Loading...
HomeMy WebLinkAboutDERR-2025-004759 SITE VISIT REPORT DATE: 06/24/2025 SITE: The Paxton VCP SITE ADDRESS: 215 Paxton Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Kendra Caskey (Geosyntec) ARRIVAL TIME - DEPARTURE TIME: 7:30-8:00 AM, 10:00-10:45 AM Split Samples Collected: No Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: DERR arrived on-site and met the Environmental Professional for Geosyntec. The purpose of the visit was to oversee the last remaining shallow soil area that needed to be excavated due to one hit of lead above the Residential RSL. This area, designated B-14, is situated in the western part of the site. All sidewall samples from this location were below cleanup levels, requiring only one additional bottom confirmation sample after further excavation. An additional foot and a half of soil was removed before collecting this sample. All other areas at the Site have been remediated, and trenches have been backfilled with existing shallow soil at the Site (previous confirmation samples reporting constituent levels below cleanup levels). Hydraulic fluid has also been removed from the Site by EnviroCare. Dust control measures, including soil wetting, trackout minimization, and the use of tarp-covered trucks, were consistently implemented. All work was being done in accordance with the RAP. PHOTO LOG: Photo 1: Soil wetting to reduce dust. Photo 2: Area of additional excavation and where bottom confirmation sample (near B-14) will be taken.