HomeMy WebLinkAboutDERR-2025-004142Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name UTAH TRANSIT AUTHORITY
Address 200 S 669 W
SALT LAKE CITY, UT 84101
Contact UTAH TRANSIT AUTHORITY
Phone
Email mtaggart@rideuta.com
TANK LOCATION
Name UTA - CENTRAL DIVISION
Address 610 W 200 S
SALT LAKE CITY, UT 84104
A Operator MARK C. TAGGART
Phone (801) 898-5856
B Operator SAME
Phone SAME
Facility ID: 4001132 Inspection Date: 04/09/2025
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1 Gasoline Yes Steel Flex in Sump None None Yes No None None
2 - 2 Diesel Yes Steel Flex in Sump None None Yes No None None
3 - 3 Diesel Yes Steel Flex in Sump None None Yes No None None
TANK DETAILS
Tank ID/Alt ID 1 / T1
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 6000 / West
Substance Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Incon TS-LS500
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeMonthlyLineTest
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / T2
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 15000 / West
Center
Substance Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Incon TS-LS500
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeMonthlyLineTest
CP Tank Test None
CP Pipe Test None
2025-04-16 Page 1 of 10
Tank ID/Alt ID 3 / T3
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 15000 / East
Center
Substance Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Incon TS-LS500
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeMonthlyLineTest
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / T4
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 15000 / East
Substance Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Incon TS-LS500
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeMonthlyLineTest
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 5 / T5
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 4000 / West
Substance Stored New Oil /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Secondary Containment
Pipe type/STP
Cont U.S. Suction / Yes
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
2025-04-16 Page 2 of 10
Tank ID/Alt ID 6 / T6
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 4000 / Center
Substance Stored Other /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Secondary Containment
Pipe type/STP
Cont U.S. Suction / Yes
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 7 / T7
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 8, 1987 / 4000 / East
Substance Stored New Oil /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000 with SCALD
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Secondary Containment
Pipe type/STP
Cont U.S. Suction / Yes
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2025-04-16 Page 3 of 10
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
TANK RESPONSES
Tank T1 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T1 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T1 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank T1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank T2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T2 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2025-04-16 Page 4 of 10
Tank T2 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T2 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T2 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T3 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank T3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T3 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank T3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank T4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T4 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank T4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2025-04-16 Page 5 of 10
Tank T3 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T3 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T4 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T4 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T5 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T5 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Tank T5 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank T6 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T6 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Tank T6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank T7 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank T7 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Tank T7 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2025-04-16 Page 6 of 10
Tank T4 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T5 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T5 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T5 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T6 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
2025-04-16 Page 7 of 10
Tank T6 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank T6 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank T7 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank T7 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
2025-04-16 Page 8 of 10
Tank T7 ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
Dispenser 2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 3
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 7 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2025-04-16 Page 9 of 10
Prepared by fueloperator.com
Inspection Information
Inspector:Rasmussen, DeAnn
Record Created:April 16, 2025, 2:42 p.m.
Inspection Date:April 9, 2025
2025-04-16 Page 10 of 10