Loading...
HomeMy WebLinkAboutDAQ-2024-007307Page 1 of 10 Notification of Compliance Status National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Nine Metal Fabrication and Finishing Source Categories 40 CFR 63 subpart XXXXXX Section 1. Facility Information Date of Notification of Compliance Status: _1-2-2024_ Compliance date: Existing source: July 25, 2011 New source: __________________ (Date of startup) Source category and NAICS code(s): ___Fabricated Structural Metal Manufacturing__NAICS_332312_____ _________________________________________________________________________________ _________________________________________________________________________________ Company name __GEM Buildings______________________________________________________ Facility name (if different): ____________________________________________________________ Facility (physical location) address:__1025 N. Watery Lane, Brigham City Utah, 84302_____________ _________________________________________________________________________________ Owner name/title: _______Kyle Hansen / President________________________________________ Owner/company address:________1025 N. Watery Lane, Brigham City Utah, 84302______________ ____________________________________________________________________________________ Owner telephone number __(435)723-5000__________________________________________________ Owner email address (if available): ______ ___________________________ Is the Operator the same person as the Owner? Yes No If the Operator information is different from the Owner, please provide the following: a This is an example of the type of information that must be submitted to fulfill the Notification of Compliance Status requirement of 40 CFR 63, subpart XXXXXX. You may submit the information in another form or format, or you may use this form. REVIEWEDInitials: CG Date: 4-10-24 Compliance Status: In Compliance - NESHAP Subpart 6X Annual Notification and VEO Records File # 11506 (B2) Page 2 of 10 Operator name/title: _______GEM Buildings___________________________________________ Operator telephone number: ____435-723-5000________________ Operator email address (if available): _________________________________________________ Page 3 of 10 Section 2. Identification of Affected Operations (1) The following are the operations at this facility subjectb to subpart XXXXXX (check all that apply): Dry Abrasive Blasting (1) Totally enclosed and unvented blast chambers (2) Vented enclosures with a filtration control device (3) Objects over 8 feet in any dimension without a filtration control device Dry Machining Dry Grinding or Dry Polishing with Stationary Machines Spray Painting (1) In a spray booth (2) Without a spray booth (for Fabricated Structural Metal facilities or any objects over 15 feet) Welding (1) Use less than 2,000 pounds of MFHAP-containingb welding rod or wire annually (2) Use 2,000 pounds or more of MFHAP-containingb welding rod or welding wire annually b Important Note: These operations are affected sources under subpart XXXXXX only if/when they use materials that contain or have the potential to emit metal fabrication or finishing metal HAP (MFHAP). MFHAP containing/potential is defined to be when the compounds of cadmium, chromium, lead, manganese, and nickel, or any of these metals in the elemental form with the exception of lead, are used or have the potential to be emitted in quantities of 0.1 percent or more, or 1.0 percent or more for elemental of compounds of manganese. Page 4 of 10 (2) The following table lists each dry abrasive blasting operation at this facility subject to subpart XXXXXX, noted previously in item (1) in Section 2): Abrasive Blasting Process Description / ID No. HAP Emitted or Usedb (Cd, Cr, Pb, Mn, Ni) Compliance Method (Check all that apply) Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Totally enclosed, unvented Vented, with control device; describe _____________________ Objects over 8 ft (with no control) Management practices Page 5 of 10 (3) The following table lists each dry machining, dry grinding, or dry polishing operation subject to subpart XXXXXX, noted previously in item (1) in Section 2: Dry Machining, Dry Grinding, or Dry Polishing Process Description / ID No. HAP Emitted or Usedb (Cd, Cr, Pb, Mn, Ni) Compliance Method (Check all that apply) Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Control device; describe_______________________ Management practices Page 6 of 10 (4) The following table lists each spray painting operation subject