29.pdf 115K 7/3/25, 11:34 AM State of Utah Mail - RMP VCP Co-applicant letter https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1830849683616225080%7Cmsg-f:1830849683616225080…1/1 Joseph Katz <jkatz@utah.gov> RMP LHM VCP Co-applicant letter 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Wed, Apr 30, 2025 at 11:36 AM To: "jkatz@utah.gov" <jkatz@utah.gov> Hi Joe, Here is the RMP LHM additional applicant form and a site map (from the Work Plan). Thanks, Scott 2 attachments VCP 119 Areas_2025.pdf 580K RMP HQ VCP coapplicant - signed.pdf 469K 7/3/25, 11:34 AM State of Utah Mail - RMP LHM VCP Co-applicant letter https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1830849978124194190%7Cmsg-f:1830849978124194190…1/1 Joseph Katz <jkatz@utah.gov> Power District VCA - LHM Group Applicant and Area Re-designations 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Fri, May 2, 2025 at 4:23 PM To: Joseph Katz <jkatz@utah.gov> Cc: Bill Rees <brees@utah.gov>, Carl Duke <carl.duke@lhm.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Hi Joe, Attached are the combined files I sent earlier this week that contain the letter and application to add the LHM Group to the Power District Voluntary Cleanup Agreement as well as the revised legal descriptions of the VCP Areas. The current plan is to begin the Area B investigation on May 19th. In preparation for a transmission line project south of South Temple, we will be investigating a few proposed locations for transmission line foundations on the 15th and 16th. There is a chance that the drillers are done early and are available on the 16th to begin the coal ash investigation (road and pipeline bedding material) along South Temple. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:35 AM State of Utah Mail - Power District VCA - LHM Group Applicant and Area Re-designations https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1831049242582101241%7Cmsg-f:1831049242582101241…1/2 Power District VCA - LHM Group Applicant and Area Re-designations.pdf 1177K 7/3/25, 11:35 AM State of Utah Mail - Power District VCA - LHM Group Applicant and Area Re-designations https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1831049242582101241%7Cmsg-f:1831049242582101241…2/2 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Thu, May 29, 2025 at 1:24 PM To: Joseph Katz <jkatz@utah.gov>, "carl.duke@lhm.com" <carl.duke@lhm.com> Cc: Bill Rees <brees@utah.gov>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com>, "Finley, Elizabeth (PacifiCorp)" <Elizabeth.Finley@pacificorp.com> Thanks Joe, We are still reviewing the draft but have a few initial comments/questions, included in the attached Draft. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Friday, May 23, 2025 4:13 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com>; carl.duke@lhm.com Cc: Bill Rees <brees@utah.gov> Subject: [INTERNET] RMP Power District - Dra Voluntary Cleanup Agreement Amendment 7/3/25, 11:35 AM State of Utah Mail - RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r5427101225980510325%7Cmsg-f:1833484051991365116…1/2 THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott and Carl, Please see the attached draft of the First Amendment to the Voluntary Cleanup Agreement for the Rocky Mountain Power - Power District Redevelopment VCP project. This amendment adds LHM as a co-applicant and adjusts the legal descriptions of Areas A - D. Please review and let me know if you have any questions or comments. This will still need to undergo management review here but we want to take into account any feedback you have before proceeding. Thanks and enjoy the Memorial Day weekend, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. PacifiCorp 119 VCA Ammendment_fsw.pdf 1310K 7/3/25, 11:35 AM State of Utah Mail - RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r5427101225980510325%7Cmsg-f:1833484051991365116…2/2 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Mon, Jun 9, 2025 at 3:30 PM To: Joseph Katz <jkatz@utah.gov>, "carl.duke@lhm.com" <carl.duke@lhm.com> Cc: Bill Rees <brees@utah.gov>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com>, "Finley, Elizabeth (PacifiCorp)" <Elizabeth.Finley@pacificorp.com>, "davidwilson.wilson@tetratech.com" <davidwilson.wilson@tetratech.com> Hi Joe, I confirmed the deletion of a sentence in Area D legal description, attached in this draft Amendment version. There is also one additional comment regarding the working relationships covered in Section B.1. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Sent: Thursday, May 29, 2025 1:24 PM To: Joseph Katz <jkatz@utah.gov>; carl.duke@lhm.com Cc: Bill Rees <brees@utah.gov>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com>; Finley, Elizabeth 7/3/25, 11:36 AM State of Utah Mail - RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r5427101225980510325%7Cmsg-f:183448858949994942…1/3 (PacifiCorp) <Elizabeth.Finley@pacificorp.com> Subject: RE: [INTERNET] RMP Power District - Dra Voluntary Cleanup Agreement Amendment Thanks Joe, We are still reviewing the draft but have a few initial comments/questions, included in the attached Draft. