Holcim SWR, lnc.-Utelite is submitting the CAM Summary Report in accordance with Operating Permit provision
tt.B.2.a.3, 11.B.3.a.3, and 11.8.4.a.3. This certification covers operations trom tOlOLl2024 to 0313L12025.
As noted in the following Certification Statement, no deviations occurred during the six-month reporting period.
Should you have questions or require additional information please do not hesitate to contact me at
aaron.lund @holcim.com ot 7 02-27 4'4299.
Sincerely,
Aaron J. Lund C.E.M.
Environment & Land Manager, Mountain Region
Holcim SWR, lnc.
Holcim US, 1687 Colc Blvd., Suitc 300, Golden, CO 8(M01
Phone 30$98$1 070, www.holcim.com
DEPARTMENT OF
ENVIRONMENTAL OUAUTY
APR 1 1 2025
REVIEWEDInitials:Date: May 16, 2025Compliance Status:OKFile #: 10676 (B2)
To: Executive Secretary, Utah Air Quatity Board
From: Holcim-SWR Inc.
RE: CAM Summary Report for Permit # 4300001004
Date: April 11,2025
In accordance with Operating Permit provision 1I.8.2.a.3,II.B.3.a.3, and II.B.4.a.3 the
attached sunmary report is submitted.
This report covers the period from 1010112024 to 0313112025.
In accordance with Operating Permit provisions I.K and UAC R307-415-5d, and based
on information and belief formed after reasonable inquiry, I certifr that the statements
and information in this document are true, accurate, and complete.
Alex Judd, Operations Manager
tl,]1",ox o. o, *-oil.,r"
of a ResponsibleOfficial
Summary of Excursions & Monitoring Report
Facility: Holcim-SWR Inc.
Reporting Period: October 1,2024 through March 31,2025
Unit: Baghouse No. I
Excursions
Presence of Visible Emissions
Number:0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Instances of visible emissions exceeding l0% opacity: N/A
Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Monitor Downtime Incidents
Baghouse Pressure Monitor
Number: 0
Duration: N/A
Cause: N/A
Baghouse Temperature Monitor
Number: 0
Duration: N/A
Cause: N/A
Notes:
Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately
1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and
another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until
after the baghouse has been brought back online.
Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible
emissions, the opacity does not approach l0 oh. A full Method 9 observation is conducted within 24 hours of observing visible
emissions.
Summary of Excursions & Monitoring Report
Facility: Holcim-SWR Inc.
Reporting Period: October 1,2024 through March 3l'2025
Unit: Baghouse No.3
Excursions
Presence of Visible Emissions
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Instances of visible emissions exceeding l0% opacity: N/A
Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Monitor Downtime Incidents
Baghouse Pressure Monitor
Number: 0
Duration: N/A
Cause: N/A
Baghouse Temperature Monitor
Number: 0
Duration: N/A
Cause: N/A
Notes:
Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately
1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and
another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until
after the baghouse has been brought back online.
Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible
emissions, the opacity does not approach l0 o/o, A full Method 9 observation is conducted within 24 hours of observing visible
emissions.
Summary of Excursions & Monitoring Report
Facility: Holcim-SWR Inc.
Reporting Period: October 1,2024 through March 31,2025
Unit: Baghouse No.4
Excursions
Presence of Visible Emissions
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Instances of visible emissions exceeding l0% opacity: N/A
Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period)
Number: 0
Duration: N/A
Cause: N/A
Corrective Action: N/A
Monitor Downtime Incidents
Baghouse Pressure Monitor
Number: 0
Duration: N/A
Cause: N/A
Baghouse Temperature Monitor
Number: 0
Duration: N/A
Cause: N/A
Notes:
Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately
1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and
another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until
after the baghouse has been brought back online.
Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible
emissions, the opacity does not approach l0 yo. A full Method 9 observation is conducted within 24 hours of observing visible
emissions.