Loading...
HomeMy WebLinkAboutDAQ-2025-002584 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. 800 346-3128 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Tim Davis Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-479-25 Site 12905 (B1) Quin Bingham Granite Construction Company 1000 North Warm Springs Road Salt Lake City, Utah 84116-2321 Dear Mr. Bingham: Re: Granite Construction Company – Temporary Relocation/Operation, Notice of Intent – Box Elder County Your Notice of Intent dated May 15, 2025, to relocate portable aggregate equipment to the temporary project for Granite Construction Company’s Wells and Wells South Aggregate facilities, located at 750 North State Route 89, Willard, Utah was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Astec VSI impact crusher track plant with Cat 440 hp/328 kW tier 4 diesel fueled engine Utah Administrative Rule R307-209 authorizes portable equipment for temporary projects. This equipment will be used by Granite Construction Company which will be responsible for the operating conditions and emission reporting requirements for this project. The above relocation address is a permitted aggregate facility with established production limits. All equipment operating at this site must be in accordance with the current AO for this site DAQE-AN129050012-24 dated March 15, 2024. The production of aggregate and hours of operation from all temporary projects when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Conditions II.B.1.a of this AO. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. 6 Û Ú Û Ù Û Þ DAQC-479-25 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted temporary relocation form Email correspondence Equipment specifications cc: Bear River Health Department 4 * - - $ . — 4 A ? v A ? A D @ D w @ H ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Wed, May 14, 2025 at 3:44 PM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Granite Construction Company has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2025-05-14 15:43:58 MDT IP: 161.69.91.46 ResponseID: R_5m3k5aRuKUUxgqd Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/HREzrO6JfpyYXCzV-4_ SA0V3WTR90n8W3jXvgvFe-Jk2175gI2Ze7fCom0P-KsR-q1TqYKZsjh0-LwoKYMGAnziJ9NFkbv3bp35co9xvHx HeHuwkNH2_oGdI7941T8V4BuZxXvROCDc63en-AS1YVhnjEUrc39-UwgAg5AJO_zlmxtrUF7GkzRfOyRUzjr93x6ESoRF -PvMh7Ysly1Ko5eke7FpfPhPc0Iu0Gi-5BqfvgOVRth4sg74FdAref4nT3r986Rjr1QJzJqlij9MabhYTe-_h8QEP_JhC_Og2Eq- 2vB2tR_iMN6FJsW62tGRH-WUH3nGYfOTQ8LH9c74wqA Response Summary: Please fill out the information below: Contact Person: Quin Bingham Company Name: Granite Construction Company Mailing Address: 1000 N Warm Springs Road City: Salt Lake City Zip: 84116 Phone Number: 4357704319 Email: quin.bingham@gcinc.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 322df723-c873-4a9e-87f9-30d7af57d2ab Briefly give directions to the site and/or physical address: 1000 N Warm Springs Road Proposed Relocation Information: Closest City Willard County Box Elder UTM X Coordinates 41.416268 UTM Y Coordinates -112.026084 Approximate distance to the nearest house/business 2071 feet UTM X Coordinates to nearest house/business 41.414035 UTM Y Coordinates to nearest house/business -112.033132 Does this site currently have a permit with DAQ? Yes 5/19/25, 10:30 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1832133900323580918%7Cmsg-f:1832133900323580918&s…1/2 If yes, what is the Permit (DAQ-AN) # ? DAQE-AN129050012-24 If yes, what is the Permit Holder's Name? Granite Construction Company Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN129050012-24 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Crusher Track Plant Make/Model Astec FT2500 Design Capacity 350 TPH Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_NWM009ceo9ovUhH Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 0600 Ending time of operation (am/pm) 2200 Maximum hourly production rate for project 350 TPH Expected startup date 05/19/2025 Expected completion date 05/19/2026 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1QL3icdN4q0Etg9 Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_12JhqeG1Ir2ni4W 5/19/25, 10:30 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1832133900323580918%7Cmsg-f:1832133900323580918&s…2/2 Susan Weisenberg <sweisenberg@utah.gov> mobile-vsi-crusher-plant-ft2500-spec-sheet-english.pdf 1 message Bingham, Quin <Quin.Bingham@gcinc.com>Mon, May 19, 2025 at 10:26 AM To: "Susan Weisenberg (sweisenberg@utah.gov)" <sweisenberg@utah.gov> Hey Susan, Here is the spec sheet your requested with power and control specs (Tier 4 final; 440hp). Also, this particular Temp Relocation Permit application is for a different piece of equipment than that of the October 2024 temp relocate permit. This particular piece of equipment is used to create a specific type of sand. Thanks, Quin mobile-vsi-crusher-plant-ft2500-spec-sheet-english.pdf 347K 5/19/25, 10:31 AM State of Utah Mail - mobile-vsi-crusher-plant-ft2500-spec-sheet-english.pdf https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1832566912814278000%7Cmsg-f:1832566912814278000&s…1/1 FT2500 Mobile VSI Plant Belt Feeder - 42” (863mm) x 17’ (5.2m) belt feeder - 3.0 cubic yard hopper - Hydraulically folds for transport Impact Crusher - VSI - Available in; hard/standard, semi autogenous, and autogenous internal configurations - Hydraulically variable speed 700 to 1,400RPM - Self-contained low pressure bearing oil lube system, grease lubricated pedestal seals - Fully replaceable liners Under Crusher Conveyor - 48” (1,016mm) fixed height with full spill boards - Impact bed, 360PIW, endless belting - Easily removed for maintenance Chassis - Sculpted frame design - 24” (600mm) tracks with dual drive - Track length 12’ 6” (3.6m) - Balanced for zero cribbing - Dust suppression with manifold Power and Controls - CAT C13 440hp/328kw Tier 4 Final - 180gal (680L) fuel tank - 200gal (575L) oil reservoir - Radio remote/tether control system - OPS 7 with push button or touchscreen - Crusher CSS adjusted safely at control panel - Real time system monitoring display Note: Consult factory for exact dimensions, specifications are subject to change without notice.www.astecindustries.com Dimension Standard Metric Operating Length 52’15.9m Operating Width 12’ 10”4m Travel Length 56’ 7”17.3m Travel Width 11’ 1”3.4m Operating Height 13’ 9”4.2m Feed Height 9’ 5”2.9m Travel Height 11’ 4”3.5m Direct Crusher Feed 11 ’3.4m Physical/Operating CharacteristicsOptions - Hydra arm lid removal system with power lift and manual rotate - Internal VSI options including; table, rotor, cluster rings, hybrid rock shelf for specific applications - VSI lube oil tank heater (for operation below freezing) - Lighting package mounted on engine housing - Belt scale for under crusher conveyor - Extended under crusher conveyor with 12’ 2” (3.7m) discharge and hydraulic fold - 24” cleated return conveyor - Hydraulic fold return chute for off plant return - CAT C13 440hp Tier III vs. Tier IV (international) - Engine enclosure filter kit Rev. 5/21