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Friday, May 23, 2025 4:13 PM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com>; carl.duke@lhm.com Cc: Bill Rees <brees@utah.gov> Subject: [INTERNET] RMP Power District - Dra Voluntary Cleanup Agreement Amendment THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott and Carl, 7/3/25, 11:36 AM State of Utah Mail - RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r5427101225980510325%7Cmsg-f:183448858949994942…2/3 Please see the attached draft of the First Amendment to the Voluntary Cleanup Agreement for the Rocky Mountain Power - Power District Redevelopment VCP project. This amendment adds LHM as a co-applicant and adjusts the legal descriptions of Areas A - D. Please review and let me know if you have any questions or comments. This will still need to undergo management review here but we want to take into account any feedback you have before proceeding. Thanks and enjoy the Memorial Day weekend, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. PacifiCorp 119 VCA Ammendment_fsw_2.pdf 1317K 7/3/25, 11:36 AM State of Utah Mail - RE: [INTERNET] RMP Power District - Draft Voluntary Cleanup Agreement Amendment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-a:r5427101225980510325%7Cmsg-f:183448858949994942…3/3 Joseph Katz <jkatz@utah.gov> Acceptance Letter - Rocky Mountain Power - Power District Redevelopment 1 message Jennifer Nelson <jennifernelson@utah.gov>Wed, Jun 11, 2025 at 10:51 AM To: claude@hillwestut.com, Ronald Lund <RLund@saltlakecounty.gov>, epeterson@saltlakecounty.gov Cc: Joseph Katz <jkatz@utah.gov> Good morning, Please see the attached letter. Best, Jennifer Jennifer Nelson (she/her) Branch Secretary | Records Officer P: (385) 391-8128 F: (801) 359-8853 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. ERRC-136-25 Letter.pdf 127K 7/3/25, 11:37 AM State of Utah Mail - Acceptance Letter - Rocky Mountain Power - Power District Redevelopment https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1834652232627186565%7Cmsg-f:1834652232627186565…1/1 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe Joseph Katz <jkatz@utah.gov> Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, Power District Redevelopment Project, VCP Area B 1 message Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com>Tue, Jun 24, 2025 at 5:05 PM To: Bill Rees <brees@utah.gov>, Joseph Katz <jkatz@utah.gov> Cc: Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com>, "Wilson, DavidWilson" <davidwilson.wilson@tetratech.com>, Carl Duke <carl.duke@lhm.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Hi Bill and Joe, Thanks again for your expedited and thorough review of the proposed additional sampling locations, groundwater well locations, and next steps. Reponses to your comments are included in red below, and an updated map and table are attached. As mentioned last week, the driller had to move our schedule and the investigation and well installation is currently scheduled for the week of June 30th. Thanks! Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Bill Rees <brees@utah.gov> Sent: Thursday, June 19, 2025 7:58 AM To: Wetzel, Sco (PacifiCorp) <sco.wetzel@pacificorp.com> Cc: Joseph Katz <jkatz@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com>; Jeff Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com> Subject: Re: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B Scott, We have reviewed the email and data tables. Thank you for proposing additional samples to maximize characterization. Our comments follow: 1. The email contains preliminary data tables. We have not received/reviewed the complete lab data packages. If QC or transcription issues are encountered, additional sampling or other adjustments to project work may be necessary. Understood. 2. Please revise the letter workplan to indicate that all future sampling will be conducted in accordance with the SAP/QAPP. Sampling was completed consistent with the SAP/QAPP. Please ensure all detection limits are below screening levels to avoid potential QC Sensitivity issues. The correct analytical method was selected, matrix interference can cause elevated reporting limits, as was observed for several SVOCs. 3. In Table 3, it appears that the RSL screening level is for benzo (e) pyrene, not benzo (a) pyrene. This changes the data review as there are now exceedances of both the residential and commercial RSL. Please revise and propose sampling. An updated Table 3 is attached. Addition of SVOCs to the proposed analyses has been added, as well as two additional borings near AB-43. The following table has been updated to reflect the additional analyses and borings, and the attached figure includes the two additional borings. 