HomeMy WebLinkAboutDERR-2025-004862
Weekly Construction Status Report
Report #:
06
Ninigret/UIPA
North Temple Remediation
I-80 and 7200 West
Salt LakeCity, Utah
Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25
ET Project No. 02-ET1833 Page | 1
KEY PROJECT STATS:
SCHEDULE:
Commencement of Work 5/19/25
Anticipated Job Completion 11/30/26
Workdays into Job 25
Workdays Lost 0
Reason for Lost Days
Action Taken to Make-Up Lost Days
Construction Waste Removal/Repository Placement/Mobilization
Overall Project % Complete 0%
Delays None
DISTRIBUTION:
ET Staff:
Principal Consultant Bill Higginbotham Project Manager Sam Bernard
Project Executive Mark Ballew Project Superintendent Bill Callaway
Operation Manager Todd Hochstein
Ninigret Management
Principal Gary McEntee
Reynolds Staff:
Project Manager/Estimator Kelly Morgan Estimator P.M Sherry McMillan
Project Superintendent Jim Ingram
LF Staff:
Project Manager Eric Rice Superintendent Marty Porter
Consultants
Wasatch Audra Heinzel
Stantec
Stantec David Cline
ACTION ITEMS:
▪ None Pending
RFI Status to Date: Main Topics of Outstanding RFIs
Open: 00
Closed: 00
Total: 00
▪ NA
Submittal Status to Date: Main Topics of Outstanding Submittals
Open: 00
Closed: 00
Total: 00
▪ NA.
Weekly Construction Status Report
Report #:
06
Ninigret/UIPA
North Temple Remediation
I-80 and 7200 West
Salt LakeCity, Utah
Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25
ET Project No. 02-ET1833 Page | 2
PROGRESS REPORT THIS PERIOD
Week in Review
• 29,550 CY of material was excavated from the Waste Cells and placed at the repository.
• This past week was the first full production week with Reynolds Excavation having 2 full crews onsite.
• Met with Reynolds Construction onsite on Wednesday the 25th for weekly meeting.
• Excavation took place in cells 200, 207 and in the Buffer zone.
• Leachate is being pumped from the Buffer Zone and Cell 200 to the Evaporator.
• Met with DEQ on Thursday the 26th (ET, Ninigret, and DEQ).
• Clean-cover material from the lead pile is being placed on the repository.
ET Environmental
• Met with Utah DEQ (David Bird) for weekly site visits.
o Gave project update and drove the project site with Ninigret and ET Environmental
o David Bird visited the site on Friday June 26th, 2025
• Soil Samples results for cell 236 were received from Chemtech Ford. The samples were below Action
Levels as found in the RAP.
• Weekly project meeting with DEQ, Reynolds, Ninigret and Wasatch Environmental took place on
Monday the 23rd at 2pm.
• Bill Higginbotham was onsite this week from Atlanta.
LF Construction
• Leachate plant is operational
• Road maintenance and watering of roads
• Dust control
• Dewatering of trench 200 continued and the buffer zone
• Placement of material in repository
• Load and haul of clean fill for excavation area
• Continued to Excavate the Buffer Trench. Along the buffer zone area LF has gotten into dryer material
and is no longer needing to pump water at this time.
• The truck wash is now operational at the entrance of the project
• The deep water well is now operational
• The Wheeler water tank is now operational and elevated
• The perimeter gates are installed at the LTP
• 4” Diesel pumps operational
• Placement of 20K gallon water bladders on the top of the repository
Weekly Construction Status Report
Report #:
06
Ninigret/UIPA
North Temple Remediation
I-80 and 7200 West
Salt LakeCity, Utah
Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25
ET Project No. 02-ET1833 Page | 3
Reynolds
• Mobilization of equipment and filed trailer.
• There are now 7 haul trucks onsite from Reynolds.
• The second crew is now onsite.
• The new JD 670 is here onsite.
• Haul road improvements.
• Excavation of Cell #200 and 207 is taking place.
