Brent H. Everett
Director
ERRL-0219-25
June 19, 2025
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
Christopher Rose
Staker Parson Materials and Construction
89 West 13490 South, Suite 100
Draper, Utah 84020
Re: Subsurface Investigation Requirements
Francis Gravel Pit, 2570 East Spring Hollow Road, Francis
Facility ID 7000162, Release ONO
Dear Mr. Rose:
A release of petroleum from a petroleum storage tank (PST) at the above-referenced site
was reported on May 30, 2025, to the Division of Environmental Response and Remediation
(DERR) based on observations made at a fuel island and generator tank owned by a third-party
contractor that is working at the property. According to Utah Administrative Code R311-202, you
are required to report, control, abate, and characterize the release by defining the extent and degree
of petroleum contamination and remediate (clean up) the release. These regulations require that you
prepare specific reports addressing the release and submit them to the DERR within specified time
frames following the release.
The DERR project manager has reviewed the release report information, and additional
investigation is required. The project manager relied on the information provided to the DERR and
did not investigate the facility independently. The investigation's intent is to define the extent and
degree of subsurface petroleum contamination and evaluate the potential risks to human health and
the environment. Sampling, abatement, and cleanup activities must be performed by a Utah
Certified PST Consultant or Sampler as outlined by Utah Admin. Code R311-201-2(a). A
Subsurface Investigation Report (SIR) outlining the results of the investigation must be submitted
to the DERR within 90 days of your receipt of this letter.
Requirements for an SIR are found on our website: https://deq.utah.gov/environmental-
response-and-remediation/guidance-documents-references-lust-program.
Facility ID 7000162
Page 2
The DERR project manager will evaluate the SIR findings to determine whether a No
Further Action (closeout) recommendation can be made or if additional work is necessary. This
additional work may include investigation, cleanup, monitoring, and/or risk assessment.
Section 19-6-420(10)(a) of the Underground Storage Tank Act allows the DERR to recover
certain expenses incurred for petroleum releases not covered by the PST Fund. The DERR’s
expenses for managing and overseeing the abatement, investigation, or corrective action are billed
quarterly to the responsible party. The Utah Legislature sets rates for oversight and review, currently
$125.00 per hour. Payment will be due within 30 days of the billing. Certain factors may be
considered by the Division Director when determining whether to recover these management and
oversight costs. If the responsible party can demonstrate an inability to pay, the Division Director
may grant an exemption from paying these expenses. You may contact us to request an application
for exemption, if needed.
If you have any questions, please contact Quinn Walker, the DERR project manager, at
(385) 391- 8154.
Sincerely,
Brent H. Everett, Director
Division of Environmental Response and Remediation
BHE/QMW/rr
cc: Nathan Brooks, Environmental Health Director, Summit County Health Department
*support staff will automatically email health department contacts
LUST Correspondence Sign-Off Sheet
ERRL# __________
Author: Date to be mailed by:
File Location: File Name: _________________________________
Enclosure(s) needed? Attach Enclosure(s):
How to send to recipients*?
PM verified site status in database is current?
Draft Approval Process
Project Manager ___________________ __________ ____________
Section Manager ___________________ __________ ____________
Branch Manager ___________________ __________ ____________
Final Approval Process
Section Support ___________________ __________ ____________
Author ___________________ __________ ____________
Branch Support ___________________ __________ ____________
Admin Support ___________________ __________ ____________
Mailing
Certified Mail? Mailed by:
Enclosure(s) Included? Date Mailed:
cc’s sent?
EQDocs #: ________________________ Attach Final Letter:
Contact information and/or special instructions:
QW
Quinn Walker 6/19/2025
FAC ID 7000162 ONO - Francis Gravel Pit SIR Letter.docxLUST RA Draft Folder
No
certified mail
4
Quinn Walker 06/12/2025
C 06/12/2025Chris o2ell
organ Atkinson 06/1т/2025
RR
RR
0219-25
06/1т/2025Rachele Rhoades
QWQuinn Walker 06/17/2025
SS 06/17/2025Seini Siala