7/3/25, 11:38 AM State of Utah Mail - Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, Power District Redevelo… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1835853522979172286…1/3 4. AB-42 - AB-44 contained elevated petroleum compounds, but sampling is only proposed around AB-44. Please provide a rationale for this proposal and indicate why additional samples are not proposed to delineate the elevated concentrations. Two additional borings near B-43 have been added to address benzo(a)pyrene above the Industrial RSL in surface soil and at 4 to 5 feet bgs. AB-42 is in an asphalted area. The reported surface soil contamination and will be removed with the demolition and recycling of the asphalt and is in a commercial land use area. 5. AB-21 - Please note that there is uncertainty under the road east of this location. Samples may not be collected during this phase of investigation due to utilities, but a materials management strategy will be needed as part of the RAP, utility work and redevelopment. A MMP has been developed and approved by DERR for the Power District Development Project as a whole. Area B would fall under that plan. 6. While not expected during this phase, future sampling should consider methane since this site could be part of a former landfill. Soil gas samples will be collected within Area B to assess methane for potential vapor intrusion. Four samples will be collected and are presented on the attached figure. However, it should be noted that historical landfill operations were for construction waste and commercial waste and was unlikely to include methane producing waste. Bill Bill Rees Section Manager VCP/Brownfields Section P: (385) 391-8120 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Jun 17, 2025 at 10:46 AM Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> wrote: Joe and Bill, As discussed on Friday, DERR approval and comment of additional soil characterization and groundwater monitoring well locations is requested. Attached are draft soil analytical summary tables, a draft temporary well analytical summary table, and a figure that indicates the soil assessment borings and the proposed additional soil assessment locations and permanent groundwater monitoring wells for VCP Area B of the Power District Redevelopment Project. The May 2025 soil and groundwater assessment was successful. Providing a great deal of data for completion of site characterization. There are several locations where further delineation is required. The analytical data for the May 2025 assessment identified four locations where additional characterization will be beneficial to completing charaterization and developing a Remedial Action Plan for VCP Area B. Additional soil characterization is required for lead, arsenic, and cadmium in three locations (soil borings AB-21, AB‑26/AB-37, and AB‑32/AB-34). Twelve additional soil borings to the groundwater interface will be advanced near those locations (see Figure) to collect soil samples from surface soil, and 5 feet bgs, and at the soil/groundwater interface (approximately 10 feet bgs). Soil samples collected near soil boring AB-21 will also be analyzed for oil range organics (ORO), and soil borings near soil borings AB-32/AB-34 will also be analyzed for PCBs to provide better delineation of reported Aroclor 1260 contamination. Two surface soil samples will be collected near soil boring AB-35 to better delineate PCBs. Two soil borings will also be located near soil boring AB-44 to better delineate the lead, arsenic, DRO, and ORO reported in that area. The proposed soil boring/sampling locations are presented on the attached figure as red crosses and are summarized in the table below. Prior Assessment Boring ID Number of Borings Boring Depth (feet)Sample Depths (feet)COCs Analyses AB-21 3 10 0.167, 5, 10 (interface)Lead, Cadmium & Arsenic, ORO USEPA 6010 & 7471, ORO 7/3/25, 11:38 AM State of Utah Mail - Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, Power District Redevelo… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1835853522979172286…2/3 AB-26 & AB-37 5 10 0.167, 5, 10 (interface)Lead, Cadmium & Arsenic USEPA 6010 & 7471 AB-32 & AB-34 4 10 0.167, 5, 10 (interface)Lead, Cadmium, Arsenic, PCBs USEPA 6010 & 7471, 8082 AB-35 (2) grab samples Surface 0.167 PCBs USEPA 8082 AB-44 2 10 0.167, 5, 10 (interface)Lead, Arsenic, DRO, ORO USEPA 6010 & 7471, DRO, ORO As proposed in the Site Characterization Work Plan (SCWP), ten groundwater monitoring wells will be constructed to collect groundwater samples and a soil sample from the soil/groundwater interface at each location. The well locations are generally consistent with the anticipated locations presented in the SWCP and will provide water quality data from throughout VCP Area B and at the boundaries of the Area. Consistent with the SCWP, existing groundwater monitoring wells TT-1-2 and TT-2-1 will be monitored to provide water quality data southeast and east (anticipated upgradient direction) of VCP Area B. The proposed groundwater monitoring well locations are presented as a magenta target circle on the attached figure. Hill West has scheduled a drilling contractor to complete the additional assessment and well installation beginning on June 25, 2025. DERR assistance in meeting this start date is greatly appreciated. Don’t hesitate to reach out with any questions or concerns on this proposed work. And thank you both for all of your assistance on this project! Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 2 attachments fx_PropGWMonWell&BoringLoc6-Paper.pdf 2255K Soil Analytical Summary Table - SVOCs, rev2.pdf 302K 7/3/25, 11:38 AM State of Utah Mail - Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, Power District Redevelo… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1835853522979172286…3/3 Joseph Katz <jkatz@utah.gov> RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, Power District Redevelopment Project, VCP Area B 1 message Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com>Wed, Jul 2, 2025 at 1 To: Joseph Katz <jkatz@utah.gov> Cc: Bill Rees <brees@utah.gov>, Daniel Landry <dlandry@aandmengineering.com>, "Claude Dahlk - Hill West Environmental (claude@hillwestut.com)" <claude@hillwestut.com>, Jeff Tucker <jct4pac@gmail.com>, "Wilson, DavidWilson" <davidwilson.wilson@tetratech.com>, Carl Duke <carl.duke@lhm.com>, "Jenson, Mike (PacifiCorp)" <Mike.Jenson@pacificorp.com> Thanks Joe, You’re definitely welcome to come over today. At this point all of the drilling and soil sampling has been completed. The GW wells are being conditioned and the monume are being built for the GW wells. The plan is to have the wells conditioned and ready for sampling on Monday July 7th. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Wednesday, July 2, 2025 10:14 AM To: Wetzel, Sco (PacifiCorp) <Scott.Wetzel@pacificorp.com> Cc: Bill Rees <brees@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com>; Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com>; Carl Duke <carl.duke@lhm.com>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: [INTERNET] Re: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Thanks for letting me know about the soil samples. I will plan on heading out to the site at 11:00 today to see how things are going. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…1/7 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Jul 1, 2025 at 4:33 PM Wetzel, Scott (PacifiCorp) <Scott.Wetzel@pacificorp.com> wrote: Hi Joe, Just an update on the discussion below. We’ve decided not to collect the soil samples. We don’t expect to encounter PFAS and the added cost is not warranted with an outside lab, as ChemTech-Ford does not analyze soil for PFAS. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Wetzel, Sco (PacifiCorp) <scott.wetzel@pacificorp.com> Sent: Tuesday, July 1, 2025 10:29 AM To: Joseph Katz <jkatz@utah.gov> Cc: Bill Rees <brees@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com Jeff Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com>; Carl Duke <carl.duke@lhm.com>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B Hi Joe, Thanks for the feedback. Attached is the addendum we will be following for additional soil characterization, final proposed groundwater monitoring well locations, and the proposed methan gas assessment locations and method. Hill West has been collecting and is holding samples from the soil/groundwater interface in the groundwater monitoring well installations. We will discuss and decide on the analysis of those samples. Thanks, Scott Scott Wetzel 801.220.2427 | 801.631.4572 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…2/7 Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Joseph Katz <jkatz@utah.gov> Sent: Tuesday, July 1, 2025 9:41 AM To: Wetzel, Sco (PacifiCorp) <scott.wetzel@pacificorp.com> Cc: Bill Rees <brees@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com Jeff Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com> Subject: Re: [INTERNET] Re: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hello Scott, Thanks for the update on the status of the work plan and sampling this week. Regarding PFAS sampling of soils, Scott and I did discuss that. Based on the overall lack of clear source areas, wide-spread contamination, landfill debris, etc. we do not feel that default s PFAS sampling at each well location is necessary. We think it is most effective overall to evaluate the groundwater data and let that guide any further sampling for PFAS (including soils) if necessary. The drawback to this approach though is time since it requires evaluation of the data and an additional sampling event if the data warrants it. However, there is no guarantee th additional sampling would not be needed even if PFAS soil samples are collected during this event anyway. This is a business decision for PacifiCorp and LHM to consider, but the DERR is not requesting soil sampling for PFAS during this well installation sampling event. However, we do feel it is important to retain the option to collect opportunity soil samples in the event that obvious field indications of potential source areas/impacts (significant or suspicious landfill contents, staine soils, etc.) are encountered during sampling. Since schedule is a concern on this project, opportunity samples, if needed, could expedite the characterization of Area B by collecting relevan data for evaluation now rather than in a future event. I hope this helps. Please let me know if you have any questions. Thanks, Joe My phone number has changed! 