Loading...
HomeMy WebLinkAboutDDW-2025-004923Danielle Zebelean <dzebelean@utah.gov> IPP - Potable Water Plan Approval 1 message Logan.Green <Logan.Green@kiewit.com>Thu, Oct 19, 2023 at 12:30 PM To: "dzebelean@utah.gov" <dzebelean@utah.gov>, "jchartier@utah.gov" <jchartier@utah.gov> Cc: "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Amanda.Sobek" <Amanda.Sobek@kiewit.com> Danielle and John, This is in reference to attached Plan Approval. It has come to our attention regarding a sanitary line size change required for the IPP Renewed facility. The originally- sized sanitary lines (6”) have already been already installed underground and backfilled. As Kiewit has evaluated the revised line sizing (3”) and routing, the desired path forward is to abandon-in-place these already installed lines (but not before disconnecting them from their respective source/destination at either end to preclude sanitary waste from entering the pipe) and install new sanitary lines. With this design, there will be a portion where the sanitary line is routed above potable water pipe in a crossing instance. Kiewit has reviewed Utah Administrative Rule R309-550-7 where it offers guidance on protection of potable water lines routed beneath sanitary lines, but in this design instance the sanitary pipe would cross above the potable water pipe. Kiewit would like to review for acceptance the following proposed design for the instances in which the new underground sanitary line is routed above the previously installed potable line. Proposal: In the instances where a sanitary line is routed above the previously installed potable water line, Kiewit would install a 6” PVC sleeve over the 3” sanitary pipe (HDPE SDR 11) which shall extent no less than 10 feet beyond either side of the point of crossing. Our preference would be to use a PVC sleeve for the installation for these lines, with a secondary option being a 6” HDPE SDR 21 sleeve. The sanitary line will be a pressurized pipe as it is being pumped from a lift station and the potable water pipe is a pressurized line from the facility booster pump. This is a high priority to review and discuss in order to minimize the construction impacts. If you have any direct questions, please let Paul Novogoratz or myself know. Additionally, Kiewit would be available for a call this week or early next week to answer any questions. I have attached the instances where this revised sanitary routing would be required to be routed over an existing installed potable water line as well as a diagram of the 10ft sleeve extending in each direction from where a sanitary and potable water cross would occur. Thank you, LOGAN GREEN Process Engineer, Water 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Water Plan Approval https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1780209694244048465&simpl=msg-f:1780209694244048465 1/2 KIEWIT ENGINEERING GROUP INC. 8900 Renner Blvd, Lenexa, KS 66219 Mailstop: K4.2.C.06 913-928-7355 direct www.kiewit.com 2 attachments DDW-2023-008445.pdf 282K IPP Sanitary and Potable Routing.pdf 1346K 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Water Plan Approval https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1780209694244048465&simpl=msg-f:1780209694244048465 2/2 Danielle Zebelean <dzebelean@utah.gov> IPP - Potable Operating Permit Question 6 messages Logan.Green <Logan.Green@kiewit.com>Fri, Apr 5, 2024 at 10:21 AM To: "jchartier@utah.gov" <jchartier@utah.gov>, "dzebelean@utah.gov" <dzebelean@utah.gov> Cc: "lucas.davis" <lucas.davis@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com> John or Dani, For the Certification of Rule Conformance (checklist item #1) for the Potable Water Operating Permit, can you confirm if the Utah DDW has a preferred form for Kiewit to fill out, or if it is typical to just use a standard company letter head for this Certification of Rule Conformance? Thank you, LOGAN GREEN Process Engineer, Water KIEWIT ENGINEERING GROUP INC. 8900 Renner Blvd, Lenexa, KS 66219 Mailstop: K4.2.C.06 913-928-7355 direct www.kiewit.com Danielle Zebelean <dzebelean@utah.gov>Mon, Apr 8, 2024 at 7:15 AM To: "Logan.Green" <Logan.Green@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "lucas.davis" <lucas.davis@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com> Hi Logan, We do not have a form and you are correct that it is typically a standard company letterhead. It's preferred that any major redlines to the project after plan approval was received are called out in the letter. Please also note the four sets of water quality data that is required as well with the operating permit. Further, I would like to conduct a final inspection of the facility before issuing an operating permit. John will probably also like to join. If you are at the point where a final inspection is possible let us know and we can start coordinating. 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Operating Permit Question https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1795512427750551710&simpl=msg-f:179551242775055171…1/5 Please let me know if you have any questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Logan.Green <Logan.Green@kiewit.com>Thu, Apr 11, 2024 at 10:22 AM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "lucas.davis" <lucas.davis@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts- PTR@ticus.com> Dani, Construction is still on-going, so I would recommend potentially mid/end-May is realistic for the final inspection walkdown for the potable water treatment process. Over the next month our team will continue to stay in touch as it gets closer to submitting the paperwork for the Operating Permit. The on-site contacts will be Brittany James (brittany.james@kiewit.com) and Lance Batts (lance.batts-ptr@ticus.com). Lance will be the primary contact for the onsite final inspection while Brittany will be the primary contact who will be submitting the formal documentation for the Operating Permit. Regarding your note the four sets of water quality samples, can you confirm your expectation on this? Is it the same potable sample location taken four different days, or are you expecting the same day but four different locations at the facility? Thank you, LOGAN GREEN 913-928-7355 direct From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, April 8, 2024 8:15 AM To: Logan.Green <Logan.Green@kiewit.com> Cc: jchartier@utah.gov; lucas.davis <lucas.davis@kiewit.com>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com> Subject: [External]Re: IPP - Potable Operating Permit Question Hi Logan, 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Operating Permit Question https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1795512427750551710&simpl=msg-f:179551242775055171…2/5 We do not have a form and you are correct that it is typically a standard company letterhead. It's preferred that any major redlines to the project after plan approval