Loading...
HomeMy WebLinkAboutDWQ-2025-003475 StateofUtah SPENCERJ.COX Governor DEIDREHENDERSON LieutenantGovernor Department of EnvironmentalQuality Tim Davis Interim ExecutiveDirector DIVISIONOFWATERQUALITY JohnK.Mackey,P.E.Director [Date] PROVO CITY WASTEWATER TREATMENT PLANT EXPANSIONPUBLICNOTICEOFFINDING OF NO SIGNIFICANT IMPACT TOALLINTERESTEDGOVERNMENTALAGENCIESANDPUBLICGROUPS The Division of Water Quality (DWQ), Utah Department of Environmental Quality (DEQ), herewith publishes a Finding of No Significant Impact (FONSI) for the Provo Wastewater Treatment Plant ExpansionlocatedinProvo,UtahCounty,Utah.AnEnvironmentalAssessment(EA) was developed to examine potential environmental impacts associated with the project. AsrequiredbyguidelinesforpreparingEnvironmentalImpactStatements(EIS),anenvironmental review was performed on the proposed State of Utah, DWQ action below: PROJECTINFORMATIONPROJECT NAME:Provo Wastewater Treatment Plant ExpansionMAILING ADDRESS:1377 S 350 EProvo, UT 84606PROJECT LOCATION:1685 S 350 EProvo, UT 84606WATERCOURSES:Mill RaceESTIMATEDPROJECTCOST:$50,530,000PROJECTNUMBER:SRF278FEDERAL/STATE/LOCALSHARE:$7,000,000fromUtahWater Quality Board(Board)and$19,750,000inlocal contribution. 195North1950West•SaltLakeCity,UT Mailing Address:PO Box 144870 • Salt Lake City, UT84114-4870Telephone(801)536-4300•Fax(801)536-4301•TDD(801)536-4284 www.deq.utah.gov Printedon100%recycledpaper PERMITINFORMATIONFACILITYNAME:Provo City Water Reclamation FacilityMAILING ADDRESS:1377 South 350 EastProvo, UT 84606TELEPHONENUMBER:(801) 852-6780PERMITTEENAME:Provo CityPERMIT TYPE:Utah Pollutant Discharge Elimination SystemPERMITTEENO.:UT0021717PERMITTEENAME:ProvoCityPERMIT TYPE:Biosolids PermitPERMITNO.:UTL021717 BACKGROUND Provo City began major upgrades to their wastewater treatment plant in 2020, but due to constructioncost increases a portion of the project was delayed. This project will implement the third of three membrane bioreactors to improve the facility’s nutrient management.The discharge from this facility flows into Mill Race which ultimately discharges to Provo Bay. There will not be an increase of impacts from their current permit discharge requirements. Therefore, an Antidegradation Review was not necessary to perform for this project. TheBoardapprovedfundingforthisprojectbyauthorizinga$4,500,000loanat0.75%over20years and $2,500,000 as principal forgiveness. The rest of the balance of the project will be made up using local contribution of $19,750,000. Theproposedprojectwilloccurin a current construction site which has previously been disturbed.No wetland impacts are anticipated for the project. The proposed project would not modify or eliminateanyrecreationalopenspaceandwouldbeunlikelytoimpactanyagriculturallands.The project should not cause any increased impacts to air quality. The additional discharge should not significantly alter stream flow conditions or result in stream bank modifications. An EA was preparedbyWater Works EngineersaspartofProvo City’sCapitalFacilitiesPlan.TheEAevaluated the potential environmental effects and consequences of the proposed addition. ANNOUNCEMENT This notice announces the availability of the EA which is included in the 2020 Capital Facilities Plan1and the Budget and Phasing Plan2for public review and comment. Based on the information in the EA, as summarized here, DWQ determines that the proposed actionwillnotsignificantlyimpactwaterquality.Additionally,thereviewprocessdidnotindicate significantenvironmentalimpactswouldresultfromtheproposedaction.Thepreliminarydecision is to not prepare an EISand the DWQ is issuinga FONSIfor the proposed action. This action is taken on the basis of a careful review of the Capital Facilities Plan, environmental information documents, and other supporting information. These documents are available for public review online on the DWQ’s Public Notice Webpage. Comments supporting or disagreeing with this decision may be submitted for consideration by DWQ. After evaluating the comments received, DWQ will make a final decision. No administrative action will betaken on theproject forat least thirty (30)calendardays while advertising the FONSI, Capital Facilities Plan, and EA. QuestionsorcommentsmaybedirectedtoGeorge Meadosviaemailatwqcomments@utah.govor if necessary via telephone at (385) 232-1247. (Note: Please Include “Provo Wastewater Treatment Plant FONSI” in the subject line of any email) JohnK.MackeyP.E. ExecutiveSecretary,UtahWaterQualityBoard 1DWQ-2025-002860 2DWQ-2025-002862