Loading...
HomeMy WebLinkAboutDERR-2025-004142Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name UTAH TRANSIT AUTHORITY Address 200 S 669 W SALT LAKE CITY, UT 84101 Contact UTAH TRANSIT AUTHORITY Phone Email mtaggart@rideuta.com TANK LOCATION Name UTA - CENTRAL DIVISION Address 610 W 200 S SALT LAKE CITY, UT 84104 A Operator MARK C. TAGGART Phone (801) 898-5856 B Operator SAME Phone SAME Facility ID: 4001132 Inspection Date: 04/09/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1 Gasoline Yes Steel Flex in Sump None None Yes No None None 2 - 2 Diesel Yes Steel Flex in Sump None None Yes No None None 3 - 3 Diesel Yes Steel Flex in Sump None None Yes No None None TANK DETAILS Tank ID/Alt ID 1 / T1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 6000 / West Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Incon TS-LS500 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeMonthlyLineTest CP Tank Test None CP Pipe Test None Tank ID/Alt ID 2 / T2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 15000 / West Center Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Incon TS-LS500 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeMonthlyLineTest CP Tank Test None CP Pipe Test None 2025-04-16 Page 1 of 10 Tank ID/Alt ID 3 / T3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 15000 / East Center Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Incon TS-LS500 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeMonthlyLineTest CP Tank Test None CP Pipe Test None Tank ID/Alt ID 4 / T4 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 15000 / East Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Incon TS-LS500 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeMonthlyLineTest CP Tank Test None CP Pipe Test None Tank ID/Alt ID 5 / T5 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 4000 / West Substance Stored New Oil / Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Secondary Containment Pipe type/STP Cont U.S. Suction / Yes STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeLineTightness CP Tank Test None CP Pipe Test None 2025-04-16 Page 2 of 10 Tank ID/Alt ID 6 / T6 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 4000 / Center Substance Stored Other / Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Secondary Containment Pipe type/STP Cont U.S. Suction / Yes STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 7 / T7 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 8, 1987 / 4000 / East Substance Stored New Oil / Tank Material- Mod Fiberglass Reinforced Plastic- None ATG INCON / TS-1000 with SCALD LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Secondary Containment Pipe type/STP Cont U.S. Suction / Yes STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Self-insurance Tank/Pipe Rel Det TankATG PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2025-04-16 Page 3 of 10 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes TANK RESPONSES Tank T1 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T1 ATG/IM Does the ATG system have a valid annual test?Yes Tank T1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2025-04-16 Page 4 of 10 Tank T2 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T2 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T2 ATG/IM Does the ATG system have a valid annual test?Yes Tank T3 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2025-04-16 Page 5 of 10 Tank T3 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T3 ATG/IM Does the ATG system have a valid annual test?Yes Tank T4 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T4 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T5 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T5 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Tank T5 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T6 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T6 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Tank T6 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T7 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T7 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Tank T7 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2025-04-16 Page 6 of 10 Tank T4 ATG/IM Does the ATG system have a valid annual test?Yes Tank T5 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T5 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T5 ATG/IM Does the ATG system have a valid annual test?Yes Tank T6 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes 2025-04-16 Page 7 of 10 Tank T6 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T6 ATG/IM Does the ATG system have a valid annual test?Yes Tank T7 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank T7 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes 2025-04-16 Page 8 of 10 Tank T7 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 3 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 7 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2025-04-16 Page 9 of 10 Prepared by fueloperator.com Inspection Information Inspector:Rasmussen, DeAnn Record Created:April 16, 2025, 2:42 p.m. Inspection Date:April 9, 2025 2025-04-16 Page 10 of 10