REYNOLDS WEEKLY PRODUCTION REPORT
ANTICIPATED PROGRESS NEXT REPORT PERIOD
ET DESIGN-BUILD
• SAP will be sent to the DEQ for review and approval
• Soil Testing at cells 200 and 207
• Monthly Billing
• Lechate sampling from LTP
LF Construction
• Office complex gates to be installed
• Buffer Zone Excavation and Backfilling
• 4” Diesel Pump
Reynolds Construction
• Equipment Mobilization
• Excavation of cell 200
• Start in cell 206
• Placement and compaction of material at the repository
Unclassified
Description
Tarps on working face of
the repository. Looking to
the south
Taken Date
06/27/2025 at 02:36 pm
Upload Date
06/28/2025 at 08:45 pm
Uploaded By
Bill Callaway
File Name
IMG_2229.JPG
Unclassified
Description
Tarps on working face of
Repository. Looking to the
Northwest
Taken Date
06/27/2025 at 12:16 pm
Upload Date
06/28/2025 at 07:07 pm
Uploaded By
Bill Callaway
File Name
IMG_0162.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 1 of 19
Unclassified
Description
JD 950 dozer advancing
the tipping face of the
repository. Looking to the
East
Taken Date
06/27/2025 at 12:03 pm
Upload Date
06/28/2025 at 07:07 pm
Uploaded By
Bill Callaway
File Name
IMG_0161.JPG
Unclassified
Description
The 20,000 gallon water
bladder installed on the
top of the Bonneville Pile.
The 30 ft. of head created
by the elevation of the Pile
will be used to gravity
feed the water trucks.
Taken Date
06/27/2025 at 11:47 am
Upload Date
06/28/2025 at 07:07 pm
Uploaded By
Bill Callaway
File Name
IMG_0160.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 2 of 19
Unclassified
Description
Tarps being deployed at
the repository.
Taken Date
06/26/2025 at 05:03 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0159.JPG
Unclassified
Description
Reynolds crew placing
tarps on working face of
repository.
Taken Date
06/26/2025 at 04:49 pm
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
90F6F55B-8440-45BE-A…
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 3 of 19
Unclassified
Description
Working face tarps being
placed.
Taken Date
06/26/2025 at 04:47 pm
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
47A010D6-F7EE-4C97-8…
Unclassified
Description
Looking north over the
field of newly installed
clean cover , at piles of
waste debris ready to be
pushed over the tipping
edge.
Taken Date
06/26/2025 at 04:44 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0158.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 4 of 19
Unclassified
Description
Entrance of the new haul
road to the top of the
repository.
Taken Date
06/26/2025 at 04:43 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0157.JPG
Unclassified
Description
Clean cover at the top of
the repository, with tarp
installation at the end of
the day.
Taken Date
06/26/2025 at 04:43 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0156.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 5 of 19
Unclassified
Description
The cream colored plume
in the reservoir of the LTP
is from the leachate being
pumped from the holding
cell into the LTP reservoir.
The reservoir liquid is the
pumped up into the sails
for evaporation.
Taken Date
06/26/2025 at 04:01 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0155.JPG
Unclassified
Description
Well point in Trench 199.
The discharge line is
plumbed into line from
Trench 200 and continues
all the way to the LTP.
Taken Date
06/26/2025 at 03:55 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0154.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 6 of 19
Unclassified
Description
The 3rd excavator is a
massive JD 670. Waiting
for the bucket to arrive.
Taken Date
06/26/2025 at 03:49 pm
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0153.JPG
Unclassified
Description
Smoothing the surface of
the repository in
preparation to install clean
cover over the finished
portion of the repository.
Taken Date
06/26/2025 at 11:49 am
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0152.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 7 of 19
Unclassified
Description
Wasatch Environmental
and DEQ. North buffer
zone of repository. DEQ
facility visit.
Taken Date
06/26/2025 at 11:46 am
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
1E6BD87C-2AE0-44BF-8…
Unclassified
Description
A view along the tipping
edge of the repository
looking east.
Taken Date
06/26/2025 at 11:43 am
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0151.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 8 of 19
Unclassified
Description
Dumping waste at the
tipping edge of the
repository.
Taken Date
06/26/2025 at 11:41 am
Upload Date
06/27/2025 at 06:57 am
Uploaded By
Bill Callaway
File Name
IMG_0150.JPG
Unclassified
Description
Cell 207. Cleaning the
edge of the berm.
Taken Date
06/25/2025 at 04:29 pm
Upload Date
06/26/2025 at 06:40 am
Uploaded By
Bill Callaway
File Name
IMG_0149.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 9 of 19
Unclassified
Description
The second pass in Trench
200, going north to south.
The Trench bottom
continues to slowly leak
water, the color indicates
that it is not leachate. It is
being pumped and
transported to the LTP.
Taken Date
06/25/2025 at 04:04 pm
Upload Date
06/26/2025 at 06:40 am
Uploaded By
Bill Callaway
File Name
IMG_0148.JPG
Unclassified
Description
Have not seen the clay
bottom in the Buffer Zone
excavation for 10 days
due to all of the water/
leachate.
