Loading...
HomeMy WebLinkAboutDSHW-2025-002480Close Window Print This Page MD - 0213 Miscellaneous Document Number MD - 0213 Owner Brian Speer Application Status Staff Review Program Solid Waste Updating the closure/post closure estimate that is due on June 22, 2025 Created By robert reynolds, 5/5/2025, 10:31 AM Last Modified By Brian Speer, 5/8/2025, 11:18 AM Files Landfill Closure Estimates Last Modified 5/5/2025, 10:33 AM Created By robert reynolds Activity History Email: Miscellaneous Document Submission Received Name Task Due Date 5/5/2025 Assigned To robert reynolds Last Modified Date/Time 5/5/2025, 10:33 AM Comments To: rob@rcsut.com CC: BCC: Attachment: --none-- Subject: Miscellaneous Document Submission Received Body: Dear robert reynolds, The purpose of this email is to inform you that the Division of Waste Management and Radiation Control received your miscellaneous document submission (MD - 0213) on 5/5/2025. Your application will be assigned to technical staff for review. If you have any questions, please contact the Solid Waste Program Manager, Brian Speer, by calling 801-536-0200. Email: Miscellaneous Document Submission Received Name Task Due Date 5/5/2025 Assigned To robert reynolds Last Modified Date/Time 5/5/2025, 10:33 AM Comments To: bspeer@utah.gov CC: BCC: Attachment: --none-- Subject: Miscellaneous Document Submission Received Body: Dear Brian Speer, The purpose of this email is to notify you that robert reynolds has submitted a miscellaneous Comments 5/16/25, 1:19 PM MD - 0213 ~ Salesforce - Unlimited Edition https://utahdeqorg.my.salesforce.com/a0meq000001vCwjAAE/p 1/2 document for review. The document number is MD - 0213. Please review the document and assign it to the appropriate staff member. Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 5/16/25, 1:19 PM MD - 0213 ~ Salesforce - Unlimited Edition https://utahdeqorg.my.salesforce.com/a0meq000001vCwjAAE/p 2/2 Table 1 Worst Case Closure and Post-Closure Bond Cost Estimate Description Unit Unit cost Dollars Quantity Cost Dollars *1 *2 *3 *4 Closure Costs Contractor Mobilization LS 500 4 2,000 Final Grading, Ditches and Swales FT 3.50 9,820 34,370 Final Cover Yd3 2.50 130,000 325,000 Hydroseeding Yd2 1,000 20 20,000 Pipe LS 12,000 QA/QC Soils Testing Ac 250 42 8,400 Perm Test 1 16,800 Closure Report and Certification LS 5,000 5,000 1 Deed Recording LS 500 500 1 Final Clean-Up/Building Removal LS 10,000 10,000 Cap Survey LS 5,000 5,000 Final Site Fencing and Security LS 15,000 15,000 Contingency 31,792.55 Total Exit Closure Site Costs 485,862.55 Post-Closure Costs Slope, Cap Repair and Maintenance LS 5,200 1 5,200 Drainage System Maintenance Activities LS 3,000 1 3,000 *5 Re -Seeding ac 1,500 1 1,500 Ground Water Monitoring LS 0 N/A Landfill Gas Monitoring 0 1 N/A Surface Water Monitoring LS 0 1 N/A Annual Reporting LS 6,700 1 6,700 Total Annual Post-Closure Costs 16,400 Total 30 Year Post-Closure Costs 492,000 Inflation Factor 273,706.45 Total Bonding Costs Closure and Post-Closure 1,257,569 *1 1-grader, 1-dozer, 2-scrapers *2 On-site material moved with scraper *3 8 boxes, 300 ft 8" pipe *4. American testing- attbg, proctor.moisture,density/compact-42 test *5. Site inspect, track, skid, 21ds soil.labor clean up