to subpart XXXXXX, noted previously in item (1) in Section 2: Spray Painting Process Description / ID No. HAP Emitted or Usedb (Cd, Cr, Pb, Mn, Ni) Compliance Methods Employed (Check all that apply) Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Spray booth, PM filter, HVLP spray guns HVLP spray guns, only Management practices Page 7 of 10 (5) The following table lists each welding operation subject to subpart XXXXXX, noted previously in item (1) in Section 2: Welding Process Description / ID No. HAP Emitted or Usedb (Cd, Cr, Pb, Mn, Ni) Compliance Methods Employed (Check all that apply) Metal Inert Gas-Gas Metal Arc Welding (MIG-GMAW Cr, Mn, Ni, All from .1 - <1% Management practices Fume capture device; describe weld indoors Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Management practices Fume capture device; describe _____________________ Page 8 of 10 (6) The following applicable management practices are used at this facility, as practicable (check all that apply): Dry Abrasive Blasting Minimize dust generation during emptying of abrasive blasting enclosure to reduce MFHAP emissions, as practicable. Operate all equipment associated with dry abrasive blasting operations according to the manufacturer's instructions. Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable. Enclose dusty abrasive storage areas and holding bins, seal chutes and conveyors that transport abrasive materials. Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable Do not re-use dry abrasive blasting media unless contaminants (i.e., any material other than the base metal, such as paint residue) have been removed by filtration or screening, and the abrasive material conforms to its original size. When practicable, switch from high particulate matter (PM)-emitting blast media (e.g., sand) to low PM-emitting blast media (e.g., crushed glass, specular hematite, steel shot, aluminum oxide). Dry Machining, Dry Grinding, Dry Polishing Minimize excess dust in the surrounding area to reduce MFHAP emissions, as practicable Operate equipment according to manufacturer's instructions. Spray Painting Proper cleaning and storage of spray guns, if applicable. Training for employees using HVLP spray equipment, with certification as having completed classroom or hands- on training in the proper selection, mixing, and application of coatings, with refresher training repeated at least once every 5 years. Welding Operate equipment according to manufacturer's instructions. Use welding processes with reduced fum e generation capabilities, if practicable. (e.g., gas metal arc welding (GMAW)—also called metal inert gas welding (MIG)) Use welding process variations (e.g., pulsed current GMAW), which can reduce fume generation rates, if practicable. Use welding filler metals, shielding gases, carrier gases, or other process materials which are capable of reduced welding fume generation, if practicable. Optimize welding process variables (e.g., electrode diameter, voltage, amperage, welding angle, shield gas flow rate, travel speed) to reduce the amount of welding fume generated, if practicable. Use a welding fume capture and control system, operated according to the manufacturer’s specifications, if practicable. Page 9 of 10 Section 3. Certification of Compliance Status Yes, the facility referenced below IS operating in compliance with all of the relevant standards and other requirements of 40 CFR Part 63 subpart XXXXXX, National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Nine Metal Fabrication and Finishing Source Categories No, the facility referenced below is NOT operating in compliance with the relevant standards And/or other requirements of 40 CFR Part 63 subpart XXXXXX, National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Nine Metal Fabrication and Finishing Source Categories Reason for noncompliance: ____________________________________________________________________________ ____________________________________________________________________________ I hereby certify that the information presented herein is correct to the best of my knowledge. ________________________________ ___________1/2/2024____ (Signature) (Date) _ _W. Wayne McCandless____________ (435)538-5398_ (Name/title) (Telephone No.) Page 10 of 10 Section 4. Submittal Submit the Notification of Compliance Status to one of the following offices, as appropriate: a. If your State has been delegated the authority for this regulation under section 112(l) of the Clean Air Act c, submit the notification to your State