HomeMy WebLinkAboutDDW-2025-004828 May 28, 2025 Sent via Email Only Jason Helm Granter-Hunter Improvement District PO Box 701110 Salt Lake City, Utah 84170 j.helm@ghid.gov Subject:Plan Approval, Watts Well No. 18 Water Line Project, UTAH18007 Distribution System (DS001); Granter-Hunter Improvement District, System #18007, File #21359 Dear Jason Helm:The Division of Drinking Water (the Division) received the plans and specifications for the proposed Watts Well No. 18 Water Line Project from your consultant, Garrick Stephenson and Hansen, Allen & Luce on April 29, 2025. Written review comments were provided to your consultant on May 1, 2025. The Division received the revised plans and specifications on May 5, 2025. This project has met the conditions for receiving a plan approval. Our understanding of the project includes the following: Approximately 1,340 linear feet of 18-inch diameter PVC water line to connect the proposed Watts Well #18 (WS020) with the existing UTAH18007 Distribution System (DS001) Approximately 170 linear feet of 30-inch diameter steel casing under the existing UTA TRAX lines We have completed our review of the plans and specifications, stamped and signed byGarrick Stephenson, P.E., dated April 24, 2025, and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for Watts Well No. 18 Water Line Project are hereby approved. This approval pertains to construction only. An Operating Permit must be obtained from the Director before Watts Well No. 18 Water Line Project portion of the UTAH18007 Distribution System (DS001) may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter. If you have any questions regarding this approval, please contact Rebecca Yoo, P.E., of this office, at (801) 388-3594, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager RY/mrn/mdbEnclosures –Operating Permit Checklistcc:Ron Lund, Salt Lake County Health Department, RLund@saltlakecounty.govEric Peterson, Salt Lake County Health Department, epeterson@saltlakecounty.govGarrick Stephenson, Hansen, Allen & Luce, gstephenson@halengineers.comMike Chambers, Hansen, Allen & Luce, mchambers@halengineers.comJeremy Gregory, Granter-Hunter Improvement District, j.gregory@ghid.govJason Helm, Granter-Hunter Improvement District, j.helm@ghid.gov, s.starr@ghid.org, r.perry@ghid.orgRebecca Yoo, P.E., Division of Drinking Water, ryoo@utah.govRYoo 18007 21359 GHID Well #18 to DS Connection Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment facility, or source