Loading...
HomeMy WebLinkAboutDDW-2025-004783John Chartier <jchartier@utah.gov> Snow College SOTD 1 message Brian Howarth <brian.howarth@snow.edu>Mon, Nov 18, 2024 at 2:50 PM To: "eqdwvsa@utah.gov" <eqdwvsa@utah.gov> Cc: Colt Smith <acsmith@utah.gov>, John Chartier <jchartier@utah.gov> I wanted to share our plans for installing our connuous disinfecon and Point-of-Entry (POE) connuous chlorine residual monitoring system at the Great Basin Staon #20064 next spring. We will be installing a liquid sodium hypochlorite injecon system, that will be placed in the exisng vault and chlorinate water before it enters the exisng tank. We will be installing the connuous chlorine analyzer in the first building in our system (POE). Our ancipated meline for this process will be in the spring of 2025, approximately the last week of May - 1st week of June all depending on how much snow we receive this coming winter and how soon we can gain access to the area. Our plans, both pre and post construcon will be to clean and scrub the water tank, sanize and flush the system, make the needed repairs that were noted during our Level 2 Assessment, (repairing a leaking tank supply line and replacing a faulty tank float). The US Forrest Service will be providing the providing the stamped drawings and the chlorinaon system, which once received, I will be subming to John Charer (DEQ Central Engineer) for approval. Once we are approved we will begin to install the new chlorinaon system. Please let me know if you have any queson. Thank you Brian Howarth Utility Systems Manager 150 College Ave Ephraim, UT 84627 Office (435) 283-7234 Cell (801)368-7326