was received are called out in the letter. Please also note the four sets of water quality data that is required as well with the operating permit. Further, I would like to conduct a final inspection of the facility before issuing an operating permit. John will probably also like to join. If you are at the point where a final inspection is possible let us know and we can start coordinating. Please let me know if you have any questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Thu, Apr 11, 2024 at 10:45 AM To: "Logan.Green" <Logan.Green@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "lucas.davis" <lucas.davis@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts- PTR@ticus.com> Hi Logan, For the four sets here is the language that was included in the operating permit checklist at the very end of the plan approval letter: Four sets of raw and treated water samples will be analyzed for arsenic, pH. Additionally, the chlorine residual of the treated water will be measured. Each of the sets will be collected on separate calendar days. And sounds good. I will look for future emails. 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Operating Permit Question https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1795512427750551710&simpl=msg-f:179551242775055171…3/5 Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Paul.Novogoratz <Paul.Novogoratz@kiewit.com>Mon, May 13, 2024 at 9:11 AM To: Danielle Zebelean <dzebelean@utah.gov>, "Logan.Green" <Logan.Green@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "lucas.davis" <lucas.davis@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com> Hi, Dani; Would you mind performing a quick sanity check for the attached draft for the Certification of Rule Conformance? Is this generally what the DDW is expecting? Thanks, Paul PAUL NOVOGORATZ, P.E. Mechanical Engineer KIEWIT ENGINEERING GROUP INC. 8880 Penrose Lane., Lenexa, KS 66219 913-928-7000 Ext. 7443 [Quoted text hidden] Potable Water -Certification of Rule Conformance.docx 35K 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Operating Permit Question https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1795512427750551710&simpl=msg-f:179551242775055171…4/5 Danielle Zebelean <dzebelean@utah.gov>Tue, May 14, 2024 at 1:31 PM To: "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com> Cc: "Logan.Green" <Logan.Green@kiewit.com>, "jchartier@utah.gov" <jchartier@utah.gov>, "lucas.davis" <lucas.davis@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts- PTR@ticus.com> Hi Paul, Yes that is sufficient for the certification of rule conformance. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:53 AM State of Utah Mail - IPP - Potable Operating Permit Question https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1795512427750551710&simpl=msg-f:179551242775055171…5/5 Danielle Zebelean <dzebelean@utah.gov> IPP Renewed Potable Water System 17 messages Harrison.Stinson <Harrison.Stinson@kiewit.com>Wed, Jul 17, 2024 at 11:28 AM To: "dzebelean@utah.gov" <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> Dani, I'm currently on site at IPP Renewed in Delta, Utah, and will be your primary point of contact for the Potable Water Operang Permit. I wanted to provide you with an update on the scheduled flushing dates. See below with what we have currently planned: Initial flushing - 8.26 Chlorination flush - 9.2 Prior to issuing the permit, would you like to conduct a final inspecon of the facility? If so, please let me know when you prefer to conduct the inspecon before the chlorinaon flush. I will be in touch as the September 2nd date approaches with any further updates. If you have any quesons or concerns, please do not hesitate to reach out. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com Danielle Zebelean <dzebelean@utah.gov>Thu, Jul 18, 2024 at 6:44 AM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> Hi Harrison, 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…1/23 Thank you for the update. I would like to come conduct a final inspection on the facility. Right now I have availability August 12, 13, 19, 20, 21, and 22. I would be able to make it to the plant around 11 am or later any of those days. Do you have a timeframe for collecting the raw and finished water samples for the operating permit request? Will that be after the chlorination flush? Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Harrison.Stinson <Harrison.Stinson@kiewit.com>Fri, Jul 26, 2024 at 11:19 AM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> Danielle, Sorry for just now geng back to you. Aer geng with my team, we can have you on site 8.22, 1pm would be the preferable me. For the water samples, we planned on collecng the samples aer the chlorinaon flush to then send to the lab for tesng. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Thursday, July 18, 2024 6:44 AM 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…2/23 To: Harrison.Snson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; Briany.James <Brittany.James@kiewit.com> Subject: [External]Re: IPP Renewed Potable Water System [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Mon, Jul 29, 2024 at 3:53 PM To: John Chartier <jchartier@utah.gov> Does Aug 22 around 1 pm work for you? Would you like to come on the final inspection? Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] John Chartier <jchartier@utah.gov>Mon, Jul 29, 2024 at 4:11 PM To: Danielle Zebelean <dzebelean@utah.gov> I am interested in seeing the final product there, and that day and time should work for me. I'll plan on it, if you don't mind me tagging along. Thanks! John L. Chartier, P.E. Central District Engineer| DEQ M: (435) 559-1969 P: (435) 896-5451 ext. 314 70 Westview Drive Richfield, UT 84701 deq.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Mon, Jul 29, 2024 at 4:15 PM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…3/23 Great! Thank you Harrison! I've added this to my calendar. Our district engineer, John Chartier, is also planning on coming. I've also notified the Central Utah Health Department if they would like to join. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Harrison.Stinson <Harrison.Stinson@kiewit.com>Mon, Aug 19, 2024 at 8:49 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> Dani, As we prepare for your visit this week, is there anything specific you want out of this system walk or anything you want prepared prior to your visit? Iso's, P&ID's, etc. