HomeMy WebLinkAboutDWQ-2025-001291Appendix E Permit # UGW350010
BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM OPERATIONAL MONITORING PLAN
MONITORING REQUIREMENTS AND PLAN CONTENT
Operational monitoring includes flow and quality sampling of meteoric and storm-water flow.
Kennecott Utah Copper LLC (Kennecott) has an existing general, operational, and groundwater monitoring plan that is described in the Ground Water Characterization and Monitoring Plan (GCMP) Kennecott, 2014.
This Operational Monitoring Plan for the Bingham Canyon Mine/Water Collection System includes
the Water Quality Sampling program.
WATER QUALITY MONITORING PROGRAM
Surface Water Sampling
Meteoric and Water Collection System - As a part of a continuing operational monitoring program,
water quality samples from all drainages associated with the water collection system will be collected two times per year. The Water Collection System concrete drainage structures will be sampled once in April or May and again in September or October. The Surface Water Sample Sites Drawing (Figure 1 of the Permit) shows the current locations of the 23 operational surface water
sample sites. There are 25 surface water sampling sites (refer to figure 454-T-0119).
Tunnels and Seeps - Additionally, quarterly flow and semiannual water quality samples will be
collected for each of the flows from mine tunnels that underlie the Bingham Canyon Mine Waste Rock Piles. Surface seeps will also be sampled for semiannual flow and water quality. Refer to Appendix A for additional permit conditions related to surface seeps.
Table E-1 lists all current monitoring sites for the operational monitoring program and E-2 lists new
and replaced cutoff walls installed during the EWRE.
Table E-3 lists the cutoff walls removed or moved during the SWRR project. The cutoff walls kept their designation descriptions.
Flow information for each surface water sample site will be provided in the annual report as part of
the operational monitoring discussion.
All sampling will be performed in compliance with the protocols and standard operating practices specified in the current approved version of the GCMP and attachments. The water quality date will
be provided in the annual report as part of the operational monitoring discussion.
Bluewater Repository - The leachate collection system sumps for the Bluewater Repository shall be
APRIL, 2020 OPERATIONAL MONITORING PLAN; APPENDIX E; KENNECOTT BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM PAGE 2
examined semi-annually. A semi-annual water quality sample will be collected of leachate flowing into each collection sump. Results from sampling will be reported in the annual operational
monitoring report provided to the Utah Division of Water Quality (DWQ). Refer to Appendix B for
additional permit conditions related to the repository.
MONITORING TECHNIQUES AND DATA VALIDATION All monitoring will be performed using the methods for sampling, analyses, and quality control
specified in the GCMP.
If data outliers or quality assurance/quality control problems are identified, the sample will be
retested, and the wells will be re-sampled within 30 days. If the results from the retesting or re-sampling show that the data is an outlier, normal monitoring will resume.
REPORTING
Kennecott will submit compliance groundwater monitoring data to the DWQ on a quarterly basis.
The reports will include a summary of all monitoring data collected during the quarter. Field measurements (groundwater levels, specific conductance, pH) and certificates of analysis will be provided.
Operational monitoring data for operational sites including cut-off walls, seeps, tunnels, Bluewater
Repository, informational wells and extraction wells will be submitted to the DWQ in an annual
report to be provided by March 31 each year. The annual report will contain results of monitoring in
a tabular form with descriptive statistics such as: number of samples, average, standard deviation, maximum and minimum values for each site. Each site will be described with time series graphs of significant parameters over the period of record for that site; with analytical data reported from the
past three years through the current reporting cycle A narrative description shall be included that
describes any significant trends or observations on the data.
