HomeMy WebLinkAboutDSHW-2025-002994Site Information
Finalized Yes
Facility Name Diamond K Heber Transfer Station
Facility_ID SW0144
Facility Name Diamond K Heber Transfer Station
Street Address 2214 South 670 West
City Heber
ZIP Code 84032
County Wasatch
Inspection Date 01-23-2025
Type of Visit Routine Oversite
Is the Visit Announced?Yes
Weather Conditions
Inspection Goal To determine compliance with solid waste rules and conditions of the plan
of operation.
Facility Contact Clint
Participants Shane Hubbard
Follow Up Inspection Needed?No
Recommended Follow Up Date
Depart Office Date 01-23-2025
Depart Office time 06:00 AM (-6 GMT)
Return to Office Date 01-23-2025
Return to Office time 01:00 PM (-6 GMT)
1. Pre-Inspection Review
1.1 Permit Review Yes
Comment Plan of Operation was reviewed prior to the inspection.
1.2 Annual Report Review No
Comment Annual report was not reviewed prior to the inspection.
1.3 Previous Inspection Review Yes
Comment Previous inspection was reviewed and conducted while under previous
ownership.
1.4 Facility Contacts Confirmed Yes
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 1 of 6
Comment Facility contacts were confirmed.
1.5 Facility Contacted (If an
announced inspection)
Yes
Comment Facility was contacted prior to the inspection.
1.6 Local Health Contacted No
Comment Local health was not contacted prior to the inspection.
1.7 Other N/A
Comment This facility only receives waste from contracted garbage pickup
companies. They do not receive waste from the general public.
2. Facility / Operational Controls (1-Good, 5-Poor)
2.1 Litter 1
2.2 Roads 1
2.3 Gate House Operations 1
2.4 Vectors 1
2.5 Communications 1
2.6 Recycling Area 1
2.7 Fugitive Dust Control 1
2.8 Waste Inspection Area 1
2.9 Scavenging Control 1
2.10 Open Burning NA
2.11 Fences, Gates, Locks,
Access Control
1
2.12 Working Face 1
2.13 Daily - Soil NA
2.14 Daily - Alternative NA
2.15 Leachate Collection System NA
2.16 Other NA
Comment (Required)Facility was clean and continuously had trash received from garbage trucks
and hauled to other landfill locations.
3. Signs Required / Properly Posted
3.1 Operating Days / Hours Yes
3.2 Directions & Procedures Yes
3.3 Emergency Numbers Yes
3.4 List of Unacceptable Materials Yes
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 2 of 6
3.5 Other Yes
Comment (Required)Facility signage communicated operations, procedures, and other required
information.
4. Operator / Representative / Employees
4.1 On-site While Open Yes
4.2 Training Yes
4.3 Other N/A
Comment (Required)Operator and employees were onsite during the inspection.
5. Monitoring
5.1 Methane N/A
5.2 Random Inspections Yes
5.3 Leachate N/A
5.4 Ground Water N/A
5.5 Other N/A
Comment (Required)Random inspections were being conducted by the facility.
6. Drainage / Erosion
6.1 Water Run-on N/A
6.2 Water Run-off N/A
6.3 Other N/A
Comment (Required)Drainage and erosion control did not apply to this concrete floor facility.
7. Proper Storage / Isolation / Disposal
7.1 Special Waste N/A
7.2 Batteries Yes
7.3 Hazardous Waste N/A
7.4 Infectious Waste N/A
7.6 Dead Animals N/A
7.7 Asbestos N/A
7.8 Bulky Waste Yes
7.9 Contaminated Soil N/A
7.10 Ash N/A
7.11 Sludge N/A
7.12 Other N/A
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 3 of 6
Comment (Required)Any bulky waste received was being separated for transfer. Batteries were
properly stored.
8. Cover
8.1 Intermediate N/A
8.2 Final N/A
8.3 Vegetation N/A
8.4 Other N/A
Comment (Required)Cover does not apply to this facility.
9. Inspection Records
9.1 Random Inspection Report Yes
9.2 Gas Monitoring System N/A
9.3 Surface Drainage Control N/A
9.4 Daily Records Yes
9.5 Weight or Volumes Yes
9.6 Intermediate Cover N/A
9.7 Final Cover N/A
9.8 Self Inspection (Quarterly
Reports)
Yes
9.9 Deviation From Plans N/A
9.10 Permit, Permit Application,
and Rules Available
Yes
9.11 Other N/A
Comment (Required)Inspections were being conducted and documented on a regular basis. All
documents were being managed at their public facility nearby.
10. Monitoring / Sampling / Analysis Records
10.1 Explosive Gas Monitoring N/A
10.2 Leachate Sampling &
Treatment
N/A
10.3 Ground Water Sampling
Results
N/A
10.4 Other N/A
Comment (Required)Monitoring, sampling, and analysis are not required at this location at this
time.
11. Special Waste Records
11.1 Lab Analysis Results N/A
11.2 Manifests N/A
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 4 of 6
11.3 Treatment Certification N/A
11.4 Paint Filter Test Results N/A
11.5 Onsite Treatment
Documentation
N/A
11.6 Other N/A
Comment (Required)Transfer station does not receive special wastes.
12. Waste Tires
12.1 Acceptance procedures for
Waste Tires
N/A
12.2 Waste Tire Pile Segregated N/A
12.3 Estimated Quanitity of Waste
Tires
No
Number of Tires
12.4 Waste Tire Fund Training
Comment (Required)Waste tires are not received at ths facility.
13 Other Items
13.1 Notice of Inspections Form
Completed and Signed
N/A
13.2 N/A
13.3 N/A
13.4 N/A
Comment (Required)No additional items.
14. Special Permit Requirements
14.1 N/A
14.2 N/A
14.3 N/A
Comment (Required)No special permit requirements.
General Comments
Comments Facility in general was clean, organized, and had great communication.
The tipping floor was kept clean for both waste inspections and transfer.
DWMRC Inspector Signature
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 5 of 6
DWMRC Inspector Name Bryan Watt
Date/Time 01-23-2025
Photos
Attach Photos
Date Submitted: 06-20-2025 10:52 AM
Submitted By: bryanwatt@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 6 of 6