Loading...
HomeMy WebLinkAboutDDW-2025-004609Utah Department Of Environmental Quality Division Of Drinking Water Admin Contacts Inventory Report Service Connections Treatment Plants JORDANELLE SSD PWS ID: UTAH26086 Rating: Approved 03/07/2003 Active Legal Contact JORDANELLE SSD MAX L COVEY PO BOX 519 10500 N 14200 W HEBER CITY, UT 84032 Phone: 435-671-2496 County: WASATCH COUNTY System Type: Community Population: 2,345 Site Updates Last Inventory Update: 01/06/2025 Last Surveyor Update: 08/06/2024 Surveyor: JULIE JENNIFER COBLEIGH Operating Period: 1/1 - 12/31 Last IPS Update: 01/21/2025 14:10:00 Consumptive Use Zone Irrigation Zone: null Date: Name Title Office Emergency Email COVEY, MAX L 435-654-9233 mcovey@jssd.us Type Meter Type Meter Size # Of Connections Residential Unknown 0.000 1797 Commercial Unknown 0.000 12 Industrial Unknown 0.000 1 Total Service Connections: 1810 ID Plant Name Bin Status Date Design Cap Status TP001 01 DEER CREST CHLORINATOR Inactive Treatment Purposes LIQUID HYPOCHLORINATION, POST TP002 DEER MTN WELL CHLORINATOR 0 Active Treatment Purposes LIQUID HYPOCHLORINATION, POST TP003 KEETLEY WTP 1 Determined 10/01/2018 16.000 MGD Active Treatment Purposes COAGULATION, FILTRATION, RAPID SAND, INHIBITOR, ORTHOPHOSPHATE, LIME - SODA ASH ADDITION, ON-SITE HYPOCHLORINATION, POST, ON-SITE HYPOCHLORINATION, PRE, RAPID MIX TP004 (DUPLICATE ENTRY) DEER MTN WELL CL2 Inactive Treatment Purposes HYPOCHLORINATION, POST TP005 TUHAYE WELL PUMP STATION CHLORINATOR Active DEQ | Drinking Water Run Date: 01/21/2025 15:04:03 | Rating: Approved UTAH26086 JORDANELLE SSD page 1 of 4 Storage Pumping Stations Treatment Purposes LIQUID HYPOCHLORINATION, POST TP006 VICTORY RANCH WELL LIQ CHLORINATOR Active Treatment Purposes ON-SITE HYPOCHLORINATION, POST TP007 (TCSSD PF001) RED LEDGES PMP STA CL2 Inactive Treatment Purposes TP008 VICTORY RANCH WELL #2 HYPOCHLORINATOR Active Treatment Purposes LIQUID HYPOCHLORINATION, POST TP009 FISHER RANCH WTP 0 3.000 MGD Proposed Treatment Purposes COAGULATION, FILTRATION, RAPID SAND, FLOCCULATION, ON-SITE HYPOCHLORINATION, POST, RAPID MIX, SEDIMENTATION ID Name Type Effective Volume Material Status Status Reason ST012 (DUPLICATE #26096) HWY 32 1.5 MG TANK Ground 1,500,000 GAL Concrete Inactive Sold/Transferred ST010 LADY MONUMENT TANK Ground 1,500,000 GAL Concrete Inactive ST011 VICTORY RANCH TANK Ground 500,000 GAL Concrete Active ST014 (NOT IN 26086) RED LEDGES TANK Ground 1,500,000 Concrete Inactive Sold/Transferred ST001 LOWER DEER CREST TANK Ground 500,000 GAL Concrete Active ST002 MID UPPER DEER CREST TANK Ground 75,000 GAL Concrete Active ST003 800K UPPER DEER CREST TANK Ground 800,000 GAL Concrete Active ST004 200K UPPER UPPER DEER CREST TANK Ground 200,000 GAL Concrete Active ST005 LOWER EAST PARK 1.1 MGD TANK Ground 1,100,000 GAL Concrete Active ST006 UPPER EAST PARK 500K TANK Ground 500,000 GAL Concrete Active ST007 BUTTE 850K TANK Ground 850,000 GAL Concrete Active ST008 DEER MOUNTAIN 850K TANK Ground 850,000 GAL Concrete Active ST009 TUHAYE 1.4 M TANK Ground 1,400,000 GAL Concrete Active ST013 DEER VISTA TANK Ground 500,000 GAL Concrete Active Op Issued - Check ST015 TWIN PEAKS Ground 500,000 GAL Concrete Inactive ST016 VICTORY RANCH TANK #2 Ground 250,000 GAL Concrete Active Op Issued - Check ST018 6800 TANK Ground 500,000 GAL Concrete Active ST019 MAYFLOWER TANK #1 Undergroun d 1,200,000 GAL Concrete Active Op Issued - Check ST017 MAYFLOWER TANK #2 Unknown 600,000 GAL Active Op Issued - Check ST020 BENLOCH RANCH 750 K TANK Undergroun d 750,000 GAL Concrete Active Op Issued - Check ST021 MAYFLOWER TANK #3 Undergroun d 600,000 GAL Concrete Proposed Total Effective Volume: 10,575,000 GAL DEQ | Drinking Water Run Date: 