agency found at the following link: http://www.epa.gov/ttn/atw/area/table_state_contacts.doc If your state/local contact is not listed at the above link, use this link: http://www.4cleanair.org/contactUsaLevel.asp b. If your EPA Region has assumed the authority for this rule, submit the notification to your Regional Office of the EPA, from list below: EPA Region I (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont) 5 Post Office Square, Suite 100, Mail code: OES04-2, Boston MA 02109-3912 Attention: Air Clerk EPA Region II (New Jersey, New York, Puerto Rico, Virgin Islands), Director, Division of Enforcement and Compliance Assistance 290 Broadway, New York, NY 10007-1866 EPA Region III (Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, West Virginia) Director, Air Protection Division, 1650 Arch Street, Philadelphia, PA 19103 EPA Region IV (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee) Director, Air, Pesticides and Toxics Management Division Atlanta Federal Center, 61 Forsyth Street, Atlanta, GA 30303–3104 EPA Region V (Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin) Director, Air and Radiation Division, 77 West Jackson Blvd., Chicago, IL 60604–3507 EPA Region VI (Arkansas, Louisiana, New Mexico, Oklahoma, Texas) Director, Air, Pesticides and Toxics, 1445 Ross Avenue, Dallas, TX 75202–2733 EPA Region VII (Iowa, Kansas, Missouri, Nebraska) Director, Air and Waste Management Division, U.S. Environmental Protection Agency 901 N. 5th Street, Kansas City, KS 66101 EPA Region VIII (Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming) Director, Air and Toxics Technical Enforcement Program, Office of Enforcement, Compliance and Environmental Justice, 1595 Wynkoop Street, Denver, CO 80202-1129 EPA Region IX (Arizona, California, Hawaii, Nevada, American Samoa, Guam) Director, Air and Toxics Division, 75 Hawthorne Street, San Francisco, CA 94105 EPA Region X (Alaska, Idaho, Oregon, Washington) Director, Office of Air, Waste and Toxics, 1200 6th Ave., Suite 900, AWT-107, Seattle, WA 98101 c To determine whether your State has been delegated the authority for this regulation under section 112(l) of the Clean Air Act, contact your EPA Regional Office, listed above. Visual Determination Schedule - Welding 2023 Check (or mark date of inspecttion) in each square once complete. Daily (Once each work day for ten work days.) 1 2 3 4 5 6 7 8 9 10 Once ten daily inspections have been completed, begin the weekly inspections. Weekly (Once every fifth work day.) 1 2 3 4 Once four weekly inspections have been completed, begin the monthly inspections. Monthly (Once every calendar month.) 1 2 3 Once three monthly inspections have been completed, begin the quarterly inspections. Quarterly (Once every calendar quarter.)1/5/2023 4:40 - 4:44 pm. No Smoke 4/10/2023 3:45 - 4:00 pm. No smoke 7-5-2023 6:30 - 6:45 pm. No smoke 10-10-23 4:50 - 5:05 pm. No Smoke If any observation has more than 360 seconds with visible emissions, refer to NESHAP XXXXXX for additional requirements. 4/10/24, 4:12 PM State of Utah Mail - Notice of Compliance and Quarterly observations for GEM Buildings. https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1787026427610428784&simpl=msg-f:1787026427610428784 1/1 Chad Gilgen <cgilgen@utah.gov> Notice of Compliance and Quarterly observations for GEM Buildings. 1 message Wayne McCandless <waynem@gembuildings.com>Tue, Jan 2, 2024 at 5:20 PM To: Chad Gilgen <cgilgen@utah.gov> Chad, Here are the quarterly observations and the notice of compliance for 2023. Please let me know if you have any questions. Thanks, Wayne McCandless Safety Manager GEM Buildings (435) 723-5000 main (435) 538-5398 direct (435) 723-8850 fax (435) 720-7077 cell www.gembuildings.com The premier full service structural steel engineering, design and fabrication organization. ________________________ IMPORTANT NOTICE: This communication, including any attachments, contains information that may be confidential or privileged, and is intended solely for the named designated recipient to whom it is addressed and for the specific purpose intended. If the reader of this message is not the intended recipient, you should delete this message and are hereby notified that any review, disclosure, dissemination, copying, or distribution of this message is strictly prohibited. If you have received this communication in error, please notify us immediately at the e-mail address set forth. 2 attachments GEM annual_metalcomp 2024.doc 180K Quarterly visual observations 2023.xlsx 54K