HomeMy WebLinkAboutDAQ-2024-007316DAQC-296-24
Site ID 12103 (B4)
Dani Baldwin
MountainWest Pipeline, LLC
P.O. Box 45922
Salt Lake City, UT 84145
Re:MountainWest Pipeline, LLC – Oak Spring Turbine Compressor Station/Turbine T-3 – Protocol Review and Test Date Confirmation – Carbon County
Dear Ms.Baldwin:
The testing protocol for Turbine T-3 at Oak Spring Turbine Compressor Station dated March 22, 2024, has been reviewed and found acceptable. The agreed upon test date is May 15, 2024.
Acceptance of a protocol does not relieve the owner/operator and the testing contractor from strict adherence to all applicable EPA methods, Utah Division of Air Quality (DAQ) policies,
Utah Air Quality Rules (UAQR), and methods approved by the Director. Any deviation from EPA methods, DAQ policies, UAQR, and methods approved by the Director must be addressed separately
and express written consent given prior to commencement of testing.
The DAQ requires that all test reports include a statement that:
A.Testing was conducted while the source was operating at the rate and/or conditions specified in the applicable approval order, operating permit, or federal regulation.
B.During testing, the source combusted fuels, used raw materials, and maintained process conditions representative of normal operations, and operated under such other relevant conditions
specified by the Director.
C.Based on information and belief formed after reasonable inquiry, the statements and information contained in the report are true, accurate, and complete.
If you have any questions, call me at (385) 306-6533 or e-mail me at kgreenberg@utah.gov.
Sincerely,
Kyle Greenberg, Environmental Scientist
Division of Air Quality
RO:KG:jlcc:Southeast Utah Health Department