HomeMy WebLinkAboutDAQ-2024-007307Page 1 of 10
Notification of Compliance Status
National Emission Standards for Hazardous Air Pollutants:
Area Source Standards for Nine Metal Fabrication and Finishing Source Categories
40 CFR 63 subpart XXXXXX
Section 1. Facility Information
Date of Notification of Compliance Status: _1-2-2024_
Compliance date: Existing source: July 25, 2011 New source: __________________
(Date of startup)
Source category and NAICS code(s): ___Fabricated Structural Metal Manufacturing__NAICS_332312_____
_________________________________________________________________________________
_________________________________________________________________________________
Company name __GEM Buildings______________________________________________________
Facility name (if different): ____________________________________________________________
Facility (physical location) address:__1025 N. Watery Lane, Brigham City Utah, 84302_____________
_________________________________________________________________________________
Owner name/title: _______Kyle Hansen / President________________________________________
Owner/company address:________1025 N. Watery Lane, Brigham City Utah, 84302______________
____________________________________________________________________________________
Owner telephone number __(435)723-5000__________________________________________________
Owner email address (if available): ______ ___________________________
Is the Operator the same person as the Owner? Yes No
If the Operator information is different from the Owner, please provide the following:
a This is an example of the type of information that must be submitted to fulfill the Notification of Compliance Status requirement of 40
CFR 63, subpart XXXXXX. You may submit the information in another form or format, or you may use this form.
REVIEWEDInitials: CG Date: 4-10-24
Compliance Status: In Compliance - NESHAP
Subpart 6X Annual Notification and VEO Records
File # 11506 (B2)
Page 2 of 10
Operator name/title: _______GEM Buildings___________________________________________
Operator telephone number: ____435-723-5000________________
Operator email address (if available): _________________________________________________
Page 3 of 10
Section 2. Identification of Affected Operations
(1) The following are the operations at this facility subjectb to subpart XXXXXX
(check all that apply):
Dry Abrasive Blasting
(1) Totally enclosed and unvented blast chambers
(2) Vented enclosures with a filtration control device
(3) Objects over 8 feet in any dimension without a filtration control device
Dry Machining
Dry Grinding or Dry Polishing with Stationary Machines
Spray Painting
(1) In a spray booth
(2) Without a spray booth (for Fabricated Structural Metal facilities or any
objects over 15 feet)
Welding
(1) Use less than 2,000 pounds of MFHAP-containingb welding rod or wire
annually
(2) Use 2,000 pounds or more of MFHAP-containingb welding rod or
welding wire annually
b Important Note: These operations are affected sources under subpart XXXXXX only if/when they use materials
that contain or have the potential to emit metal fabrication or finishing metal HAP (MFHAP). MFHAP
containing/potential is defined to be when the compounds of cadmium, chromium, lead, manganese, and nickel, or
any of these metals in the elemental form with the exception of lead, are used or have the potential to be emitted in
quantities of 0.1 percent or more, or 1.0 percent or more for elemental of compounds of manganese.
Page 4 of 10
(2) The following table lists each dry abrasive blasting operation at this facility subject to
subpart XXXXXX, noted previously in item (1) in Section 2):
Abrasive Blasting
Process Description / ID No.
HAP
Emitted or Usedb
(Cd, Cr, Pb, Mn, Ni)
Compliance Method
(Check all that apply)
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Totally enclosed, unvented
Vented, with control device;
describe _____________________
Objects over 8 ft (with no control)
Management practices
Page 5 of 10
(3) The following table lists each dry machining, dry grinding, or dry polishing operation
subject to subpart XXXXXX, noted previously in item (1) in Section 2:
Dry Machining, Dry Grinding,
or Dry Polishing
Process Description / ID No.
HAP
Emitted or Usedb
(Cd, Cr, Pb, Mn, Ni)
Compliance Method
(Check all that apply)
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Control device;
describe_______________________
Management practices
Page 6 of 10
(4) The following table lists each spray painting operation subject to subpart XXXXXX,
noted previously in item (1) in Section 2:
Spray Painting
Process Description / ID No.
