HomeMy WebLinkAboutDAQ-2025-002481O HoLcrM April 11,2025 Utah Division of Air Quality Director of Air Quality P.O. Box 14820 Salt Lake City, UT 841144820 RE: Holclm SWR,lnc.-utelite, Permht4:XXXl01m4, CAM Summary Report L0l0ll20z4througlr orltu2o2s Dear Director: Holcim SWR, lnc.-Utelite is submitting the CAM Summary Report in accordance with Operating Permit provision tt.B.2.a.3, 11.B.3.a.3, and 11.8.4.a.3. This certification covers operations trom tOlOLl2024 to 0313L12025. As noted in the following Certification Statement, no deviations occurred during the six-month reporting period. Should you have questions or require additional information please do not hesitate to contact me at aaron.lund @holcim.com ot 7 02-27 4'4299. Sincerely, Aaron J. Lund C.E.M. Environment & Land Manager, Mountain Region Holcim SWR, lnc. Holcim US, 1687 Colc Blvd., Suitc 300, Golden, CO 8(M01 Phone 30$98$1 070, www.holcim.com DEPARTMENT OF ENVIRONMENTAL OUAUTY APR 1 1 2025 REVIEWEDInitials:Date: May 16, 2025Compliance Status:OKFile #: 10676 (B2) To: Executive Secretary, Utah Air Quatity Board From: Holcim-SWR Inc. RE: CAM Summary Report for Permit # 4300001004 Date: April 11,2025 In accordance with Operating Permit provision 1I.8.2.a.3,II.B.3.a.3, and II.B.4.a.3 the attached sunmary report is submitted. This report covers the period from 1010112024 to 0313112025. In accordance with Operating Permit provisions I.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certifr that the statements and information in this document are true, accurate, and complete. Alex Judd, Operations Manager tl,]1",ox o. o, *-oil.,r" of a ResponsibleOfficial Summary of Excursions & Monitoring Report Facility: Holcim-SWR Inc. Reporting Period: October 1,2024 through March 31,2025 Unit: Baghouse No. I Excursions Presence of Visible Emissions Number:0 Duration: N/A Cause: N/A Corrective Action: N/A Instances of visible emissions exceeding l0% opacity: N/A Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 oh. A full Method 9 observation is conducted within 24 hours of observing visible emissions. Summary of Excursions & Monitoring Report Facility: Holcim-SWR Inc. Reporting Period: October 1,2024 through March 3l'2025 Unit: Baghouse No.3 Excursions Presence of Visible Emissions Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Instances of visible emissions exceeding l0% opacity: N/A Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 o/o, A full Method 9 observation is conducted within 24 hours of observing visible emissions. Summary of Excursions & Monitoring Report Facility: Holcim-SWR Inc. Reporting Period: October 1,2024 through March 31,2025 Unit: Baghouse No.4 Excursions Presence of Visible Emissions Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Instances of visible emissions exceeding l0% opacity: N/A Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes anFother 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 yo. A full Method 9 observation is conducted within 24 hours of observing visible emissions. REVIEWEDInitials:Date: May 16, 2025Compliance Status:OKFile #: 10676 (B2)