Loading...
HomeMy WebLinkAboutDAQ-2025-002581 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. 800 346-3128 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Tim Davis Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-466-25 Site 11042 (B1) Site 13140 (B1) Grant Ensign Geneva Rock Products, Inc. 730 North 1500 West Orem, Utah 84057 Dear Mr. Ensign: Re: Geneva Rock Products, Inc. – Temporary Relocation/Operation, Notice of Intent – Utah County Your Notice of Intent dated April 18, 2025, to relocate portable concrete batch plant equipment to the temporary project for Geneva Rock Products’ Payson Concrete Batch Plant located at 1600 North Main Street, Payson, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Cemco 125 cubic yard per hour mobile concrete batch plant Wisperwatt 70 KVA diesel generator The State of Utah has permitted portable equipment for Geneva Rock Products on the Approval Order (AO) DAQE-AN110420003-21 dated March 17, 2021. This location is a permanent permitted facility with established production limits. All equipment operating at this site must be in accordance with the current AO DAQE-AN131400004-18 dated January 31, 2018. The total production of concrete from all temporary projects when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.c of this AO. As per Condition II.B.3.c of your portable equipment AO, the equipment shall operate only between 6:00 am and 10:00 pm each day. The hours of operation may be altered upon approval of the director; however, any request for a change in these hours shall include modeling showing that all National Ambient Air Quality Standards (NAAQS) are met. 6 Û Ù Û Ù Û Þ DAQC-466-25 Page 2 Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. Approval is subject to the conditions of the dust control plan submitted for this location and the applicable conditions of the above referenced portable AO. Hours of operation shall be held to 16 hours each day. The maximum production rate shall be held to the requested 125 cubic yards per hour. The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to https://secure.utah.gov/deq-dashboard/index.html for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Utah County Health Department 4 * - - $ . — 4 @ H v A ? A D ? H w D B ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Fri, Apr 18, 2025 at 2:31 PM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Geneva Rock Products has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2025-04-18 14:31:30 MDT IP: 205.197.217.202 ResponseID: R_1EFLMKeYvfCR3K0 Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/ cMYu2wzCkmN6xaTtULVLwSxnNKpRUH71tENun0BUhvPATSOWK7DE9B6mWL0j mdxSo62DCYGw9VK35ZhypWHo7Rb3pr0ab7GP3BmPNkoR0ttthGJ_5flsqfpyPEsY3DaHOEobZd0ZdF9yIt cT1aRpzJmw1RA-Jhgl0rliheE83ZAGIDxXOLBhwHQ9ovbv40HvBsnq2S9o224HfZPTI448tML8EH_ adMEQn8ih6kEKw2pm1gv7qKZCv0kUcesZrnDEDYCkhiwo2jHQXQQLxT3-InNrpCmokYiKv6tldgDXbpkcXurkUV JLNJ6XWWcgfVJSNs1Z9hgE-o4QjZ82Fk-47A Response Summary: Please fill out the information below: Contact Person: Grant Ensign Company Name: Geneva Rock Products Mailing Address: 730 N 1500 West City: Orem Zip: 84057 Phone Number: 8018026954 Email: gensign@clydeinc.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 10519 Briefly give directions to the site and/or physical address: 1325 N. Main Street, Payson, UT Proposed Relocation Information: Closest City Payson County Utah UTM X Coordinates 40.061428 UTM Y Coordinates -111.733420 Approximate distance to the nearest house/business 400 feet UTM X Coordinates to nearest house/business 40.061465 UTM Y Coordinates to nearest house/business -111.731884 Does this site currently have a permit with DAQ? 4/21/25, 10:47 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1829773817950858797%7Cmsg-f:1829773817950858797&s…1/2 Yes If yes, what is the Permit (DAQ-AN) # ? DAQE-AN131400004-18 If yes, what is the Permit Holder's Name? Geneva Rock Products, Inc. Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN110420003-21 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Mobile Concrete Batch Plant Make/Model Cemco 220 Design Capacity 125 CY/hr 2 Equipment Type Diesel Generator Make/Model Wisperwatt 70KVA Serial or ID# 7359212 Manufactured Date 2024 3 Equipment Type Associated conveyors/belts Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 24 Starting time of operation (am/pm) 12 AM Ending time of operation (am/pm) 12 AM Maximum hourly production rate for project 125 CY/hr Expected startup date 05/01/2025 Expected completion date 05/01/2026 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1FLoXFqWXmpOHkQ Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_32Sev348aP9KaZe 4/21/25, 10:47 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1829773817950858797%7Cmsg-f:1829773817950858797&s…2/2 Susan Weisenberg <sweisenberg@utah.gov> TRP: Geneva Rock - Payson: Concrete Batch Plant 1 message Grant Ensign <gensign@clydeinc.com>Wed, May 14, 2025 at 10:20 AM To: Susan Weisenberg <sweisenberg@utah.gov> Hi Susan, A few weeks ago, I submied a TRP for a mobile concrete batch plant for Geneva Rock in Payson, UT. This is the project we're hoping to get approved for 24-hour operaon. We’re currently modeling the plant to determine whether it exceeds the Significant Impact Level (SIL), but it will likely take a few more weeks to finalize. In the meanme, would you be able to issue the TRP with the standard restricted operang hours of 6:00 AM to 10:00 PM? This would allow us to begin producon while we complete the modeling. Once we’re able to demonstrate that the plant is below the SIL, we’ll submit a request for 24-hour operaon. Thanks so much! Grant Ensign ENVIRONMENTAL ENGINEER O (801) 802-6954  C (801) 633-7830 WWW.CLYDEINC.COM 5/14/25, 11:17 AM State of Utah Mail - TRP: Geneva Rock - Payson: Concrete Batch Plant https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1832113514768570369%7Cmsg-f:1832113514768570369&s…1/1