HAP
Emitted or Usedb
(Cd, Cr, Pb, Mn, Ni)
Compliance Methods Employed
(Check all that apply)
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Spray booth, PM filter, HVLP spray guns
HVLP spray guns, only
Management practices
Page 7 of 10
(5) The following table lists each welding operation subject to subpart XXXXXX, noted
previously in item (1) in Section 2:
Welding Process Description
/ ID No.
HAP
Emitted or Usedb
(Cd, Cr, Pb, Mn, Ni)
Compliance Methods
Employed
(Check all that apply)
Metal Inert Gas-Gas Metal Arc
Welding (MIG-GMAW
Cr, Mn, Ni,
All from .1 - <1%
Management practices
Fume capture device;
describe weld indoors
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Management practices
Fume capture device;
describe _____________________
Page 8 of 10
(6) The following applicable management practices are used at this facility, as practicable
(check all that apply):
Dry Abrasive Blasting
Minimize dust generation during emptying of abrasive blasting enclosure to reduce MFHAP emissions, as
practicable.
Operate all equipment associated with dry abrasive blasting operations according to the manufacturer's
instructions.
Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable.
Enclose dusty abrasive storage areas and holding bins, seal chutes and conveyors that transport abrasive
materials.
Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable
Do not re-use dry abrasive blasting media unless contaminants (i.e., any material other than the base metal, such
as paint residue) have been removed by filtration or screening, and the abrasive material conforms to its original
size.
When practicable, switch from high particulate matter (PM)-emitting blast media (e.g., sand) to low PM-emitting
blast media (e.g., crushed glass, specular hematite, steel shot, aluminum oxide).
Dry Machining, Dry Grinding, Dry Polishing
Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable
Operate equipment according to manufacturer's instructions.
Spray Painting
Proper cleaning and storage of spray guns, if applicable.
Training for employees using HVLP spray equipment, with certification as having completed classroom or hands-
on training in the proper selection, mixing, and application of coatings, with refresher training repeated at least
once every 5 years.
Welding
Operate equipment according to manufacturer's instructions.
Use welding processes with reduced fum e generation capabilities, if practicable. (e.g., gas metal arc welding
(GMAW)—also called metal inert gas welding (MIG))
Use welding process variations (e.g., pulsed current GMAW), which can reduce fume generation rates, if
practicable.
Use welding filler metals, shielding gases, carrier gases, or other process materials which are capable of reduced
welding fume generation, if practicable.
Optimize welding process variables (e.g., electrode diameter, voltage, amperage, welding angle, shield gas
flow rate, travel speed) to reduce the amount of welding fume generated, if practicable.
Use a welding fume capture and control system, operated according to the manufacturer’s specifications, if
practicable.
Page 9 of 10
Section 3. Certification of Compliance Status
Yes, the facility referenced below IS operating in compliance with all of the relevant standards
and other requirements of 40 CFR Part 63 subpart XXXXXX, National Emission Standards
for Hazardous Air Pollutants: Area Source Standards for Nine Metal Fabrication and Finishing
Source Categories
No, the facility referenced below is NOT operating in compliance with the relevant standards
And/or other requirements of 40 CFR Part 63 subpart XXXXXX, National Emission Standards
for Hazardous Air Pollutants: Area Source Standards for Nine Metal Fabrication and Finishing
Source Categories
Reason for noncompliance:
____________________________________________________________________________
____________________________________________________________________________
I hereby certify that the information presented herein is correct to the best of my knowledge.
________________________________ ___________1/2/2024____
(Signature) (Date)
_ _W. Wayne McCandless____________ (435)538-5398_
(Name/title) (Telephone No.)