385-391-8121 Joseph Katz | Environmental Scientist | Project Manager 385.391.8121 (mobile) | 801.359.8853 (fax) 195 North 1950 West, Salt Lake City, UT 84116 Website | Blog | Twitter | Facebook | LinkedIn Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Jul 1, 2025 at 8:45 AM Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> wrote: Hi Joe, 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…3/7 We are finalizing the workplan based on the feedback last week. One final question, in our notes we show that you were going to talk to Scott Everett about whether we need to run the soil/groundwater interface sample for the well installation borings for PFAS. Do you have direction from Scott on that for us to include? The water in the wells will be sampled for PFAS. Thanks, Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Bill Rees <brees@utah.gov> Sent: Thursday, June 26, 2025 8:34 AM To: Wetzel, Sco (PacifiCorp) <scott.wetzel@pacificorp.com> Cc: Joseph Katz <jkatz@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com>; Jeff Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com>; Carl Duke <carl.duke@lhm.com>; Jenson, Mike (PacifiCorp) <Mike.Jenson@pacificorp.com> Subject: [INTERNET] Re: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B THIS MESSAGE IS FROM AN EXTERNAL SENDER. Look closely at the SENDER address. Do not open ATTACHMENTS unless expected. Check for INDICATORS of phishing. Hover over LINKS before clicking. Learn to spot a phishing message Hi Scott, Thank you for the email and responses to comments. We accept the proposal. Please send a short letter workplan with the updated tables, and figure indicating the letter workplan is a amendment to the SCWP, with the objective to define the extent of impacts. Please be clear that the groundwater wells, installation, sampling procedures, etc. will be consistent with th SCWP and corresponding QAPP. Please outline the soil gas sampling procedures. We look forward to field work next week. Please keep us in the loop regarding the schedule. Bill Bill Rees Section Manager VCP/Brownfields Section P: (385) 391-8120 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…4/7 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe On Tue, Jun 24, 2025 at 5:05 PM Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> wrote: Hi Bill and Joe, Thanks again for your expedited and thorough review of the proposed additional sampling locations, groundwater well locations, and next steps. Reponses to you comments are included in red below, and an updated map and table are attached. As mentioned last week, the driller had to move our schedule and the investiga and well installation is currently scheduled for the week of June 30th. Thanks! Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 From: Bill Rees <brees@utah.gov> Sent: Thursday, June 19, 2025 7:58 AM To: Wetzel, Sco (PacifiCorp) <sco.wetzel@pacificorp.com> Cc: Joseph Katz <jkatz@utah.gov>; Daniel Landry <dlandry@aandmengineering.com>; Claude Dahlk - Hill West Environmental (claude@hillwestut.com) <claude@hillwestut.com Jeff Tucker <jct4pac@gmail.com>; Wilson, DavidWilson <davidwilson.wilson@tetratech.com> Subject: Re: Proposed Groundwater Monitoring Well and Addional Soil Characterizaon Locaons, Power District Redevelopment Project, VCP Area B Scott, We have reviewed the email and data tables. Thank you for proposing additional samples to maximize characterization. Our comments follow: 1. The email contains preliminary data tables. We have not received/reviewed the complete lab data packages. If QC or transcription issues are encountered, additional sampling or o adjustments to project work may be necessary. Understood. 2. Please revise the letter workplan to indicate that all future sampling will be conducted in accordance with the SAP/QAPP. Sampling was completed consistent with the SAP/QAPP. P ensure all detection limits are below screening levels to avoid potential QC Sensitivity issues. The correct analytical method was selected, matrix interference can cause elevated repo limits, as was observed for several SVOCs. 3. In Table 3, it appears that the RSL screening level is for benzo (e) pyrene, not benzo (a) pyrene. This changes the data review as there are now exceedances of both the residentia commercial RSL. Please revise and propose sampling. An updated Table 3 is attached. Addition of SVOCs to the proposed analyses has been added, as well as two additional boring AB-43. The following table has been updated to reflect the additional analyses and borings, and the attached figure includes the two additional borings. 