01/21/2025 15:04:03 | Rating: Approved UTAH26086 JORDANELLE SSD page 2 of 4 Sources ID Station Name Status Reason Capacity Availability PF001 HWY.32 PUMP STATION Inactive Op Issued - Check Permanent PF002 KEETLEY WTP PUMP STATION Active Op Issued - Check Permanent PF003 PUMP STATION #2 LOWER DEER CREST Active Op Issued - Check Permanent PF004 PUMP STATION #3 MID DEER CREST Active Permanent PF005 PUMP STATION #4 UPPER DEER CREST Active Permanent PF006 PUMP STATION #5 LITTLE BALDY BOOSTER Active Permanent PF007 PUMP STATION #6 EAST PARK Active Permanent PF008 PUMP STATION #7 BUTTE Active Permanent PF009 PUMP STATION #8 248 TUHAYE RANCH Active Permanent PF010 PUMP STATION #9 VICTORY RANCH Active Permanent PF011 (NOT IN 26086) RED LEDGES PUMP STATION Inactive Sold/Transferred Permanent PF012 DEER VISTA BOOSTER PUMP STATION Active Op Issued - Check PF013 TUHAYE WELL#1 PUMP STATION Active Op Issued - Check Permanent PF014 VICTORY RANCH PUMP STATION Active Op Issued - Check Permanent PF015 MAYFLOWER BOOSTER STATION Active Op Issued - Check PF016 FISHER RANCH WTP PUMP STATION Proposed PF017 6800 PUMP FACILITY Proposed Permanent PF018 BENLOCH RANCH PUMP STATION Proposed Permanent PF019 MAYFLOWER BOOSTER STATION #2 Proposed Permanent Total Capacity: 0 null ID Source Name OP Date Status Reason Source Type Water Type Period Of Op ST00X MAYFLOWER TANK Inactive Replaced Reservoir Surfacewater WS001 01 DEER CREST WELL 02/15/2001 Inactive Well Groundwater Flow Flow Rate UOM PUMP 123 GPM SYLD 123 GPM WS002 DEER MOUNTAIN WELL 02/14/2003 Active Well Groundwater 1/1 - 12/31 Flow Flow Rate UOM PUMP 120 GPM CYLD 89 GPM WS003 ONTARIO DRAIN TUNNEL INTAKE Active Intake Surfacewater 1/1 - 12/31 WS004 TUHAYE WELL #1 03/08/2005 Inactive Well Groundwater 1/1 - 12/31 Flow Flow Rate UOM SYLD 323 GPM PUMP 430 GPM DEQ | Drinking Water Run Date: 01/21/2025 15:04:03 | Rating: Approved UTAH26086 JORDANELLE SSD page 3 of 4 Site Visit History WS005 IROQUOIS WELL ABANDONED Inactive Abandoned Well Groundwater Flow Flow Rate UOM PUMP 0 GPM WS006 VICTORY RANCH WELL #1 11/04/2009 Active Well Groundwater 1/1 - 12/31 Flow Flow Rate UOM PUMP 1,200 GPM SYLD 1,573 GPM WS007 (ABANDONED) TUHAYE RANCH WELL #4 Inactive Abandoned Well Groundwater Flow Flow Rate UOM PUMP 600 GPM WS008 VICTORY RANCH WELL #2 05/08/2013 Active Op Issued - Check Well Groundwater Flow Flow Rate UOM SYLD 1,137 GPM TYLD 1,706 GPM PUMP 350 GPM WS009 PROVO INTAKE Proposed Intake Surfacewater 1/1 - 12/31 WS010 LADY MONUMENT WELL Proposed Well Groundwater WS011 MAYFLOWER MINE Proposed Intake Surfacewater WS012 MOTHER LODE WELL Proposed Well Groundwater Date Visited Survey Type Surveyor Notified Date Next Inspection 12/20/2004 Sanitary Survey, Finished SURVEYOR, DDW 09/29/2008 Sanitary Survey, Finished HILL, DWIGHT 09/30/2014 10/26/2009 Sanitary Survey, Finished MACAULEY, YING YING L 11/12/2009 09/30/2014 07/19/2010 Wellhead Protection Program JOHNSON, KATE 07/19/2010 10/31/2012 Sanitary Survey, Finished HILL, DWIGHT 11/07/2012 09/30/2014 11/05/2015 Sanitary Survey, Finished HARRY, CAMRON 11/05/2015 11/01/2018 Sanitary Survey, Finished TOMLINS, ZANE 11/29/2018 01/07/2020 Engineering Determination/Advice/Plan Review 01/07/2020 10/29/2020 Engineering Determination/Advice/Plan Review 10/29/2020 08/23/2021 Sanitary Survey, Finished COBLEIGH, JULIE JENNIFER 09/07/2021 12/31/2024 10/18/2021 Engineering Determination/Advice/Plan Review 10/18/2021 12/28/2021 Wellhead Protection Program 12/28/2021 12/07/2022 Engineering Determination/Advice/Plan Review 12/07/2022 08/06/2024 Sanitary Survey, Finished COBLEIGH, JULIE JENNIFER 08/23/2024 12/31/2027 DEQ | Drinking Water Run Date: 01/21/2025 15:04:03 | Rating: Approved UTAH26086 JORDANELLE SSD page 4 of 4