HomeMy WebLinkAboutDERR-2025-004862 Weekly Construction Status Report Report #: 06 Ninigret/UIPA North Temple Remediation I-80 and 7200 West Salt LakeCity, Utah Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25 ET Project No. 02-ET1833 Page | 1 KEY PROJECT STATS: SCHEDULE: Commencement of Work 5/19/25 Anticipated Job Completion 11/30/26 Workdays into Job 25 Workdays Lost 0 Reason for Lost Days Action Taken to Make-Up Lost Days Construction Waste Removal/Repository Placement/Mobilization Overall Project % Complete 0% Delays None DISTRIBUTION: ET Staff: Principal Consultant Bill Higginbotham Project Manager Sam Bernard Project Executive Mark Ballew Project Superintendent Bill Callaway Operation Manager Todd Hochstein Ninigret Management Principal Gary McEntee Reynolds Staff: Project Manager/Estimator Kelly Morgan Estimator P.M Sherry McMillan Project Superintendent Jim Ingram LF Staff: Project Manager Eric Rice Superintendent Marty Porter Consultants Wasatch Audra Heinzel Stantec Stantec David Cline ACTION ITEMS: ▪ None Pending RFI Status to Date: Main Topics of Outstanding RFIs Open: 00 Closed: 00 Total: 00 ▪ NA Submittal Status to Date: Main Topics of Outstanding Submittals Open: 00 Closed: 00 Total: 00 ▪ NA. Weekly Construction Status Report Report #: 06 Ninigret/UIPA North Temple Remediation I-80 and 7200 West Salt LakeCity, Utah Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25 ET Project No. 02-ET1833 Page | 2 PROGRESS REPORT THIS PERIOD Week in Review • 29,550 CY of material was excavated from the Waste Cells and placed at the repository. • This past week was the first full production week with Reynolds Excavation having 2 full crews onsite. • Met with Reynolds Construction onsite on Wednesday the 25th for weekly meeting. • Excavation took place in cells 200, 207 and in the Buffer zone. • Leachate is being pumped from the Buffer Zone and Cell 200 to the Evaporator. • Met with DEQ on Thursday the 26th (ET, Ninigret, and DEQ). • Clean-cover material from the lead pile is being placed on the repository. ET Environmental • Met with Utah DEQ (David Bird) for weekly site visits. o Gave project update and drove the project site with Ninigret and ET Environmental o David Bird visited the site on Friday June 26th, 2025 • Soil Samples results for cell 236 were received from Chemtech Ford. The samples were below Action Levels as found in the RAP. • Weekly project meeting with DEQ, Reynolds, Ninigret and Wasatch Environmental took place on Monday the 23rd at 2pm. • Bill Higginbotham was onsite this week from Atlanta. LF Construction • Leachate plant is operational • Road maintenance and watering of roads • Dust control • Dewatering of trench 200 continued and the buffer zone • Placement of material in repository • Load and haul of clean fill for excavation area • Continued to Excavate the Buffer Trench. Along the buffer zone area LF has gotten into dryer material and is no longer needing to pump water at this time. • The truck wash is now operational at the entrance of the project • The deep water well is now operational • The Wheeler water tank is now operational and elevated • The perimeter gates are installed at the LTP • 4” Diesel pumps operational • Placement of 20K gallon water bladders on the top of the repository Weekly Construction Status Report Report #: 06 Ninigret/UIPA North Temple Remediation I-80 and 7200 West Salt LakeCity, Utah Report Date: 06/30/25 Report Period: 06/23/25 to 06/27/25 Next Report: 07/07/25 ET Project No. 02-ET1833 Page | 3 Reynolds • Mobilization of equipment and filed trailer. • There are now 7 haul trucks onsite from Reynolds. • The second crew is now onsite. • The new JD 670 is here onsite. • Haul road improvements. • Excavation of Cell #200 and 207 is taking place. REYNOLDS WEEKLY PRODUCTION REPORT ANTICIPATED PROGRESS NEXT REPORT PERIOD ET DESIGN-BUILD • SAP will be sent to the DEQ for review and approval • Soil Testing at cells 200 and 207 • Monthly Billing • Lechate sampling from LTP LF Construction • Office complex gates to be installed • Buffer Zone Excavation and Backfilling • 4” Diesel Pump Reynolds Construction • Equipment Mobilization • Excavation of cell 200 • Start in cell 206 • Placement and compaction of material at the repository Unclassified Description Tarps on working face of the repository. Looking to the south Taken Date 06/27/2025 at 02:36 pm Upload Date 06/28/2025 at 08:45 pm Uploaded By Bill Callaway File Name IMG_2229.JPG Unclassified Description Tarps on working face of Repository. Looking to the Northwest Taken Date 06/27/2025 at 12:16 pm Upload Date 06/28/2025 at 07:07 pm Uploaded By Bill Callaway File Name IMG_0162.