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, July 29, 2024 4:15 PM To: Harrison.Snson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…4/23 Briany.James <Brittany.James@kiewit.com> Subject: Re: [External]Re: IPP Renewed Potable Water System [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Tue, Aug 20, 2024 at 9:00 AM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com> Hi Harrison, I will be focusing on the new treatment plant and storage tank to verify they will pass a Sanitary Survey Inspection. I've attached the question set below. Not everything will be applicable since some questions are about ongoing operation and maintenance. Please let me know if you have any further questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 13356 Questions.pdf 142K Harrison.Stinson <Harrison.Stinson@kiewit.com>Tue, Aug 20, 2024 at 1:26 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com> Dani, Following up on our phone call. We will be best prepared to have you and John on site the week of Sept. 30th to conduct a final walkdown of the system. I will keep you posted if anything changes. Best, 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…5/23 Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Tuesday, August 20, 2024 9:00 AM To: Harrison.Snson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; Briany.James <Brittany.James@kiewit.com> [Quoted text hidden] [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Tue, Aug 20, 2024 at 1:28 PM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com> Great! I have availability September 30 to October 2. I can plan on October 1 around 1 pm? Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Wed, Sep 25, 2024 at 11:50 AM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Hi Harrison, 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…6/23 Following up on this thread. I still have it on my calendar that potentially October 1 I would be coming down for the final inspection. Is the project still on track for that? Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Harrison.Stinson <Harrison.Stinson@kiewit.com>Wed, Sep 25, 2024 at 1:10 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, "Kylie.Alejos" <Kylie.Alejos@ticus.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Dani, Thanks for taking my call. As discussed, today is my last day on IPP and Kylie Alejos, cc'd, will be your new point of contact for site related items. October 1st will be somewhat early as we want to let you walk down the system as close to compleon as possible. We are holding October 14th for the chlorinaon flush, so the week of October 7th would be best for you to walk the system. You menoned having previous commitments on the 7th and 8th so Kylie will work with you on the exact date of your walk. Please direct any further quesons to Kylie. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…7/23 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Wednesday, September 25, 2024 11:50 AM To: Harrison.Snson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; Briany.James <Brittany.James@kiewit.com>; Don.Smith-PTR <Don.Smith@ipsc.com>; Andrew.Dutson-PTR <Andrew.Dutson@ipsc.com>; David Heaton <dheaton@centralutahhealth.org>; Eric Larsen <elarsen@centralutahhealth.org> [Quoted text hidden] [Quoted text hidden] Kylie.Alejos <Kylie.Alejos@ticus.com>Wed, Sep 25, 2024 at 1:11 PM To: "Harrison.Stinson" <Harrison.Stinson@kiewit.com>, Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Dani, Are you able to come out to site 10/9 or 10/10? Kylie Alejos 269-235-0206 From: Harrison.Stinson <Harrison.Stinson@kiewit.com> Sent: Wednesday, September 25, 2024 1:10 PM To: Danielle Zebelean <dzebelean@utah.gov> [Quoted text hidden] [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Wed, Sep 25, 2024 at 2:07 PM To: "Kylie.Alejos" <Kylie.Alejos@ticus.com> Cc: "Harrison.Stinson" <Harrison.Stinson@kiewit.com>, "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Hi Kylie, I can make it down 10/9 or 10/10 in the afternoon around 3:30pm, I have meetings in the morning both days. 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…8/23 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Kylie.Alejos <Kylie.Alejos@ticus.com>Wed, Sep 25, 2024 at 2:18 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "Harrison.Stinson" <Harrison.Stinson@kiewit.com>, "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org>, "Natalee.Brake" <Natalee.Brake@ticus.com> Dani – 10/10 sounds great. Either myself, or our Field Engineer Natalee Brake will walk with you. Thanks, Kylie Alejos 269-235-0206 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Wednesday, September 25, 2024 2:07 PM To: Kylie.Alejos <Kylie.Alejos@ticus.com> Cc: Harrison.Stinson <Harrison.Stinson@kiewit.com>; jchartier@utah.gov; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com>; Don.Smith-PTR <Don.Smith@ipsc.com>; Andrew.Dutson-PTR <Andrew.Dutson@ipsc.com>; David Heaton <dheaton@centralutahhealth.org>; Eric Larsen <elarsen@centralutahhealth.org> Subject: Re: [External]Re: IPP Renewed Potable Water System Hi Kylie, I can make it down 10/9 or 10/10 in the afternoon around 3:30pm, I have meetings in the morning both days. 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:18048481438407989…9/23 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…10/23 On Tue, Aug 20, 2024 at 1:28 PM Danielle Zebelean <dzebelean@utah.gov> wrote: Great! I have availability September 30 to October 2. I can plan on October 1 around 1 pm? Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Aug 20, 2024 at 1:26 PM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Dani, Following up on our phone call. We will be best prepared to have you and John on site the week of Sept. 30th to conduct a final walkdown of the system. I will keep you posted if anything changes. Best, 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…11/23 Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Tuesday, August 20, 2024 9:00 AM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier- PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: Re: [External]Re: IPP Renewed Potable Water System Hi Harrison, I will be focusing on the new treatment plant and storage tank to verify they will pass a Sanitary Survey Inspection. I've attached the question set below. Not everything will be applicable since some questions are about ongoing operation and maintenance. Please let me know if you have any further questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…12/23 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Mon, Aug 19, 2024 at 8:49 PM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Dani, As we prepare for your visit this week, is there anything specific you want out of this system walk or anything you want prepared prior to your visit? Iso's, P&ID's, etc. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, July 29, 2024 4:15 PM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: Re: [External]Re: IPP Renewed Potable Water System Great! Thank you Harrison! I've added this to my calendar. Our district engineer, John Chartier, is also planning on coming. I've also notified the Central Utah Health Department if they would like to join. Thanks! 