Loading...
HomeMy WebLinkAboutDSHW-2025-002994Site Information Finalized Yes Facility Name Diamond K Heber Transfer Station Facility_ID SW0144 Facility Name Diamond K Heber Transfer Station Street Address 2214 South 670 West City Heber ZIP Code 84032 County Wasatch Inspection Date 01-23-2025 Type of Visit Routine Oversite Is the Visit Announced?Yes Weather Conditions Inspection Goal To determine compliance with solid waste rules and conditions of the plan of operation. Facility Contact Clint Participants Shane Hubbard Follow Up Inspection Needed?No Recommended Follow Up Date Depart Office Date 01-23-2025 Depart Office time 06:00 AM (-6 GMT) Return to Office Date 01-23-2025 Return to Office time 01:00 PM (-6 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment Plan of Operation was reviewed prior to the inspection. 1.2 Annual Report Review No Comment Annual report was not reviewed prior to the inspection. 1.3 Previous Inspection Review Yes Comment Previous inspection was reviewed and conducted while under previous ownership. 1.4 Facility Contacts Confirmed Yes Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 6 Comment Facility contacts were confirmed. 1.5 Facility Contacted (If an announced inspection) Yes Comment Facility was contacted prior to the inspection. 1.6 Local Health Contacted No Comment Local health was not contacted prior to the inspection. 1.7 Other N/A Comment This facility only receives waste from contracted garbage pickup companies. They do not receive waste from the general public. 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area 1 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face 1 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other NA Comment (Required)Facility was clean and continuously had trash received from garbage trucks and hauled to other landfill locations. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours Yes 3.2 Directions & Procedures Yes 3.3 Emergency Numbers Yes 3.4 List of Unacceptable Materials Yes Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 6 3.5 Other Yes Comment (Required)Facility signage communicated operations, procedures, and other required information. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)Operator and employees were onsite during the inspection. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections Yes 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other N/A Comment (Required)Random inspections were being conducted by the facility. 6. Drainage / Erosion 6.1 Water Run-on N/A 6.2 Water Run-off N/A 6.3 Other N/A Comment (Required)Drainage and erosion control did not apply to this concrete floor facility. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries Yes 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste Yes 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other N/A Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 6 Comment (Required)Any bulky waste received was being separated for transfer. Batteries were properly stored. 8. Cover 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)Cover does not apply to this facility. 9. Inspection Records 9.1 Random Inspection Report Yes 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control N/A 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other N/A Comment (Required)Inspections were being conducted and documented on a regular basis. All documents were being managed at their public facility nearby. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other N/A Comment (Required)Monitoring, sampling, and analysis are not required at this location at this time. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 6 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)Transfer station does not receive special wastes. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training Comment (Required)Waste tires are not received at ths facility. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)No additional items. 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)No special permit requirements. General Comments Comments Facility in general was clean, organized, and had great communication. The tipping floor was kept clean for both waste inspections and transfer. DWMRC Inspector Signature Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 6 DWMRC Inspector Name Bryan Watt Date/Time 01-23-2025 Photos Attach Photos Date Submitted: 06-20-2025 10:52 AM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 6