Page 10 of 10
Section 4. Submittal
Submit the Notification of Compliance Status to one of the following offices, as appropriate:
a. If your State has been delegated the authority for this regulation under section 112(l) of the Clean Air
Act c, submit the notification to your State agency found at the following link:
http://www.epa.gov/ttn/atw/area/table_state_contacts.doc
If your state/local contact is not listed at the above link, use this link:
http://www.4cleanair.org/contactUsaLevel.asp
b. If your EPA Region has assumed the authority for this rule, submit the notification to your Regional
Office of the EPA, from list below:
EPA Region I (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont)
5 Post Office Square, Suite 100, Mail code: OES04-2,
Boston MA 02109-3912 Attention: Air Clerk
EPA Region II (New Jersey, New York, Puerto Rico, Virgin Islands),
Director, Division of Enforcement and Compliance Assistance
290 Broadway, New York, NY 10007-1866
EPA Region III (Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, West Virginia)
Director, Air Protection Division, 1650 Arch Street, Philadelphia, PA 19103
EPA Region IV (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee)
Director, Air, Pesticides and Toxics Management Division
Atlanta Federal Center, 61 Forsyth Street, Atlanta, GA 30303–3104
EPA Region V (Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin)
Director, Air and Radiation Division, 77 West Jackson Blvd., Chicago, IL 60604–3507
EPA Region VI (Arkansas, Louisiana, New Mexico, Oklahoma, Texas)
Director, Air, Pesticides and Toxics, 1445 Ross Avenue, Dallas, TX 75202–2733
EPA Region VII (Iowa, Kansas, Missouri, Nebraska)
Director, Air and Waste Management Division, U.S. Environmental Protection Agency
901 N. 5th Street, Kansas City, KS 66101
EPA Region VIII (Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming)
Director, Air and Toxics Technical Enforcement Program, Office of Enforcement, Compliance and
Environmental Justice, 1595 Wynkoop Street, Denver, CO 80202-1129
EPA Region IX (Arizona, California, Hawaii, Nevada, American Samoa, Guam)
Director, Air and Toxics Division, 75 Hawthorne Street, San Francisco, CA 94105
EPA Region X (Alaska, Idaho, Oregon, Washington)
Director, Office of Air, Waste and Toxics, 1200 6th Ave., Suite 900, AWT-107, Seattle, WA 98101
c To determine whether your State has been delegated the authority for this regulation under section 112(l) of the Clean
Air Act, contact your EPA Regional Office, listed above.
Visual Determination Schedule - Welding
2023
Check (or mark date of inspecttion) in each square once complete.
Daily
(Once each work day for ten
work days.)
1 2 3 4 5
6 7 8 9 10
Once ten daily inspections have been completed, begin the weekly inspections.
Weekly
(Once every fifth work day.)
1 2 3 4
Once four weekly inspections have been completed, begin the monthly inspections.
Monthly
(Once every calendar month.)
1 2 3
Once three monthly inspections have been completed, begin the quarterly inspections.
Quarterly
(Once every calendar quarter.)1/5/2023
4:40 - 4:44
pm. No
Smoke
4/10/2023
3:45 - 4:00
pm. No
smoke
7-5-2023
6:30 - 6:45
pm. No
smoke
10-10-23
4:50 - 5:05
pm. No
Smoke
If any observation has more than 360 seconds with visible emissions, refer to NESHAP XXXXXX for
additional requirements.
4/10/24, 4:12 PM State of Utah Mail - Notice of Compliance and Quarterly observations for GEM Buildings.
https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1787026427610428784&simpl=msg-f:1787026427610428784 1/1
Chad Gilgen <cgilgen@utah.gov>
Notice of Compliance and Quarterly observations for GEM Buildings.
1 message
Wayne McCandless <waynem@gembuildings.com>Tue, Jan 2, 2024 at 5:20 PM
To: Chad Gilgen <cgilgen@utah.gov>
Chad,
Here are the quarterly observations and the notice of compliance for 2023. Please let me know if you have any
questions.
Thanks,
Wayne McCandless
Safety Manager
GEM Buildings
(435) 723-5000 main
(435) 538-5398 direct
(435) 723-8850 fax
(435) 720-7077 cell
www.gembuildings.com
The premier full service structural steel
engineering, design and fabrication organization.
________________________
IMPORTANT NOTICE: This communication, including any attachments, contains information that may be confidential or privileged, and is intended
solely for the named designated recipient to whom it is addressed and for the specific purpose intended. If the reader of this message is not the
intended recipient, you should delete this message and are hereby notified that any review, disclosure, dissemination, copying, or distribution of this
message is strictly prohibited. If you have received this communication in error, please notify us immediately at the e-mail address set forth.
2 attachments
GEM annual_metalcomp 2024.doc
180K
Quarterly visual observations 2023.xlsx
54K