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…13/23 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Fri, Jul 26, 2024 at 11:19 AM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Danielle, Sorry for just now getting back to you. After getting with my team, we can have you on site 8.22, 1pm would be the preferable time. For the water samples, we planned on collecting the samples after the chlorination flush to then send to the lab for testing. Best, Harrison Stinson 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…14/23 Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Thursday, July 18, 2024 6:44 AM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts- PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: [External]Re: IPP Renewed Potable Water System Hi Harrison, Thank you for the update. I would like to come conduct a final inspection on the facility. Right now I have availability August 12, 13, 19, 20, 21, and 22. I would be able to make it to the plant around 11 am or later any of those days. Do you have a timeframe for collecting the raw and finished water samples for the operating permit request? Will that be after the chlorination flush? Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…15/23 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Kylie.Alejos <Kylie.Alejos@ticus.com>Tue, Oct 8, 2024 at 1:43 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Hello Dani, Can you please give me a call when you have a chance? I have a few questions I would like to ask you before your visit Thursday. I left you a voicemail this morning. Kylie Alejos 269-235-0206 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Wednesday, September 25, 2024 2:07 PM To: Kylie.Alejos <Kylie.Alejos@ticus.com> Cc: Harrison.Stinson <Harrison.Stinson@kiewit.com>; jchartier@utah.gov; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com>; Don.Smith-PTR <Don.Smith@ipsc.com>; Andrew.Dutson-PTR <Andrew.Dutson@ipsc.com>; David Heaton <dheaton@centralutahhealth.org>; Eric Larsen <elarsen@centralutahhealth.org> Subject: Re: [External]Re: IPP Renewed Potable Water System Hi Kylie, I can make it down 10/9 or 10/10 in the afternoon around 3:30pm, I have meetings in the morning both days. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…16/23 drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Aug 20, 2024 at 1:28 PM Danielle Zebelean <dzebelean@utah.gov> wrote: Great! I have availability September 30 to October 2. I can plan on October 1 around 1 pm? 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…17/23 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Tue, Aug 20, 2024 at 1:26 PM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Dani, Following up on our phone call. We will be best prepared to have you and John on site the week of Sept. 30th to conduct a final walkdown of the system. I will keep you posted if anything changes. Best, Harrison Stinson Start Up Lead Field Engineer 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…18/23 TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Tuesday, August 20, 2024 9:00 AM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier- PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: Re: [External]Re: IPP Renewed Potable Water System Hi Harrison, I will be focusing on the new treatment plant and storage tank to verify they will pass a Sanitary Survey Inspection. I've attached the question set below. Not everything will be applicable since some questions are about ongoing operation and maintenance. Please let me know if you have any further questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…19/23 On Mon, Aug 19, 2024 at 8:49 PM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Dani, As we prepare for your visit this week, is there anything specific you want out of this system walk or anything you want prepared prior to your visit? Iso's, P&ID's, etc. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, July 29, 2024 4:15 PM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts-PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: Re: [External]Re: IPP Renewed Potable Water System Great! Thank you Harrison! I've added this to my calendar. Our district engineer, John Chartier, is also planning on coming. I've also notified the Central Utah Health Department if they would like to join. Thanks! 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…20/23 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Fri, Jul 26, 2024 at 11:19 AM Harrison.Stinson <Harrison.Stinson@kiewit.com> wrote: Danielle, Sorry for just now getting back to you. After getting with my team, we can have you on site 8.22, 1pm would be the preferable time. For the water samples, we planned on collecting the samples after the chlorination flush to then send to the lab for testing. Best, Harrison Stinson Start Up Lead Field Engineer TIC – The Industrial Company (913)329-4223 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…21/23 Harrison.Stinson@ticus.com From: Danielle Zebelean <dzebelean@utah.gov> Sent: Thursday, July 18, 2024 6:44 AM To: Harrison.Stinson <Harrison.Stinson@kiewit.com> Cc: jchartier@utah.gov <jchartier@utah.gov>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Batts-PTR <Lance.Batts- PTR@ticus.com>; Brittany.James <Brittany.James@kiewit.com> Subject: [External]Re: IPP Renewed Potable Water System Hi Harrison, Thank you for the update. I would like to come conduct a final inspection on the facility. Right now I have availability August 12, 13, 19, 20, 21, and 22. I would be able to make it to the plant around 11 am or later any of those days. Do you have a timeframe for collecting the raw and finished water samples for the operating permit request? Will that be after the chlorination flush? Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…22/23 [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Tue, Oct 8, 2024 at 1:52 PM To: "Kylie.Alejos" <Kylie.Alejos@ticus.com> Cc: "jchartier@utah.gov" <jchartier@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Don.Smith-PTR" <Don.Smith@ipsc.com>, "Andrew.Dutson-PTR" <Andrew.Dutson@ipsc.com>, David Heaton <dheaton@centralutahhealth.org>, Eric Larsen <elarsen@centralutahhealth.org> Hi Kylie, Apologies I am out on a survey today and haven’t listened to your voicemail yet. I can give you a call when I head back this afternoon or evening. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:54 AM State of Utah Mail - IPP Renewed Potable Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1804848143840798988&simpl=msg-f:1804848143840798…23/23 Danielle Zebelean <dzebelean@utah.gov> Intermountain Power New Arsenic Treatment Plant OP Inspection 3 messages Danielle Zebelean <dzebelean@utah.gov>Mon, Jul 29, 2024 at 4:15 PM To: elarsen@centralutahhealth.org Cc: John Chartier <jchartier@utah.gov> Hi Eric, I will be doing a final inspection of Intermountain Power's new arsenic treatment plant on August 22 at 1 pm if you would like to join for that. No worries if not. