HomeMy WebLinkAboutDERR-2025-003997005 Stormwater catch basin and manhole access. Stormwater curbing. Looks low but they checked 2 or 3 times. theCollaborative 4350 4350 S 900 East, Millcreek, Utah 84124 Report number: 005 Date: November 18, 2024 10:00 Site Conditions: Temperature - 48 degrees and sunny Field Report - 4350 S 900 East Project Status Met with Juan & Duane (LL&L) regarding the excavation. As they progress with building A and B footing excavation they have not found questionable soils or concerns for further inspections. Met with RMP thinks we should have boxes and transformers onsite this week by 11/21. Met with JCorp to discuss completion of and responsibility of horizontals between both groups and timing. Site Observations ● All soils are being retained onsite as excavation continues from West to East. ● Clearing up a little confusion between Public Utilities and their engineers. RMP and Lumens is close to being removed from the site. Stormwater curbing. Looks low but they checked 2 or 3 times. Conduit to power Matt Strong's project being completed. Manhole at southwest corner of site.