Loading...
HomeMy WebLinkAboutDERR-2024-005716APPENDIX C-9 MECHANICAL AND ELECTRONIC LINE LEAK DETECTORS PERFORMANCE TEST owner: Maverik Inc. Address: 185 S. State St. STE 800 City, State, Zip Code:Salt Lake City, UT 84111 Phone#: Facility Name:Maverik #517 Address: 24 S. Geneva Rd. City, State, Zip Code: Vineyard, UT 84058 Facility I.D. #: 1000931 Testing Company: Precision Testing Technologies Inc. Phone #: 801-886-9224 Date: 01/22/2024 This data sheet can be used to test mechanical line leak detectors (MLLD) and electronic line leak detectors (ELLO) with submersible turbine pump (STP) systems. See PEI/RP1200, Sections 9.1 and 9.2 for test procedures. Line Number 1 2 3 4 Product Stored ReQ Prm Clear Dsl Leak Detector Manufacturer VR VR VR VR Leak Detector Model PLLD PLLD PLLD PLLD Ty pe of Leak Detector CJ MLLD CJ MLLD CJ MLLD CJ MLLD CJ MLLD CJ MLLD El ELLO El ELLO El ELLO El ELLO □ELLO □ELLO MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) STP Full Operating Pressure Check Valve Holding Pressure Line Resiliency (ml) (line bleed back vol- ume as measured from check valve hold- ing pressure to zero psig) Step Through Time in Seconds (time the MLLD hesitates at metering pressure before going to full operating pressure as measured from O psig with no leak induced on the line) Metering Pressure (STP pressure when simulated leak rate 3 gph at 10 psig) Opening Time in Seconds (the time the MLLD opens to allow full pressure after simulated leak is stopped) Does the STP pressure remain at or below the metering pressure for at least □Yes CJ No □Yes CJ No □Yes CJ No □Yes CJ No □Yes CJ No □Yes □No60 seconds when the simulated leak is induced? Does the leak detector reset (trip) when □Yes □No □Yes □ No □Yes CJ No □Yes □No □Yes □No □Yes □Nothe line pressure is bled off to zero psig? Does the STP properly cycle on/off under □Yes □No □Yes □No □Yes □No □Yes □No □Yes □No □Yes □Nonormal fuel system operation conditions? A "No" answer to either of the above questions indicates the MLLD fails the test. ELLO (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) STP Full Operating Pressure 36 34 33 36 How many test cycles are observed 2 2 2 2 before alarm/shutdown occurs? Does the simulated leak cause an alarm? El Yes □No El Yes □No El Yes □No El Yes □No □Yes □No □Yes □No A "No" answer to the above question indi- cates the ELLO fails the test. Does the simulated leak cause an STP Elves □No El Yes CJ No El Yes CJ No EIYes □No □Yes □No □Yes □No shutdown? □NA □NA □NA □NA □NA □NA Test Results El Pass □ Fail El Pass CJ Fail El Pass □ Fail El Pass □ Fail □Pass □ Fail □Pass □ Fail Comments: Tester's Name Dominic Salas UT-378 Tester's Signature __ l?_&-_mauc-__ • _· _S_�----