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 1 of 19 Unclassified Description JD 950 dozer advancing the tipping face of the repository. Looking to the East Taken Date 06/27/2025 at 12:03 pm Upload Date 06/28/2025 at 07:07 pm Uploaded By Bill Callaway File Name IMG_0161.JPG Unclassified Description The 20,000 gallon water bladder installed on the top of the Bonneville Pile. The 30 ft. of head created by the elevation of the Pile will be used to gravity feed the water trucks. Taken Date 06/27/2025 at 11:47 am Upload Date 06/28/2025 at 07:07 pm Uploaded By Bill Callaway File Name IMG_0160.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 2 of 19 Unclassified Description Tarps being deployed at the repository. Taken Date 06/26/2025 at 05:03 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0159.JPG Unclassified Description Reynolds crew placing tarps on working face of repository. Taken Date 06/26/2025 at 04:49 pm Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name 90F6F55B-8440-45BE-A… ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 3 of 19 Unclassified Description Working face tarps being placed. Taken Date 06/26/2025 at 04:47 pm Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name 47A010D6-F7EE-4C97-8… Unclassified Description Looking north over the field of newly installed clean cover , at piles of waste debris ready to be pushed over the tipping edge. Taken Date 06/26/2025 at 04:44 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0158.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 4 of 19 Unclassified Description Entrance of the new haul road to the top of the repository. Taken Date 06/26/2025 at 04:43 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0157.JPG Unclassified Description Clean cover at the top of the repository, with tarp installation at the end of the day. Taken Date 06/26/2025 at 04:43 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0156.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 5 of 19 Unclassified Description The cream colored plume in the reservoir of the LTP is from the leachate being pumped from the holding cell into the LTP reservoir. The reservoir liquid is the pumped up into the sails for evaporation. Taken Date 06/26/2025 at 04:01 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0155.JPG Unclassified Description Well point in Trench 199. The discharge line is plumbed into line from Trench 200 and continues all the way to the LTP. Taken Date 06/26/2025 at 03:55 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0154.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 6 of 19 Unclassified Description The 3rd excavator is a massive JD 670. Waiting for the bucket to arrive. Taken Date 06/26/2025 at 03:49 pm Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0153.JPG Unclassified Description Smoothing the surface of the repository in preparation to install clean cover over the finished portion of the repository. Taken Date 06/26/2025 at 11:49 am Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0152.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 7 of 19 Unclassified Description Wasatch Environmental and DEQ. North buffer zone of repository. DEQ facility visit. Taken Date 06/26/2025 at 11:46 am Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name 1E6BD87C-2AE0-44BF-8… Unclassified Description A view along the tipping edge of the repository looking east. Taken Date 06/26/2025 at 11:43 am Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0151.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 8 of 19 Unclassified Description Dumping waste at the tipping edge of the repository. Taken Date 06/26/2025 at 11:41 am Upload Date 06/27/2025 at 06:57 am Uploaded By Bill Callaway File Name IMG_0150.JPG Unclassified Description Cell 207. Cleaning the edge of the berm. Taken Date 06/25/2025 at 04:29 pm Upload Date 06/26/2025 at 06:40 am Uploaded By Bill Callaway File Name IMG_0149.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 9 of 19 Unclassified Description The second pass in Trench 200, going north to south. The Trench bottom continues to slowly leak water, the color indicates that it is not leachate. It is being pumped and transported to the LTP. Taken Date 06/25/2025 at 04:04 pm Upload Date 06/26/2025 at 06:40 am Uploaded By Bill Callaway File Name IMG_0148.JPG Unclassified Description Have not seen the clay bottom in the Buffer Zone excavation for 10 days due to all of the water/ leachate. Taken Date 06/25/2025 at 03:11 pm Upload Date 06/26/2025 at 06:40 am Uploaded By Bill Callaway File Name IMG_0147.