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…5/7 4. AB-42 - AB-44 contained elevated petroleum compounds, but sampling is only proposed around AB-44. Please provide a rationale for this proposal and indicate why additional sam are not proposed to delineate the elevated concentrations. Two additional borings near B-43 have been added to address benzo(a)pyrene above the Industrial RSL in surface soil and to 5 feet bgs. AB-42 is in an asphalted area. The reported surface soil contamination and will be removed with the demolition and recycling of the asphalt and is in a commercial land area. 5. AB-21 - Please note that there is uncertainty under the road east of this location. Samples may not be collected during this phase of investigation due to utilities, but a materials management strategy will be needed as part of the RAP, utility work and redevelopment. A MMP has been developed and approved by DERR for the Power District Development Proje a whole. Area B would fall under that plan. 6. While not expected during this phase, future sampling should consider methane since this site could be part of a former landfill. Soil gas samples will be collected within Area B to assess methane for potential vapor intrusion. Four samples will be collected and are presented on the attached figure. However, it should be noted that historical landfill operations w for construction waste and commercial waste and was unlikely to include methane producing waste. Bill Bill Rees Section Manager VCP/Brownfields Section P: (385) 391-8120 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Jun 17, 2025 at 10:46 AM Wetzel, Scott (PacifiCorp) <scott.wetzel@pacificorp.com> wrote: Joe and Bill, As discussed on Friday, DERR approval and comment of additional soil characterization and groundwater monitoring well locations is requested. Attached are soil analytical summary tables, a draft temporary well analytical summary table, and a figure that indicates the soil assessment borings and the proposed additio soil assessment locations and permanent groundwater monitoring wells for VCP Area B of the Power District Redevelopment Project. The May 2025 soil and groundwater assessment was successful. Providing a great deal of data for completion of site characterization. There are several locations where further delineation is required. The analytical data for the May 2025 assessment identified four locations where additional characterization will be beneficial to completing charaterization and developing a Remedial Action Plan for VCP Area B. Additional soil characterization is required for lead, arsenic, and cadmium in three locations (soil borings AB AB‑26/AB-37, and AB‑32/AB-34). Twelve additional soil borings to the groundwater interface will be advanced near those locations (see Figure) to collect soil samples from surface soil, and 5 feet bgs, and at the soil/groundwater interface (approximately 10 feet bgs). Soil samples collected near soil boring AB-21 will a be analyzed for oil range organics (ORO), and soil borings near soil borings AB-32/AB-34 will also be analyzed for PCBs to provide better delineation of reporte Aroclor 1260 contamination. Two surface soil samples will be collected near soil boring AB-35 to better delineate PCBs. Two soil borings will also be located n soil boring AB-44 to better delineate the lead, arsenic, DRO, and ORO reported in that area. The proposed soil boring/sampling locations are presented on the attached figure as red crosses and are summarized in the table below. Prior Assessment Boring ID Number of Borings Boring Depth (feet)Sample Depths (feet)COCs Analyses AB-21 3 10 0.167, 5, 10 (interface)Lead, Cadmium & Arsenic, ORO USEPA 6010 & 7471, ORO 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…6/7 AB-26 & AB-37 5 10 0.167, 5, 10 (interface)Lead, Cadmium & Arsenic USEPA 6010 & 7471 AB-32 & AB-34 4 10 0.167, 5, 10 (interface)Lead, Cadmium, Arsenic, PCBs USEPA 6010 & 7471, 8082 AB-35 (2) grab samples Surface 0.167 PCBs USEPA 8082 AB-44 2 10 0.167, 5, 10 (interface)Lead, Arsenic, DRO, ORO USEPA 6010 & 7471, DRO, ORO As proposed in the Site Characterization Work Plan (SCWP), ten groundwater monitoring wells will be constructed to collect groundwater samples and a soil sa from the soil/groundwater interface at each location. The well locations are generally consistent with the anticipated locations presented in the SWCP and will provide water quality data from throughout VCP Area B and at the boundaries of the Area. Consistent with the SCWP, existing groundwater monitoring wells TT and TT-2-1 will be monitored to provide water quality data southeast and east (anticipated upgradient direction) of VCP Area B. The proposed groundwater monitoring well locations are presented as a magenta target circle on the attached figure. Hill West has scheduled a drilling contractor to complete the additional assessment and well installation beginning on June 25, 2025. DERR assistance in mee this start date is greatly appreciated. Don’t hesitate to reach out with any questions or concerns on this proposed work. And thank you both for all of your assistance on this project! Scott Scott Wetzel Env Remediation & Reclamation Mgr RMP Environmental Services | PacifiCorp 801.220.2427 | 801.631.4572 scott.wetzel@pacificorp.com www.pacificorp.com 1407 W North Temple, Salt Lake City, UT 84116 7/3/25, 11:40 AM State of Utah Mail - RE: [INTERNET] Re: Proposed Groundwater Monitoring Well and Additional Soil Characterization Locations, P… https://mail.google.com/mail/u/0/?ik=3a2596ed70&view=pt&search=all&permthid=thread-f:1835195501445156333%7Cmsg-f:1836553094850649741…7/7