HomeMy WebLinkAboutDDW-2025-004780Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Site Visit Date Surveyor Name
05/06/2025 Chris Martin
TRAPPERS CROSSING
SUBDIVISION
PWS ID: UTAH29123 Rating:08/28/2018 Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: MELISSA
*Last Name: PORTERFIELD
*Organization:
*Address: Redacted
*City: HUNTSVILLE
*State: UT
*Zip: 84317
*Email: tcswatercompany@gmail.com
*Phone: 559-978-8800
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: TRAPPERS CROSSING
SUBDIVISION
*Address: PO BOX 361
*City: HUNTSVILLE
*State: UT
*Zip: 84317
*Email:
*Phone: 559-360-0575
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Melissa
*Last Name: Porterfield
*Organization:
*Address: PO Box 361
*City: Huntsville
*State: UT
*Zip: 84317
*Email: tcswatercompany@gmail.com
*Phone: 559-360-0575
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 1 of 19
Site Visit Info
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Matt
*Last Name: Summers
*Organization:
*Address: 7916 E 800 N
*City: Huntsville
*State: UT
*Zip: 84317
*Email:
summersandsummersllc@gmail.com
*Phone: 801-814-4608
5 Does the system serve a Residential population?Y
5A Population - Residential 40
5B Operating Period (Start Date) - Residential 01/01
5C Operating Period (End Date) - Residential 12/31
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
N
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
N
8 Population - Wholesale :0
9 Residential Connections:9 (Notes: 27 connections are planned with
only 9 connections currently in place.)
10 Commercial Connections:0
11 Industrial Connections:0
12 Agricultural Connections:0
13 Date of Survey (First Day of Field Work)05/06/2025
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
05/06/2025
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
05/21/2025
16 Water system representative present during the survey:Matt Summers, Melissa Porterfield
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
1
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
3
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
2
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 2 of 19
Management and Operations
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
2
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
D (Notes: The system has a concrete pad
but the generator hasn't been installed nor a
transfer switch for a portable generator.
However, the system has a 150K tank and
currently only 9 connections. Outdoor
watering is accomplished through a
separate pressurized irrigation system;
therefore, only indoor water demand is
required. The daily demand would be
approximately 7,200 gpd/ERC. The tank
could supply for at least 21 days while the
power issue is resolved. I would recommend
submitting for a temporary exception
renewable every 3 years. Then, install a
transfer switch in the near future.)
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
D (Notes: Still deficient. Need to submit
operating permit request for well source,
tank, distribution lines, and treatment
system. NSO due date is 545 days from
11/12/24.)
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
NA (Notes: Less than 100 connections)
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
N
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 3 of 19
Cross Connection and Operator Certification
31 Does your water system have an Emergency Response Plan?
REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop
contingency plans to cope with possible emergency situations. In many areas of the
state the possibility of earthquake damage shall be realistically considered.
N (Notes: No ERP developed.)
32 Does your Emergency Response Plan address cybersecurity? (only required for
systems over 3,300 population, otherwise mark NA)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
NA (Notes: Less than 3,300)
33 Does your water system use SCADA? e.g. computers, laptops, phones, tablets, or any
other computer systems to manage, operate, or maintain the PWS?
Y
34 Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
35 For a community water system or a non-transient non-community water system, did
you make your initial service line inventory available to the public? (if a transient
system, enter NA)
REC | 0pts | MR | R006 | 40 CFR 141.84 | (a)(8)The rule requires that the service line
materials inventory be publicly accessible. (a)(8)(ii) The rule requires that water
systems serving greater than 50,000 persons make the publicly accessible inventory
available online. (a)(9) The rule requires that when a water system has no lead,
galvanized requiring replacement, or lead status unknown service lines (regardless of
ownership) in its inventory, it may comply with the requirements using a written
statement, in lieu of the inventory, declaring that the distribution system has no lead
service lines or galvanized requiring replacement service lines. The statement must
include a general description of all applicable sources used to make this
determination.
N (Notes: There are no lead service lines so
nothing has been prepared for the public.)
36 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
37 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
C
38 Documentation of personnel trained to manage the program (ALL COMUNITY
WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM
ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM
BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C
39 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 4 of 19
General Maintenance and Environment
Distribution
40 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
41 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C (Notes: Matt Summers with Eden
Waterworks is now the operator.)
42 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
43 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
44 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
45 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
Y
45A Open end of vent line covered with #14 mesh screen
SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 5 of 19
45B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or
one foot above distribution line in a chamber that does not flood.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
45C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or
sump pump.
SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be
provided with a drain to daylight, if possible. Where this is not possible, underground
gravel-filled absorption pits may be used if the site is not subject to flooding and
conditions will assure adequate drainage. Sump pumps may also be considered if a
drain to daylight or absorption pit is not feasible. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
45D Open end of vent line down-turned.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
46 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C (Notes: This is managed through the
Huntsville Fire Department (Weber County
Fire))
47 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
48 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
49 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
50 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 6 of 19
General Disinfection
WS001 - TRAPPERS CROSSING WELL - Active
51 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
Y
51A Distribution system capable of maintaining the following pressures at all service
connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b)
30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand.
SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless
otherwise specifically approved by the Director, public water systems constructed after
January 1, 2007, shall be designed and shall meet the following minimum water
pressures at points of connection: (a) 20 psi during conditions of fire flow and fire
demand experienced during peak day demand; (b) 30 psi during peak instantaneous
demand; and (c) 40 psi during peak day demand. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
52 Water system follows AWWA disinfection procedures for new, repaired, or
depressurized seasonal water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
53 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
54 Is this facility Active or Inactive?A
55 Operating Period (Start Date)01/01
56 Operating Period (Ending Date)12/31
57 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
D (Notes: Still deficient. Need OP request.
NSO due date is 545 days from 11/12/24.)
58 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 7 of 19
59 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
60 Is the well casing vented? ... if yes, answer the following question(s)Y
60A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
60B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
60C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
61 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
61A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
61B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
61C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
62 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C (Notes: Mentioned collecting monthly
water level readings for long-term well level
monitoring.)
63 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 8 of 19
64 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
65 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
66 Hose connections are equipped with a backflow prevention device
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
67 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
68 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
69 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
70 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
71 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
72 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 9 of 19
ST001 - TRAPPER'S CROSSING 150K TANK - Active
73 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
73A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
73B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
73C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
74 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C (Notes: Well pumps to tank)
75 Does well require oil-lubrication?N (Notes: Submersible pump)
76 Is this facility Active or Inactive?A
77 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
150000
78 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
D (Notes: Tank needs an OP request similar
to the other facilities. This is not on the IPS
report but conditional plan approval was
granted under Division File# 7256. NSO due
date is 545 days from 11/12/24.)
79 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided where applicable.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 10 of 19
80 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
81 Are air vents present? ... if yes, answer the following question(s)Y
81A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
81B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
81C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
81D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
82 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
82A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
82B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 11 of 19
82C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
83 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
84 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
85 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
86 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
87 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
88 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
88A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
88B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 12 of 19
TP001 - TRAPPERS CROSSING WELL ARSENIC REMOVAL -- Treatment General - Active
88C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
89 Are the drain line and overflow combined?Y
90 Is this facility Active or Inactive?A
91 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
D (Notes: Still deficient. Need to submit
Operating Permit request for this facility.
NSO due date is 545 days from 11/12/24.)
92 Operating Period (Start Date)01/01
93 Operating Period (Ending Date)12/31
94 What is the objective of the treatment process and how do you know it is working?
(e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.)
Arsenic Removal
95 Walk me through the different process steps of your treatment plant. What is the
purpose of each step? Show me how you determine you are meeting your Treatment
Requirements.
See comments (Notes: Liquid sodium
hypochlorite is added before filtration to
oxidize the arsenic. The arsenic is then
captured in the pressure filter.)
96 What Chemicals are used? Why?See comments (Notes: 12.5% liquid sodium
hypochlorite.)
97 How is the chemical dose adjusted with flow and water quality? Prompts: What flow
rate is used for the adjustment (influent, effluent, CFE)? What water quality
parameters would make you change dose rate?
See comments (Notes: Yes, based on
Influent)
98 Does influent flow rate vary?Y
98A If yes, why does influent flow rate vary?VFD on well pump
98B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?Yes
99 Process control testing is consistent with the specific treatment process
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
100 There is a means to accurately measure the quantities of chemicals used.
SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for
measuring the quantities of chemicals used. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 13 of 19
101 Treatment plant properly secured to protect the quality of the treated water, R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
102 Are liquid chemicals used? ... if yes, answer the following question(s)Y
102A Proper cross-connection control is provided on the service water lines that feed the
solution tanks
SIG | 50pts | TR | TG53 | R309-525-11(9)(b)(i) | Rule requires cross connection control
to be provided to assure that the make-up waterlines discharging to solution tanks
shall be properly protected from backflow as required by the Utah Plumbing Code.
This significant deficiency must be corrected within 120 days of notification or have a
compliance action plan approved by DDW.
NA (Notes: Not a solution)
102B There are adequate spill containment provisions for acid and caustic liquids.
MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule
requires liquid chemical storage tanks to have an overflow and receiving basin or drain
capable of receiving accidental spills or overflows, and meeting all the requirements of
R309-525-23.
C
102C If there is a day tank, the bulk tank and day tanks have separate screened vents.
MIN | 15pts | TR | TG60 | R309-525-11(8)(b)(vi) | Rule requires acid storage tanks to
be vented to the outside atmosphere, but not through vents in common with day tanks.
