HomeMy WebLinkAboutDDW-2025-005275
June 11, 2025
Sent via Email Only
Keith Mogan, Public Works Director
Richfield City
PO Box 250
Richfield, Utah 84701
keith@richfieldcity.com
Subject:Plan Approval, CPF Culinary Water Improvements,
Richfield City, System #21013, File #21788
Dear Keith Mogan:The Division of Drinking Water (the Division) received the plans and specifications for the proposed CPF Culinary Water Improvement Project from your consultant, Kyler
Nielsen with Jones & DeMille Engineering, on May 22, 2025. This project has met the conditions for receiving a planapproval.
Our understanding of the project is that approximately 7,300 feet of new 8-inch diameter PVC piping will be installed to “loop” existing water lines on the south end of the distribution
system. This project includes boring under Interstate 70 and crossing under two different irrigation canals.
We have completed our review of the plans and specifications, stamped and signed by Parker Vercimak, P.E., dated June 4, 2025,and find they basically comply with the applicable portions
of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the CPF Culinary Water Improvementsare hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before the new distribution piping may be put in service. A checklist outlining the
items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted
to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact John Chartier, P.E., DEQ Central District Engineer, at (435) 559-1969, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JLC/mrn/mdbEnclosures –Operating Permit Checklistcc:Eric Larsen, Central Utah Public Health, elarsen@centralutahhealth.org Parker Vercimak, P.E., Jones & DeMille Engineering, parker.v@jonesanddemille.com
Keith Mogan, Richfield City, keith@richfieldcity.com John Chartier, P.E., DEQ Central District Engineer, jchartier@utah.gov jchartier 21013 21788 PA
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source