Taken Date
06/25/2025 at 03:11 pm
Upload Date
06/26/2025 at 06:40 am
Uploaded By
Bill Callaway
File Name
IMG_0147.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 10 of 19
Unclassified
Description
East facing edge of the
repository. The repository
has been filled to the
height of the Bonneville
Pile, and the east slope
has been clean covered.
Taken Date
06/25/2025 at 02:33 pm
Upload Date
06/26/2025 at 06:40 am
Uploaded By
Bill Callaway
File Name
IMG_0146.JPG
Unclassified
Description
Tipping edge at the
repository, looking to the
NE.
Taken Date
06/25/2025 at 02:30 pm
Upload Date
06/26/2025 at 06:40 am
Uploaded By
Bill Callaway
File Name
IMG_0145.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 11 of 19
Unclassified
Description
Evaporator control room.
Taken Date
06/24/2025 at 04:46 pm
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
5638D368-8D6A-495D-8…
Unclassified
Description
Evaporator control room.
Taken Date
06/24/2025 at 04:46 pm
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
B7728860-C5E7-4C79-B…
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 12 of 19
Unclassified
Description
Excavation of Cell 207.
Taken Date
06/24/2025 at 11:58 am
Upload Date
06/25/2025 at 06:29 am
Uploaded By
Bill Callaway
File Name
IMG_0144.JPG
Unclassified
Description
Trench 207 trench bottom
has been smoothed with
the dozer to prepare it for
backfilling operation. The
last pass of waste removal
can be seen in the upper
right hand corner of the
photo.
Taken Date
06/24/2025 at 11:47 am
Upload Date
06/25/2025 at 06:29 am
Uploaded By
Bill Callaway
File Name
IMG_0143.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 13 of 19
Unclassified
Description
Leachate being removed
from cell 200 with 4”
pumps.
Taken Date
06/24/2025 at 11:32 am
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
DA51C88A-0716-4281-9…
Unclassified
Description
Cell 200 looking north.
Leachate being pumped
and sent to evaporator via
4 inch.
Taken Date
06/24/2025 at 11:32 am
Upload Date
06/27/2025 at 01:23 pm
Uploaded By
Sam Bernard
File Name
DC0E4995-B5E2-494E-A…
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 14 of 19
Unclassified
Description
Dust control measures in
Trench 200 during waste
excavation.
Taken Date
06/24/2025 at 10:06 am
Upload Date
06/25/2025 at 06:29 am
Uploaded By
Bill Callaway
File Name
IMG_0142.JPG
Unclassified
Description
Trench 200 waste
excavation.
Taken Date
06/24/2025 at 10:02 am
Upload Date
06/25/2025 at 06:29 am
Uploaded By
Bill Callaway
File Name
IMG_0141.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 15 of 19
Unclassified
Description
Clean cover installed on
the east facing side of the
waste repository.
Taken Date
06/23/2025 at 05:51 pm
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0140.JPG
Unclassified
Description
Water seeping into the
bottom of WP #3.
Taken Date
06/23/2025 at 10:36 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0139.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 16 of 19
Unclassified
Description
Trash left behind in Trench
207.
Taken Date
06/23/2025 at 10:15 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0138.JPG
Unclassified
Description
Trash left behind in trench
207.
Taken Date
06/23/2025 at 10:15 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0137.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 17 of 19
Unclassified
Description
Trash being left behind in
Trench 207
Taken Date
06/23/2025 at 10:15 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0136.JPG
Unclassified
Description
Waste excavation in
Trench 207. The
topography of the trench
has changed causing
some debris to be left
behind, which will have to
be cleaned up later when
the trench bottom is
smoothed prior to
backfilling.
Taken Date
06/23/2025 at 10:11 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0135.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 18 of 19
Unclassified
Description
Installing traps over waste
debris excavated as part
of the Buffer Zone
excavation. Because the
tarps are weighted to
prevent being displaced
by the wind, heavy
equipment is required to
move them.
Taken Date
06/23/2025 at 08:18 am
Upload Date
06/24/2025 at 06:32 am
Uploaded By
Bill Callaway
File Name
IMG_0134.JPG
ET Design-Build | ET Environmental
Printed on Mon Jun 30, 2025 at 10:54 am PDT
Job #: 02-00ET1833 North Temple Landfill Remediation
1700 S. 4650 West
Salt Lake City , Utah 84104
8017260707
Page 19 of 19