HomeMy WebLinkAboutDERR-2025-004761 SITE VISIT REPORT DATE: 05/25/2025 SITE: The Paxton VCP #129 SITE ADDRESS: 215 Paxton Avenue, Salt Lake City, Utah PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Kendra Caskey (Geosyntec) ARRIVAL TIME: 10:10 AM - DEPARTURE TIME: 10:55 AM Split Samples Collected: No Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: DERR arrived on-site and met with the Environmental Professional for Geosyntec. The purpose of the visit was to oversee the implementation of the Remedial Action Plan. When the DERR arrived, the contractor was working to remove the last foundation in the northwest corner of the site, and placing the concrete directly into the waiting trucks. DERR observed Geosyntec screen the soils beneath the foundation with a PID, including the darker soils, with no hits registered on the PID. All other foundations have been removed and all shallow soil impacts have also been removed. The subsurface excavation at the northeast corner of the site near MW-3 had also been excavated. The last remaining area to be removed is the concrete pad and nearby pavement used to store the hydraulic fluid and other objects for EnviroCare. Geosyntec has reached out to EnviroCare to get the ETA on when these will be removed from the site. PHOTO LOG: Photo 1: Soil wetting to reduce dust. Photo 2: Excavation at MW-3. Photo 3: Pulling foundations. Photo 4: Screening soil underneath foundations with a PID.