HomeMy WebLinkAboutDERR-2025-003949~lflTANK
ALUANCE. INC .
May 14, 2025
Utah Department of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 84116
gaharris@utah.gov
Dear Regulator:
~~~O\Yl~CID
MAY 2 3 2025
Environmental Response & Remed iation
Please find the attached copies of recent UST test results for the following locations:
Site# Address Date of Test Test (s) performed
Pilot# 0748 600 West 750 North, Willard UT 84340 4/22/25 Line Te st -emergency
Facility# 0100590
County : Box Elder
Official Test Report(s) Included
If there has been a change in personnel, address or you do not require test reports to be sent, or if you
would like for the reports to be emailed please let us know.
Should you have any questions or require additional information at thi s time , please do not hesitate
to call (614)923-0154.
Thank you,
~f?~
Sue Pelphrey
Special Projects Admin . Assist.
US Tank Alliance, Inc.
spelphrey@ustankalliance.com
7400SkylineDriveEast,SuiteA • Columbus ,OH 43235 • (614)923-0154 • Fax: (614)923-0111
www .ustankalliance .com
SERVICE ORDER SUMMARY
t'l:lTANK US TANK ALLIANCE. INC.
7400 Skyline Drive E., Suite A
AL LIANC E, INC. Columbus, OH 43235
Phone: (614) 923-0154 Fax: (614) 923-0111
Customer: Location:
Pilot Travel Centers, LLC Pilot# 0748
Attn: Joey Cupp Attn: Manager
5508 Lonas Road 600 West 750 North
Attention: Environmental Department Facility# 0100590
Knoxville, TN 37909 Willard, UT 84340
Customer Phone: (865) 588-7488 ext. Facility Phone: (435) 723-1010 ext.
Service Order# 0419874 Test Date: 4/25/2025
Invoice#: 0419874 Test Technician:
Customer PO #: Test Purpose: EMERGENCY
Disoatched For:
EMERGENCY -Line lghtness Test -DSL.
COMPLIANCE RETEST -Leak Detector Retest -DSL T3 .
UST SYSTEM TESTING STAGE fl TESTING OTHER ACTIVITIES
Tank □ Pressure Decay □ PVVentCap □ Helium Pin point Test LJ
Line/LO/Impacts □ Healy □ Blockage □ Residential Tank Test □
Containment □ Air-to-Liquid □ GPM I Flow Rate □ ATG Certification □
Cath. Protect. □ Other Stage II □ CPSuNey □
Other Activities □
Notes/Comments:
EMERGENCY -The DSL 22 Satellite Line Failed.
rrhe DSL Lines (All, an d 22SAT) Passed.
COMPLIANCE RETEST -The DSL T3 Mechanical Line Leak Detector Retest Passed.
rrested by : Precision Testing Technolog ies, Inc . Tech: Max LaRou UT-412 .
Other:
Reviewed By: Andrew Beveridge
EZY CHEK SYSTEMS TEST DATE 104/25/2025
;~ fffe~~:f~o 15'•' PRODUCT LINE TESTER Testing Company Information
..:J ~ T+ :?" • DATA SHEET Name Precision Testinq Technoloqies, Inc. . I ""Systems & Train ing '1v J for the
Address 2026 W. Elk Creek Crt. '-Petroleum Industry
Facility ID# 0100590 Box Elder County City Bluffdale , UT
Test Location Information Phone 801-886-9224
Name Flying J #7 48
Address 600 W 750 N Technican Information
City Willard, UT Name Max Larou
Phone 805-206-5269 Cert# UT-412
Contact Andrew Beveridge
Applied Pressure 160 psi
#1 Product Type: DSL (All, sans 22Sat.) #2 Product Type: DSL 22 Sat.