APRIL, 2020 OPERATIONAL MONITORING PLAN; APPENDIX E; KENNECOTT BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM PAGE 3
Table E-1
OPERATIONAL SURFACE SITES NORTHING EASTING MONITORING FREQUENCY
WATER COLLECTION SYSTEM
Bingham Ck. Cut-off wall (ECP2562)
15784 16905 Semiannual water quality and quarterly volumetric flow
Bluewater 1/2
Collection Box
(ECP2682)
15145 13910 Semiannual water quality and
quarterly volumetric flow
Bluewater 1 Flume
(MDP2679)
14467 13613 Semiannual water quality and
quarterly volumetric flow
Bluewater 2 Flume (ECP2709)
12271 16656 Semiannual water quality and quarterly volumetric flow
Bluewater 3 Flume
(ECP2674)
11022 16182 Semiannual water quality and
quarterly volumetric flow
Midas 1 Flume
(ECP2670)
9391 15692 Semiannual water quality and
quarterly volumetric flow
Midas 2 Flume (ECP2668)
9189 15494 Semiannual water quality and quarterly volumetric flow
Midas Flume
(ECP2662)
8842 16582 Semiannual water quality and
quarterly volumetric flow
South Congor Flume
(ECP2654)
8840 16582 Semiannual water quality and
quarterly volumetric flow
Crapo Flume
(ECP2651)
6831 17037 Semiannual water quality and
quarterly volumetric flow
South Crapo Flume (ECP2858) 6670 17332 Semiannual water quality and quarterly volumetric flow
North Keystone Flume
(ECP2648)
6029 17716 Semiannual water quality and
quarterly volumetric flow
Keystone and Lost
Creek Flume (ECP2629)
3397 17201 Semiannual water quality and
quarterly volumetric flow
OPERATIONAL SURFACE SITES NORTHING EASTING MONITORING FREQUENCY
APRIL, 2020 OPERATIONAL MONITORING PLAN; APPENDIX E; KENNECOTT BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM PAGE 4
Copper 1 Flume
(ECP2624)
1457 17078 Semiannual water quality and
quarterly volumetric flow
Copper 2 Flume (ECP2857) 1205 17093 Semiannual water quality and quarterly volumetric flow
Copper 3 Flume
(ECP2618)
629 16596 Semiannual water quality and
quarterly volumetric flow
Copper 4 Flume
(ECP2856)
-326 16111 Semiannual water quality and
quarterly volumetric flow Yosemite Cut-off wall
(ECP2616)
-1302 12460 Semiannual water quality and
quarterly volumetric flow
Saints Rest Cut-off wall (ECP2614)
-2797 13156 Semiannual water quality and quarterly volumetric flow
S. Saints Rest Cut-off
wall (ECP2612)
-4318 13304 Semiannual water quality and
quarterly volumetric flow
Castro Flume
(ECP2606)
-5637 13598 Semiannual water quality and
quarterly volumetric flow
Butterfield 1 Cut-off wall (ECP2605)
-7876 9515 Semiannual water quality and quarterly volumetric flow
Olsen Cut-off wall
(ECP2603)
-8670 8481 Semiannual water quality and
quarterly volumetric flow
Queens Cut-off wall
(ECP2601)
-9483 6350 Semiannual water quality and
quarterly volumetric flow
TUNNELS
Old Bingham Tunnel
(ECP2664)
8990 16938 Semiannual water quality and
quarterly volumetric flow
Butterfield Tunnel (UPD010)
-10026 10313 Semiannual water quality and quarterly volumetric flow
Utah Metals Tunnel
(BMP2712)
-1255 -2563 Semiannual water quality and
quarterly volumetric flow
OPERATIONAL
SURFACE SITES
NORTHING EASTING MONITORING
FREQUENCY Mascotte Tunnel
(ECP2631)
3569 17231 Semiannual water quality and
quarterly volumetric flow
APRIL, 2020 OPERATIONAL MONITORING PLAN; APPENDIX E; KENNECOTT BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM PAGE 5
5490 Tunnel (ECP2710) 15715 14960 Semiannual water quality and
quarterly volumetric flow Bingham Tunnel (LWP2632)
3736 17773 Semiannual water quality and quarterly volumetric flow
SURFACE SEEPS
Butterfield 1 Seep (ECS2715) -7980 10500 Semiannual water quality and semiannual volumetric flow
Upper Keystone Seep
(ECS2716)
4220 15520 Semiannual water quality and
semiannual volumetric flow
Lower Keystone Seep (LWS2717) 3700 18600 Semiannual water quality and semiannual volumetric flow
Crapo Seep
(ECS2718)
6930 16130 Semiannual water quality and
semiannual volumetric flow
Upper Queen Seep
(ECS2786)
-7263 5097 Semiannual water quality and
semiannual volumetric flow
REPOSITORY
Bluewater 1 North
Sump (BRP292)
14146 16561 Semiannual water quality
Bluewater 1 Main Sump (BRP1476) 13770 15740 Semiannual water quality
Note: Coordinate system in Kennecott True North, See Permit Table 4 for Lat/Long Coordinates
TBD – the lat and long will change when the construction is complete. The permit will be modified
to reflect those changes.
APRIL, 2020 OPERATIONAL MONITORING PLAN; APPENDIX E; KENNECOTT BINGHAM CANYON MINE AND WATER COLLECTION SYSTEM PAGE 6
Table E-2
Original and New Cut-off Walls
Original Cut-off Wall (historic) New Cut-off Wall (relocated)
Copper
Copper 4
Copper 3
Copper 2
North Copper
Copper 1
Lark
Lost Creek Lost Creek
Keystone Keystone
North Keystone
North Keystone
South Crapo
Crapo Crapo
South Congor 2 South Congor
Congor 1 Congor 2 Midas
Table E-3 Original and New Cut-off Walls
Original Cut-off Wall (historic) New Cut-off Wall (relocated)
Yosemite
Upper Yosemite – Re-located
~500 feet down gradient of
existing Yosemite cut-off wall Lower Yosemite – Located ~850’ down gradient of Upper
Yosemite cut-off wall
Castro
Upper wall breached and
buried; lower Castro cut-off
wall will remain in place
Butterfield 1
Butterfield 1 – Located ~1500’ down gradient of existing cut-off wall
Olsen
Olsen – Located ~900’ down
gradient of existing cut-off
wall
DWQ-2020-015196