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Eric Larsen <elarsen@centralutahhealth.org>Mon, Aug 5, 2024 at 4:24 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: David Heaton <dheaton@centralutahhealth.org>, John Chartier <jchartier@utah.gov> Hi Dani, Thank you for the heads up! I will not be able to make it myself, but I have CC'd my EH Scientist for the area, David Heaton, in case he is available and interested. I'll let him coordinate directly with you if he is interested. Again, thank you for reaching out! Eric Larsen, M.P.H., M.H.A., L.E.H.S. Director of Environmental Health Central Utah Health Department 70 Westview Drive, Richfield, UT 84701 435/896-5451 ext. 315 CentralUtahPublicHealth.org [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Tue, Aug 20, 2024 at 11:54 AM 5/29/25, 11:54 AM State of Utah Mail - Intermountain Power New Arsenic Treatment Plant OP Inspection https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-a:r-3705798155534338196&simpl=msg-a:r549966123279856…1/2 To: David Heaton <dheaton@centralutahhealth.org>, John Chartier <jchartier@utah.gov> Cc: Eric Larsen <elarsen@centralutahhealth.org> Hi David and John, Just got off the phone with the consultant for the expansion at intermountain power. They are behind schedule and will not be ready for a final inspection on Thursday. Harrison will let me know sometime next week when we can reschedule it to. Thank you for your understanidng. Be in touch soon! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:54 AM State of Utah Mail - Intermountain Power New Arsenic Treatment Plant OP Inspection https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-a:r-3705798155534338196&simpl=msg-a:r549966123279856…2/2 Danielle Zebelean <dzebelean@utah.gov> IPP New Water System 12 messages Trevor Johnson <Trevor.Johnson@ipsc.com>Thu, Oct 10, 2024 at 5:21 PM To: "dzebelean@utah.gov" <dzebelean@utah.gov> Hi Dani, Thank you for coming down and inspecting the system this afternoon. I want to make sure I remember all the items that TIC needs to fix. The only things I wrote down were a screen onthe potable water tank air vent, and create and air gap on the tank drain and the UF system discharge line. Is there anything I forgot? Thank You, Trevor Johnson Environmental Technical Analyst INTERMOUNTAIN POWER SERVICE CORP. A: 850 West Brush Wellman Road Delta, UT 84624 P: 435-864-6493 E: Trevor.Johnson@ipsc.com IPSC CONFIDENTIALITY NOTICE This e-mail transmission, and any documents, files or previous e-mail messages attached to it may contain information that is confidential or legally privileged. If you are not the intended recipient, or a person responsible for delivering it to the intended recipient, you are hereby notified that you must not read this transmission and that any disclosure, copying, printing,distribution or use of any of the information contained in or attached to this transmission is STRICTLY PROHIBITED. If you have received this transmission in error, please immediately notify the sender by telephone or return e-mail and delete the original transmission and its attachments without reading or saving in any manner. Thank you. Danielle Zebelean <dzebelean@utah.gov>Thu, Oct 10, 2024 at 5:41 PMTo: Trevor Johnson <Trevor.Johnson@ipsc.com> Hello! Yes I also need to double check the approved plans on the finished water tank to see if it has an internal overflow or else that will need an exception as well. Also if the tank was originallysupposed to be inside there may be an issue with the exception for the hatch. I’ll be able to look into that hopefully tomorrow or next week. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Fri, Oct 11, 2024 at 10:32 AMTo: Trevor Johnson <Trevor.Johnson@ipsc.com> Cc: "Kylie.Alejos" <kylie.alejos@ticus.com> Hi Trevor, So from the drawings (pg. 723 of submittal) I assume one of the internal standpipes is the overflow. Whichever line coming out of the tank is the overflow line will also need the 12-inches of clearance and a #4 screen. It looks like there is no access hatch on top so the exception for the shoebox style lid would still be valid. Can you confirm that there is not a hatch on top ofthe tank? 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…1/10 Please let me know if you have any follow up questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Fri, Oct 11, 2024 at 4:43 PMTo: Trevor Johnson <Trevor.Johnson@ipsc.com> Also, sorry for forgetting to send with my other email earlier. David Kruse is the person who is overseeing inorganic monitoring. His email is dbkruse@utah.gov Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Kylie.Alejos <kylie.alejos@ticus.com>To: Danielle Zebelean <dzebelean@utah.gov> Cc: "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-P Hello Dani, Our team is looking to coordinate the final permitting of the water system. Based on your initial inspection I believe there were only a few minor actions required before we can obtain the permmade a note on page 615 of the Potable Water Permit Submittal (yellow highlight in snap below) regarding the <12” of separation for the overflow. This is not possible due to the overflow and 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…2/10 In your image below, the overflow is nozzle D2 (near the top of the tank), however, the design changed slightly since the application was submitted. The drawing for the final tank design is atta internal riser). Additionally, I can confirm there is not a hatch on the top of the tank. Please confirm that this item is complete. We are working on confirming the bird screens and will send over photos once we are able. Kylie Alejos 269-235-0206 From: Danielle Zebelean <dzebelean@utah.gov>Sent: Friday, October 11, 2024 10:33 AM To: Trevor Johnson <Trevor.Johnson@ipsc.com>Cc: Kylie.Alejos <kylie.alejos@ticus.com> Subject: [External]Re: IPP New Water System Hi Trevor, So from the drawings (pg. 723 of submittal) I assume one of the internal standpipes is the overflow. Whichever line coming out of the tank is the overflow line will also need the 12-inches of clso the exception for the shoebox style lid would still be valid. Can you confirm that there is not a hatch on top of the tank? Please let me know if you have any follow up questions. Thanks! 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…3/10 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Thu, Oct 10, 2024 at 5:41 PM Danielle Zebelean <dzebelean@utah.gov> wrote: Hello! Yes I also need to double check the approved plans on the finished water tank to see if it has an internal overflow or else that will need an exception as well. Also if the tank was originally s hatch. I’ll be able to look into that hopefully tomorrow or next week. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Thu, Oct 10, 2024 at 5:21 PM Trevor Johnson <Trevor.Johnson@ipsc.com> wrote: Hi Dani, Thank you for coming down and inspecting the system this afternoon. I want to make sure I remember all the items that TIC needs to fix. The only things I wrote down were a screen on tdrain and the UF system discharge line. Is there anything I forgot? Thank You, Trevor Johnson Environmental Technical Analyst INTERMOUNTAIN POWER SERVICE CORP. 