HomeMy WebLinkAboutDAQ-2024-007276FIIJEtrIR
NUCOR CORPORATION
NUCOR STEEL UTAH
MONITORING REPORT
TO: Executive Secretary, Utah Air Quality Board
FROM: Nucor Steel
T'TA}I DEPAHTMENT OF
E}WIRONMENTAL OUAJTY
MAR 1 4 ?A24
DIVISION OF AIB QUAUfi
RE:
DATE:
Monitoring Report for Permit # 300002004
March 10,2024
to 02-29-2024
-
In accordance with Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC) R307-415-
6a(3)(c)(i), the following monitoring report is submitted.
There were no deviations from permit requirernents.
Attached is a list of permit requirements for which there were deviations.
The list includes the information required by Operating Permit provision I.S.2.a,
UAC R3 07-a I s-6a(3)(c)(i).
In lieu of attaching the above list, deviation reports submitted in accordance with permit
provision I.S.2.c, and UAC R307-415-6a(3Xc)(ii) are referenced below.
Deviation report submitted on Feb. 19,2024 for deviation occrrrence on Feb. 6,2024.
Condition II.B.3.i : SOz emissions limit was exceeded for I hour, based on a 3 hour rolling
average.
In accordance with Operating Permit provision I.K. and UAC R307-4I5-5d, and based on information and
belief after reasonable inquiry, I certifu that the staternents and information in this document are true,
tr
tr
This report covers the period from 09-01-2023
For the indicated reporting period:
Source
Adam Zewe, V.P. . General Manager
Name and Title of Responsible Official
I|l[archl0.2024
Date
PO BOX 1OO PLYMOUTH, UTAH 84330 PHONE 435 458 2300 FAX 435 458 2309 WWW. N U CO R BAR. CO M
B-2-10008