Loading...
HomeMy WebLinkAboutDERR-2025-004687Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities CONTAINMENT SUMP INTEGRITY TESTING Facility Name:Gas N Dash APPENDIX C-4 Address:710 North Main St Address: City,State,Zip Code:Payson,UT,84631 City,State,Zip Code: Facility I.D.#:UT1000423 Phone #: Testing Company:Csesco Inc Phone #:bate:06/05/2025 This procedure is to test the leak integrity of containment sumps.See PEI/RP1200 Section 6.5 for the test method. Containment Sump ID PREM Containment SumpNiaterial POLYPLASTIC Liquid and debrisfarmovadifromSump ®W Yes [No Yes ONo OYes [No OYes [OONo OYes [ONo OYes [No Visual Inspection (No GRACAS,iHoRe Rafts Pass [Fail |OPass [Fail |OPass Fail |OPass [Fail |OPass Fail |Pass [Failorseparationofthe containment sump.) Containment Sump Depth 36 Height From Bottom to 6 Top of Highest Penetration Starting Water Level 10 Test Start Time 11:00AM Ending Water Level 10 Test End Time 12:00PM Test Period (Minimum test time:1 hour)Yes Water Level Change 0 Pass/fail criteria:Must pass visual inspection.Water level drop of less than 1/8 inch. Test Results MW Pass [JFail |Pass [Fail |OPass CIFail |CJPass [Fail |CJPass [Fail |Pass [Fail Comments: No repairs needed,no tightening needing.Proved containment held possible leak that happened and no release into ground. *All liquids and debris must be disposed of properly. Tester's Name (print Luke Kelso Tester's Signature 20