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…4/10 A: 850 West Brush Wellman Road Delta, UT 84624 P: 435-864-6493 E: Trevor.Johnson@ipsc.com [Quoted text hidden] 20024113-94.03.72-000114.03.VDR.03.01 (3).pdf207K Danielle Zebelean <dzebelean@utah.gov>To: "Kylie.Alejos" <kylie.alejos@ticus.com> Cc: "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-P Hi Kylie, Sorry I must have also misunderstood Patrick's response to my review comment back in May 2023. This will also require an exception that we can issue with the operating permit so that they do not get deficiencies during surveys. Please follow the process here to request an exception to thewater/exceptions-to-rule-requirements. The rules to reference are R309-545-13 and R309-545-10(d) Also yes I confirm my comments about the hatch exception are complete. Have a happy holiday! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] State of Utah Mail - IPP Renewed - Potable Water Permit.pdf449K Paul.Novogoratz <Paul.Novogoratz@kiewit.com>To: Danielle Zebelean <dzebelean@utah.gov>, "ddwpnf@utah.gov" <ddwpnf@utah.gov> Cc: "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-P Dani, Please see attached letter requesting the exception. I have also included ddwpnf@utah.gov on the “To” line as instructed in the link in your email below. Please advise if anything else is needed. Thanks, Paul PAUL NOVOGORATZ, P.E. Mechanical Engineer KIEWIT ENGINEERING GROUP INC. 8880 Penrose Lane., Lenexa, KS 66219 913-928-7000 Ext. 7443 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…5/10 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Friday, December 20, 2024 2:11 PMTo: Kylie.Alejos <kylie.alejos@ticus.com> Cc: Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Cory.McCleary <Cory.McCleary@kiewit.com>; Logan.Green <Logan.Green@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@Subject: Re: [External]Re: IPP New Water System Hi Kylie, Sorry I must have also misunderstood Patrick's response to my review comment back in May 2023. [Quoted text hidden] [Quoted text hidden] overflow_and_drain_exception_letter.pdf1001K Paul.Novogoratz <Paul.Novogoratz@kiewit.com>To: Danielle Zebelean <dzebelean@utah.gov>, "ddwpnf@utah.gov" <ddwpnf@utah.gov> Cc: "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-P Dani, Please see attached letter requesting the exception. I have also included ddwpnf@utah.gov on the “To” line as instructed in the link in your email below. Please advise if anything else is needed. Thanks, Paul PAUL NOVOGORATZ, P.E. Mechanical Engineer KIEWIT ENGINEERING GROUP INC. 8880 Penrose Lane., Lenexa, KS 66219 913-928-7000 Ext. 7443 From: Danielle Zebelean <dzebelean@utah.gov>Sent: Friday, December 20, 2024 2:11 PM To: Kylie.Alejos <kylie.alejos@ticus.com>Cc: Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Cory.McCleary <Cory.McCleary@kiewit.com>; Logan.Green <Logan.Green@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTR@ Subject: Re: [External]Re: IPP New Water System Hi Kylie, Sorry I must have also misunderstood Patrick's response to my review comment back in May 2023. 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…6/10 [Quoted text hidden] [Quoted text hidden] drain_and_overflow_exception_letter.pdf1001K Paul.Novogoratz <Paul.Novogoratz@kiewit.com>Fri, Jan 3, 2025 at 4:10 PMTo: DDW PNF <ddwpnf@utah.gov>, Danielle Zebelean <dzebelean@utah.gov> Hello. This is for the new potable water storage tank, tag number 9WSD-TNK-0001. Thanks, Paul From: mnewberry@utah.gov <mnewberry@utah.gov> On Behalf Of DDW PNF Sent: Friday, January 3, 2025 4:54 PMTo: Paul.Novogoratz <Paul.Novogoratz@kiewit.com> Subject: Re: [External]Re: IPP New Water System Paul, can you please verify which storage tank this exception request if for? Thanks, DDW PNF Team Division of Drinking Water Phone: (801) 536-4200 Fax: (801) 536-4211 drinkingwater.utah.gov [Quoted text hidden] [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Mon, Jan 6, 2025 at 10:26 AMTo: "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Kylie.Alejos" <kylie.alejos@ticus.com> Cc: "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR"<Lance.Batts-PTR@ticus.com>, John Chartier <jchartier@utah.gov> Thank you Paul! I will issue the exception with the operating permit. Is there an anticipated timeline for operating permit request? Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…7/10 On Fri, Jan 3, 2025 at 2:35 PM Paul.Novogoratz <Paul.Novogoratz@kiewit.com> wrote: [Quoted text hidden] Kylie.Alejos <kylie.alejos@ticus.com>To: Danielle Zebelean <dzebelean@utah.gov>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com> Cc: "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-P<Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com> Dani, To follow up on both bullet points 2 & 3 listed on the Checklist for Issuing Operating Permits, please be advised there are no as-built changes to the system drawings thatyou require additional documentation or if we can progress forward with these two requirements satisfied. Additionally, during your site walk we discussed the need to clarify that the overflow and drain for the Potable Water Tank had a bird screens installed. Please see the attasufficient. Finally, to answer your previous question on timeline, we intend to chlorinate the system, perform required testing, and submit final documentation for the operating perm Please let me know if you have any questions or if you require additional documentation. Kylie Alejos 269-235-0206 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, January 6, 2025 10:27 AM To: Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Kylie.Alejos <kylie.alejos@ticus.com> Cc: Cory.McCleary <Cory.McCleary@kiewit.com>; Logan.Green <Logan.Green@kiewit.com>; Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Lance.Bas-PTR <Lance. Subject: Re: [External]Re: IPP New Water System Thank you Paul! I will issue the exception with the operating permit. Is there an anticipated timeline for operating permit request? Dani Zebelean, P.E. Environmental Engineer III | Division of DrinkingWater M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Fri, Jan 3, 2025 at 2:35 PM Paul.Novogoratz <Paul.Novogoratz@kiewit.com> wrote: Dani, Please see attached letter requesting the exception. I have also included ddwpnf@utah.gov on the “To” line as instructed in the link in your email below. 