TIME DATA -/+ GPL RES GPH TIME DATA -/+ GPL RES GPH
0 82 0 0.0037 0.0000 0.0000 0 70 0 0.0037 0.0000 0.0000
15 80.5 Ts 0.0037 0.0055 0.022~ ----0.088i 15 64 -6 0.003 7 0.0222
30 80 .5 -0-0.0037 0 0 --30 58 -6 0.0037 0 .0222 0 .088i ----
0.0037 45 52 -6 0.0037 0 .0222 0 .088i --
0 .0037 60 46 -6 0.0037 0.0222 0.088i --------
0.0037 0.0037 --------
FINAL RESULT: PASS FINAL RESULT: FAIL
#3 Product Type: #4 Product Type:
TIME DATA -/+ GPL RES GPH TIME DATA -/+ GPL RES GPH
0 0.0037 0.0000 0.0000 0 0.0037 0.0000 0.0000 --------
0.0037 0.0037 --------0.0037 0.0037 --------0.003 7 0.0037 --------
0.0037 0.0 037 --------
0.0037 0.0037 --------
FINAL RESULT: FINAL RESULT:
#5 Product Type: #6 Product Type:
TIME DATA -/+ GPL RES GPH TIME DATA -/+ GPL RES GPH
0 0.0037 0.0000 0.0000 0 0.0037 0.0000 0.0000 ------
0.0037 0.0037 --------0.0037 0.0037 --------0 .0037 0.0037 --------
0.0037 0.0 037 --------0.0037 0.0037 --------
FINAL RESULT : FINAL RESULT:
,.
APPENDIX C-9
MECHANICAL AND ELECTRONIC LINE LEAK DETECTORS
PERFORMANCE TEST
Facility Name: Flyi nq J #7 48 owner: Pilot Travel Centers, LLC.
Address: 600 W. 750 North Address: 5508 Lonas Road
City, State , Zip Code : Willard, UT 84340 City, State, Zip Code: Knoxville , TN 37909
Facility I.D. #: 0100590 Box Elder County Phone#: (865) 588-7488
Testing Company: Prec ision Testing Technologies Inc . Phone #: 801-886-9224 Date : 04/25/2025
This data sheet can be used to test mechanical line leak detectors (MLLD) and electronic line leak detectors (ELLO ) with submersible
turbine pump (STP ) systems. See PE I/RP1200, Sections 9.1 and 9.2 for test procedures.
Line Number 3
Product Sto red DSL
Leak Detector Manufactu rer VR
Leak Det ecto r Model FX1DV
Type of Le ak Detector IZI MLLD □MLLD □MLLD □MLLD □M LLD □MLLD
□ELLD □ELLD □ELLD □ELLD □E L LD □ELLD
MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG)
STP Full Operating Pressure 38
Che ck Valve Ho lding Pressure 30
Line Resiliency (ml) (li ne bleed back vol-
ume as measured from check va lve hold -300
ing pre ss ure to zero psig)
Step Th roug h Time in Second s (time the
MLLD hes itates at mete ring pressure
befo re going to full operating pressure 1
as measured from 0 psig wi t h no leak
induced on the line)
Metering Pressure (STP pressure when
18 simulated leak rate 3 gph at 10 ps ig)
Opening Time in Seconds (the time the
MLLD opens to allow fu ll pressure afte r 4
simulated leak is stopped )
Doe s the STP pressu re remain at or
below the metering pressure for at least ~Yes □No □Yes □ No □Yes □ No □Yes □ No □Yes □ No □Yes □ No 60 seconds whe n the simulated leak is
induced?
Do es the leak detector reset (trip) when IZI Yes □No □Yes □No □Yes □No □Yes □No □Yes □No □Yes □No the line pressure is bled off to zero psig?
Does the STP properly cycle on/off under ~Yes □No □Yes □No □Ye s □N o □Yes □No □Yes □No □Yes □No normal fuel system operation co nd itions?
A "No" answe r to ei t her of the above questions indicates the MLLD fa ils the test.
ELLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG)
STP Fu ll Op erating Pressure
How many test cycles are observed
before alarm/shutdown occu rs?
Do es the simulated leak ca use an ala rm ? □Ye s □No □Yes □ No □Yes □ No □Yes D No □Yes □ No □Yes □ No
A "N o" answer to the above question ind i-
cates the ELLD fa ils the test.
Does the simulated leak cause an STP □Yes □ No □Yes □ No □Yes □ No □Yes □ No □Yes □No □Yes □ No
shutdown? □NA □NA □NA □NA □NA □NA
Test Results 121 Pass □ Fail □Pass □Fail □P ass □ Fail D Pass □ Fail □Pass D Fail □ Pas s □ Fail
Comments:
Tester 's Name Max Larou UT-412 Tester 's Signature ~La,,,{!Bu