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 10 of 19 Unclassified Description East facing edge of the repository. The repository has been filled to the height of the Bonneville Pile, and the east slope has been clean covered. Taken Date 06/25/2025 at 02:33 pm Upload Date 06/26/2025 at 06:40 am Uploaded By Bill Callaway File Name IMG_0146.JPG Unclassified Description Tipping edge at the repository, looking to the NE. Taken Date 06/25/2025 at 02:30 pm Upload Date 06/26/2025 at 06:40 am Uploaded By Bill Callaway File Name IMG_0145.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 11 of 19 Unclassified Description Evaporator control room. Taken Date 06/24/2025 at 04:46 pm Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name 5638D368-8D6A-495D-8… Unclassified Description Evaporator control room. Taken Date 06/24/2025 at 04:46 pm Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name B7728860-C5E7-4C79-B… ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 12 of 19 Unclassified Description Excavation of Cell 207. Taken Date 06/24/2025 at 11:58 am Upload Date 06/25/2025 at 06:29 am Uploaded By Bill Callaway File Name IMG_0144.JPG Unclassified Description Trench 207 trench bottom has been smoothed with the dozer to prepare it for backfilling operation. The last pass of waste removal can be seen in the upper right hand corner of the photo. Taken Date 06/24/2025 at 11:47 am Upload Date 06/25/2025 at 06:29 am Uploaded By Bill Callaway File Name IMG_0143.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 13 of 19 Unclassified Description Leachate being removed from cell 200 with 4” pumps. Taken Date 06/24/2025 at 11:32 am Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name DA51C88A-0716-4281-9… Unclassified Description Cell 200 looking north. Leachate being pumped and sent to evaporator via 4 inch. Taken Date 06/24/2025 at 11:32 am Upload Date 06/27/2025 at 01:23 pm Uploaded By Sam Bernard File Name DC0E4995-B5E2-494E-A… ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 14 of 19 Unclassified Description Dust control measures in Trench 200 during waste excavation. Taken Date 06/24/2025 at 10:06 am Upload Date 06/25/2025 at 06:29 am Uploaded By Bill Callaway File Name IMG_0142.JPG Unclassified Description Trench 200 waste excavation. Taken Date 06/24/2025 at 10:02 am Upload Date 06/25/2025 at 06:29 am Uploaded By Bill Callaway File Name IMG_0141.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 15 of 19 Unclassified Description Clean cover installed on the east facing side of the waste repository. Taken Date 06/23/2025 at 05:51 pm Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0140.JPG Unclassified Description Water seeping into the bottom of WP #3. Taken Date 06/23/2025 at 10:36 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0139.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 16 of 19 Unclassified Description Trash left behind in Trench 207. Taken Date 06/23/2025 at 10:15 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0138.JPG Unclassified Description Trash left behind in trench 207. Taken Date 06/23/2025 at 10:15 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0137.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 17 of 19 Unclassified Description Trash being left behind in Trench 207 Taken Date 06/23/2025 at 10:15 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0136.JPG Unclassified Description Waste excavation in Trench 207. The topography of the trench has changed causing some debris to be left behind, which will have to be cleaned up later when the trench bottom is smoothed prior to backfilling. Taken Date 06/23/2025 at 10:11 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0135.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 18 of 19 Unclassified Description Installing traps over waste debris excavated as part of the Buffer Zone excavation. Because the tarps are weighted to prevent being displaced by the wind, heavy equipment is required to move them. Taken Date 06/23/2025 at 08:18 am Upload Date 06/24/2025 at 06:32 am Uploaded By Bill Callaway File Name IMG_0134.JPG ET Design-Build | ET Environmental Printed on Mon Jun 30, 2025 at 10:54 am PDT Job #: 02-00ET1833 North Temple Landfill Remediation 1700 S. 4650 West Salt Lake City , Utah 84104 8017260707 Page 19 of 19