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…8/10 Please advise if anything else is needed. Thanks, Paul PAUL NOVOGORATZ, P.E. Mechanical Engineer KIEWIT ENGINEERING GROUP INC. 8880 Penrose Lane., Lenexa, KS 66219 913-928-7000 Ext. 7443 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Friday, December 20, 2024 2:11 PMTo: Kylie.Alejos <kylie.alejos@ticus.com> Cc: Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Cory.McCleary <Cory.McCleary@kiewit.com>; Logan.Green <Logan.Green@kiewit.com>; Dustin.Delozier-PTR <Dustin.Delozier-PTSubject: Re: [External]Re: IPP New Water System Hi Kylie, Sorry I must have also misunderstood Patrick's response to my review comment back in May 2023. This will also require an exception that we can issue with the operating permit so that they do not get deficiencies during surveys. Please follow the process here to request an exception to water/exceptions-to-rule-requirements. The rules to reference are R309-545-13 and R309-545-10(d) Also yes I confirm my comments about the hatch exception are complete. Have a happy holiday! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov [Quoted text hidden] [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:18125710593502622…9/10 2 attachments IMG_0880.jpg1382K IMG_2435.jpg 2120K Danielle Zebelean <dzebelean@utah.gov>Fri, Jan 31, 2025 at 12:05 PMTo: "Kylie.Alejos" <kylie.alejos@ticus.com> Cc: "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Cory.McCleary" <Cory.McCleary@kiewit.com>, "Logan.Green" <Logan.Green@kiewit.com>, "Dustin.Delozier-PTR"<Dustin.Delozier-PTR@kiewit.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, John Chartier <jchartier@utah.gov>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com> Thank you Kylie, The pictures attached are sufficient to show those are taken care of. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - IPP New Water System https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1812571059350262242&simpl=msg-f:1812571059350262…10/10 Danielle Zebelean <dzebelean@utah.gov> IPP Renewed New Water System - Water Quality Data & Chlorination 8 messages Kylie.Alejos <Kylie.Alejos@ticus.com>Thu, Apr 17, 2025 at 3:21 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov>, "Cory.McCleary" <Cory.McCleary@kiewit.com> Dani, Please see the attached Water Quality Data and Sample Reporting for the chlorination and testing of the new potable water system at the IPP Renewed Power Project. Our understanding is that this should be the final portion of the operating permit submittal for the system. Just a reminder, TIC is the General Contractor for the project and has placed the system in service. However, IPP is the end user, and the operating permit will only belong to them. Let me know if there is anything else that you need from us at this time. Thanks, Kylie Alejos Startup Lead Field Engineer IPP Renewed TIC – The Industrial Company Cell: (269) 235-0206 IPP Potable Water Operating Permit Sample Results.pdf 6483K Danielle Zebelean <dzebelean@utah.gov>Thu, Apr 17, 2025 at 3:27 PM To: David Kruse <dbkruse@utah.gov> 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…1/6 See attached analysis results for the IPP (#14050) new arsenic removal treatment plant. Let me know if you have any questions! Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] IPP Potable Water Operating Permit Sample Results.pdf 6483K Danielle Zebelean <dzebelean@utah.gov>Mon, Apr 21, 2025 at 8:49 PM To: "Kylie.Alejos" <Kylie.Alejos@ticus.com> Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov>, "Cory.McCleary" <Cory.McCleary@kiewit.com> Thank you Kylie, I am waiting on our source inorganics manager to confirm the arsenic sampling results. Another thing to note, we’ve changed our exception request process since the request was sent in. I will fill out the form with the information provided previously and send to IPP for approval. I am in St. George for the WEAU conference and sanitary surveys this week but I believe I’ll have time to get that handled in between. Please let me know if you have any questions. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Cory.McCleary <Cory.McCleary@kiewit.com>Fri, May 2, 2025 at 8:00 AM To: Danielle Zebelean <dzebelean@utah.gov> 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…2/6 You don't often get email from dzebelean@utah.gov. Learn why this is important Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov> Good morning Dani, Kylie has been assigned to a new project and I will be supporting the efforts of getting the potable water permit from this point forward. Has there been further progression on the permit, and/or do you need anything else from me or my team to ensure this permit is completed? Thanks, Cory McCleary Resident Mechanical Engineer IPP Renewed Work: 913-928-7660 Cell: 402-676-1683 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Monday, April 21, 2025 8:50 PM To: Kylie.Alejos <Kylie.Alejos@ticus.com> Cc: Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Sco.Blair <Scott.Blair@kiewit.com>; Briany.James <Brittany.James@kiewit.com>; Natalee.Brake <Natalee.Brake@ticus.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; jchartier@utah.gov; Cory.McCleary <Cory.McCleary@kiewit.com> Subject: [External]Re: IPP Renewed New Water System - Water Quality Data & Chlorinaon Thank you Kylie, I am waiting on our source inorganics manager to confirm the arsenic sampling results. Another thing to note, we’ve changed our exception request process since the request was sent in. I will fill out the form with the information provided previously and send to IPP for approval. I am in St. George for the WEAU conference and sanitary surveys this week but I believe I’ll have time to get that handled in between. Please let me know if you have any questions. Thanks! 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…3/6 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Fri, May 2, 2025 at 4:19 PM To: "Cory.McCleary" <Cory.McCleary@kiewit.com> Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov> Hi Cory! Sorry it’s been a busy two weeks for me. I need to fill out a new exception request form then send that to IPP to sign. Kylie has gotten me everything needed I believe for the operating permit. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Mon, May 5, 2025 at 8:55 AM To: David Kruse <dbkruse@utah.gov> Here you go! Back to the top! [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…4/6 You don't often get email from dzebelean@utah.gov. Learn why this is important IPP Potable Water Operating Permit Sample Results.pdf 6483K Cory.McCleary <Cory.McCleary@kiewit.com>Wed, May 7, 2025 at 11:38 AM To: Danielle Zebelean <dzebelean@utah.gov> Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov> Good morning Dani, I hope you're doing well! I just wanted to follow up to see if you’ve had a chance to submit the exception request form. Please don’t hesitate to reach out if there’s anything I can do to support the process. We do have some pending work that depends on the permit being finalized, so I appreciate any updates you can share. Thank you again for your help! Cory McCleary Resident Mechanical Engineer IPP Renewed Work: 913-928-7660 Cell: 402-676-1683 From: Danielle Zebelean <dzebelean@utah.gov> Sent: Friday, May 2, 2025 4:19 PM To: Cory.McCleary <Cory.McCleary@kiewit.com> Cc: Dusn.Delozier-PTR <Dustin.Delozier-PTR@kiewit.com>; Paul.Novogoratz <Paul.Novogoratz@kiewit.com>; Sco.Blair <Scott.Blair@kiewit.com>; Briany.James <Brittany.James@kiewit.com>; Natalee.Brake <Natalee.Brake@ticus.com>; Lance.Bas-PTR <Lance.Batts-PTR@ticus.com>; jchartier@utah.gov Subject: Re: [External]Re: IPP Renewed New Water System - Water Quality Data & Chlorinaon Hi Cory! Sorry it’s been a busy two weeks for me. I need to fill out a new exception request form then send that to IPP to sign. Kylie has gotten me everything needed I believe for the operating permit. 