NA (Notes: No day tank)
102D Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals or liquids
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
102E No direct connections exist between a sewer and drain or overflow from the feeder,
solution chamber, or tank.
SIG | 50pts | DS | M020 | R309-105-12(1) | Rule states that a water supplier shall not
allow a connection to his system which may jeopardize its quality and integrity. Cross
connections are not allowed unless controlled by an approved and properly operating
backflow prevention assembly. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
102F Chemical storage tank access opening properly covered?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
103 Treatment chemicals meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 14 of 19
TP001 - TRAPPERS CROSSING WELL ARSENIC REMOVAL -- Treatment - Chlorination General - Active
104 Are all chemical feeders properly verified for accuracy?
SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the
necessary amounts of chemicals at an accurately controlled rate, throughout the
anticipated range of feed. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
105 Spare parts are available for all chemical feeders
MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states
that a means consistent with the nature of the chemical solution shall be provided in a
solution tank to maintain a uniform strength of solution. Continuous agitation shall be
provided to maintain slurries in suspension. 2 dem
C
106 Incompatible chemicals stored separately
SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are
incompatible from being fed, stored, or handled together. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
107 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
108 Raw water compliance samples are collected before any treatment. R309-215-4(4)
SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i)
Y
108A If yes, was location shown?After wellhead
109 Where are finished water quality monitoring samples collected?After filtration
110 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the
proper disposal of treatment plant waste to land or water?
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
C
111 Which parameters are watched when running treatment plant?See comments (Notes: Chlorine residual,
pressure differential)
112 What type of alarm system is used?SCADA
113 Does treatment plant have a SCADA system?Y
113A Can operators respond to all alarms in a normal day, or do they have to silence
legitimate alarms?
Yes
113B How are alarm set points adjusted and how are changes recorded?Manually
114 Proper lab equipment on site to support required operations & maintenance of the
plant?
SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be
provided to assure proper operation and monitoring of the water plant. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
115 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 15 of 19
116 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
N
117 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
118 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
119 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: No dilution or dissolution)
120 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
121 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
122 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
123 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
124 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
124A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 16 of 19
TP001 - TRAPPERS CROSSING WELL ARSENIC REMOVAL -- Tablet Hypochlorination - Active
125 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
126 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C (Notes: On pump discharge)
127 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
127A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
127B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
127C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
127D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
127E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
128 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
129 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
130 Is this facility Active or Inactive?A
131 Hypochlorite dissolution equipment is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 17 of 19
TP001 - TRAPPERS CROSSING WELL ARSENIC REMOVAL -- Filtration - General
132 Hypochlorite tablets are stored in cool, dry and well ventilated area
MIN | 5pts | TR | TD72 | R309-520-7(3)(d)(iii) | Rule requires hypochlorite tablets to be
stored in accordance with manufacturer's safety guidelines and in their original
containers is a coll, dry, well-ventilated area.
C
133 Hypochlorite tablets are stored away from acid or combustible materials
SIG | 25pts | TR | TD73 | R309-520-7(3)(d)(iii) | Rule prohibits storage of hypochlorite
tablets near combustible materials or acids. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
134 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
135 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Less than 55 gallons)
136 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (a full eyewash station and
shower is not required)
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
137 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
138 Records are kept to minimize the use of decayed hypochlorite solution
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
139 Instrumentation and controls for the process are operational, and in service
SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify
that treatment processes are sufficient shall be properly calibrated and maintained. At
a minimum, this shall include turbidimeters. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
140 Is turbidity monitoring required? ... if yes, answer the following question(s)N
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 18 of 19
141 What is the maximum filtration rate throughout the year (in gpm/sf)?4
142 What criteria are used to determine when a filter backwash is needed?H
143 What criteria are used to determine filtration is functioning properly? (PSI, Turbidity,
Headloss, Flow rate, water quality parameter)
Headloss, WQ parameter
144 Criteria is used to determine filter loading rate meets the manufacturers
recommendations? R309-525-15(2) Explain in comments...
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
145 What criteria are used to determine if filter media needs to be replaced?Water quality parameter
146 Is backwash flow rate verified to determine it meets minimum requirements?
MIN | 15pts | TR | T076 | R309-525-15(7) | Rule requires that backwash systems be
designed and operated to
provide for adequate backwash with minimum media loss.
C
147 If system filters by Direct Filtration, the plant is configured to shut down automatically
when a source water exceeds 20 NTU for longer than 3 hours, or when the source
water turbidity exceeds 30 NTU at any time? R309-530-5(3)(g)
SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify
that treatment processes are sufficient shall be properly calibrated and maintained. At
a minimum, this shall include turbidimeters. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
NA (Notes: Not direct filtration)
DEQ | Drinking Water
Run Date: 05/21/2025 16:24:09 | Rating: UTAH29123 TRAPPERS CROSSING SUBDIVISION page 19 of 19