Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2025-001608
299 South Main Street, Suite 1700 ▪ Salt Lake City, Utah 84111 (801) 649-2000 ▪ Fax: (801) 880-2879 ▪ www.energysolutions.com May 19, 2025 CD-2025-105 Mr. Doug Hansen, Director Utah Division of Waste Management and Radiation Control P.O. Box 144880 Salt Lake City, UT 84114-4880 Subject: Radioactive Material License UT 2300249 Phase 3E Liner Pre-Construction Schedule Dear Mr. Hansen, EnergySolutions herein submits the schedule for the construction of the Class A West Phase 3E Liner project. This request is submitted in accordance with Condition 18 of the LLRW and 11e.(2) Construction Quality Assurance/Quality Control (CQA/QC) Manual. EnergySolutions 2025 Phase 3E Liner Schedule (attached) is the construction schedule for the Phase 3E liner project. Phase 3E is scheduled to be completed by the contractor in 2025. The Phase 3E Liner Schedule also includes the construction of the collection lysimeter CL-C8. All construction will be performed in accordance with the CQA/QC Manual. With Director approval, EnergySolutions will convene a pre-construction meeting as required in Condition 18. Representatives of the Director will be invited to attend the pre-construction meeting on June 9 at 10:00 a.m. at the Clive Site. Should there be any questions, please contact me at 801-649-2157 or Garrett Dutson at 801-649-2156. Sincerely, Nick Clarke Compliance Specialist II enclosure Digitally signed by Nick Clarke DN: dc=com, dc=energysolutions, ou=North America, ou=Users, ou=CLUT, cn=Nick Clarke, email=nmclarke@energysolutions.com Date: 2025.05.19 10:19:30 -06'00' Energy Solutions / 2025 ES PH3E Liner Schedule Act ID Activity Description Orig Dur Rem Dur Early Start Early Finish % 02 JUN 2025 09 JUL 16 23 30 07 14 21 10 Total Calendar Days 30 *30 *09JUN25 09JUL25 0 20 Pre-Construction Meeting 0 0 09JUN25 * 0 30 Mobilization Project Support Equipment 2 2 09JUN25 10JUN25 0 40 Site Safety Training 1 1 11JUN25 11JUN25 0 50 Install Lysimeter Components 6 6 12JUN25 19JUN25 0 60 Clay Liner Load, Haul, Place, and Compact 11 11 17JUN25 01JUL25 0 70 Clay Liner Finish Grading 2 2 02JUL25 03JUL25 0 80 Berm Construction 2 2 07JUL25 08JUL25 0 90 Install Control Fence 2 2 08JUL25 09JUL25 0 100 Project Completed & Accepted 0 0 09JUL25 0 Total Calendar Days Pre-Construction Meeting Mobilization Project Support Equipment Site Safety Training Install Lysimeter Components Clay Liner Load, Haul, Place, and Compact Clay Liner Finish Grading Berm Construction Install Control Fence Project Completed & Accepted Early start point Early finish point Early bar Progress barCritical bar Summary bar Progress pointCritical pointSummary point Start milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 02MAY25 D.Cummings KC DC Start date 02JUN25 Finish date 09JUL25 Data date 02JUN25 Run date 02MAY25 Page number 1A © Primavera Systems, Inc. Energy Solutions / 2025 ES PH3E Liner Schedule 21 JUL 2025 28 AUG 04 SEP 11 OCT 18 25 01 08 15 22 29 06 13 20 Early start point Early finish point Early bar Progress barCritical bar Summary bar Progress pointCritical pointSummary point Start milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 02MAY25 D.Cummings KC DC Start date 02JUN25 Finish date 09JUL25 Data date 02JUN25 Run date 02MAY25 Page number 1B © Primavera Systems, Inc.