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…5/6 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov [Quoted text hidden] [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Wed, May 7, 2025 at 11:51 AM To: "Cory.McCleary" <Cory.McCleary@kiewit.com> Cc: "Dustin.Delozier-PTR" <Dustin.Delozier-PTR@kiewit.com>, "Paul.Novogoratz" <Paul.Novogoratz@kiewit.com>, "Scott.Blair" <Scott.Blair@kiewit.com>, "Brittany.James" <Brittany.James@kiewit.com>, "Natalee.Brake" <Natalee.Brake@ticus.com>, "Lance.Batts-PTR" <Lance.Batts-PTR@ticus.com>, "jchartier@utah.gov" <jchartier@utah.gov> Hi Cory, I sent the form to Trevor yesterday to be signed. Our inorganics manager also let me know yesterday that the arsenic samples were acceptable. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - IPP Renewed New Water System - Water Quality Data & Chlorination https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1829686351481044038&simpl=msg-f:182968635148104403…6/6 Danielle Zebelean <dzebelean@utah.gov> New Exception Form for Renewed Units 3&4 Storage 4 messages Danielle Zebelean <dzebelean@utah.gov>Tue, May 6, 2025 at 4:27 PM To: Trevor Johnson <Trevor.Johnson@ipsc.com> Cc: John Chartier <jchartier@utah.gov> Hi Trevor, Can you or whoever else needs to sign this exception request do so and send it back to me? This is for the request that was submitted back in January but we were waiting on the operating permit to issue it. Unfortunately, since then we changed our exception process. I've filled out the form using the information in the letter, feel free to change it as needed. Thanks! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 2 attachments Exception Request R309-545-13.pdf 1001K 13556 Exception Request R309-545-13 R309-545-10(1)(d).pdf 1320K Trevor Johnson <Trevor.Johnson@ipsc.com>Tue, May 6, 2025 at 4:41 PM To: Danielle Zebelean <dzebelean@utah.gov> I’m out of the office today Dani, but I’ll try getting it signed by someone and get it back to you tomorrow. Trevor Johnson Sent from my iPhone On May 6, 2025, at 4:30 PM, Danielle Zebelean <dzebelean@utah.gov> wrote: [Quoted text hidden] <Exception Request R309-545-13.pdf> <13556 Exception Request R309-545-13 R309-545-10(1)(d).pdf> IPSC CONFIDENTIALITY NOTICE 5/29/25, 11:55 AM State of Utah Mail - New Exception Form for Renewed Units 3&4 Storage https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-a:r-6130884693377870705&simpl=msg-a:r641970184856953…1/3 This e-mail transmission, and any documents, files or previous e-mail messages attached to it may contain information that is confidential or legally privileged. If you are not the intended recipient, or a person responsible for delivering it to the intended recipient, you are hereby notified that you must not read this transmission and that any disclosure, copying, printing, distribution or use of any of the information contained in or attached to this transmission is STRICTLY PROHIBITED. If you have received this transmission in error, please immediately notify the sender by telephone or return e-mail and delete the original transmission and its attachments without reading or saving in any manner. Thank you. Trevor Johnson <Trevor.Johnson@ipsc.com>Thu, May 8, 2025 at 4:07 PM To: Danielle Zebelean <dzebelean@utah.gov> Cc: John Chartier <jchartier@utah.gov> Hi Dani, TIC is looking into adding an airgap, so this may be a non-issue. As of right now we are not going to be signing this. Let me know if you have any other questions or concerns. Thank You, Trevor Johnson Environmental Supervisor INTERMOUNTAIN POWER SERVICE CORP. A: 850 West Brush Wellman Road Delta, UT 84624 P: 435-864-6493 E: Trevor.Johnson@ipsc.com [Quoted text hidden] [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Thu, May 8, 2025 at 4:16 PM To: Trevor Johnson <Trevor.Johnson@ipsc.com> Cc: John Chartier <jchartier@utah.gov> Thank you Trevor, However, I can't issue the operating permit unless this exception goes through. I am ok to wait on it if you want to add to an air gap before the operating permit. The other option is to sign it, get the operating permit, then we can resolve the exception once the air gap is there. Let me know what you want to do. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov 5/29/25, 11:55 AM State of Utah Mail - New Exception Form for Renewed Units 3&4 Storage https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-a:r-6130884693377870705&simpl=msg-a:r641970184856953…2/3 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - New Exception Form for Renewed Units 3&4 Storage https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-a:r-6130884693377870705&simpl=msg-a:r641970184856953…3/3 Danielle Zebelean <dzebelean@utah.gov> IPSC Drinking Water permit 2 messages Trevor Johnson <Trevor.Johnson@ipsc.com> To: Danielle Zebelean <dzebelean@utah.gov> Hi Dani, here are the pictures of the air gap and the screen on the pipe. Let me know if you need anything else. Thank you for all your help. Thank You, Trevor Johnson Environmental Supervisor INTERMOUNTAIN POWER SERVICE CORP. A: 850 West Brush Wellman Road Delta, UT 84624 P: 435-864-6493 E: Trevor.Johnson@ipsc.com 5/29/25, 11:55 AM State of Utah Mail - IPSC Drinking Water permit https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1833397658191226250&simpl=msg-f:183339765819122625…1/3 IPSC CONFIDENTIALITY NOTICE This e-mail transmission, and any documents, files or previous e-mail messages attached to it may contain information that is confidential or legally privileged. If you are not the intended recip copying, printing, distribution or use of any of the information contained in or attached to this transmission is STRICTLY PROHIBITED. If you have received this transmission in error, please imyou. Danielle Zebelean <dzebelean@utah.gov>Wed, May 28, 2025 at 3:12 PM To: Trevor Johnson <Trevor.Johnson@ipsc.com>Cc: John Chartier <jchartier@utah.gov> Excellent! Thank you Trevor! 5/29/25, 11:55 AM State of Utah Mail - IPSC Drinking Water permit https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1833397658191226250&simpl=msg-f:183339765819122625…2/3 Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 5/29/25, 11:55 AM State of Utah Mail - IPSC Drinking Water permit https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1833397658191226250&simpl=msg-f:183339765819122625…3/3