Loading...
HomeMy WebLinkAboutDERR-2025-004763 SITE VISIT REPORT DATE: 05/20/2025 SITE: Schovaers Electronics VCP SITE ADDRESS: 22 South Jeremy Street, SLC, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Steve Maliszeski (Terracon) ARRIVAL TIME: 1350 - DEPARTURE TIME: 1530 Split Samples Collected: NA Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: DERR met with Terracon on-site to oversee the implementation of the Sampling and Analysis Plan. Upon DERR's arrival, drillers were completing the installation of the final two groundwater wells at the Site, and Terracon was logging the soil cores. Terracon reported no signs of staining or odor, and PID readings were taken approximately every foot. Terracon was also finalizing the installation of the last remaining vapor pin inside the building. Decontamination procedures were observed. PHOTO LOG: Photo 1: Monitoring well installation. Photo 2: Logging of soil cores. Photo 3: Decontamination procedures observed.