HomeMy WebLinkAboutDERR-2025-003702Citizens West 4 Construction Management Plan Prepared for the Utah Division of Environmental Response and Remediation (DERR) May 9, 2025 Project Overview and Existing Conditions The subject property, located at 515 W 300 N, Salt Lake City, UT 84116 (Parcel No. 08 - 36-305-082), is subject to an Environmental Covenant (EC) recorded on February 8, 2022. The EC was established when the parcel was historically associated with 509 W 300 N, Salt Lake City, UT 84116 (Parcel No. 08-36-305-079), in connection with a Leaking Underground Storage Tank (LUST) facility to manage residual contamination and mitigate potential risks to human health and the environment. The EC includes specific Activity and Use Limitations and construction-related requirements to ensure long-term protection of site users and environmental mitigation. Citizens West 4 LLC is currently pursuing redevelopment of the site, which includes the construction of a six-story mixed-use residential and retail structure, along with an open-air parking garage. This document outlines the proposed construction activiti es and demonstrates how the project has been designed to comply with the conditions set forth in the EC, including avoidance of excavation or structural components that would trigger applicable construction limitations or engineering control requirements. 1. Excavation Depth and Contaminant Zone Excavation in the area of petroleum-impacted soils will be limited to a maximum depth of 4’6” below ground surface (bgs), which does not trigger the first-level construction restriction. Refer to the attached detailed plan showing the location and depth of the proposed garage footings. The petroleum -impacted soils are located at a depth of approximately 10 to 15 feet bgs and will remain undisturbed. 2. Soil and Groundwater Disturbance No soil or groundwater removal is planned within the petroleum -impacted area. Groundwater levels at the site have been observed as high as 7 feet bgs during wet seasons. However, no construction activities are proposed to extend below 4’6” bgs in this area, ensuring no interaction with the water table or deeper contaminated soils. 3. Planned Construction and Site Use An open-air parking structure is proposed above the impacted area. This structure will not alter the current land use, as the area is presently utilized for surface parking. Per discussions with Mark Crimm and Paige Walton, no vapor mitigation systems are required due to the open -air nature of the design and the unchanged site use. 4. Soil Management and Disposal Protocol The site layout provides adequate space for temporary stockpiling of excavated soils pending the results of waste characterization analysis for contaminants found in the Phase 2 environmental report conducted by Terracon Consultants on May 26, 2023. Any soils determined to require special handling or disposal will be managed in accordance with applicable regulatory protocols and disposal requirements. Refer to the Materials Management Plan prepared by Terracon Consultants for more information. Construction and earthwork is anticipated to begin in June 2025. Footings and foundation for the parking garage which is located above the petroleum contaminated soils is expected to begin mid -August 2025 and complete by mid-September. Compliance with conditions set forth in the Environmental Covenant will be managed by Amanda Dillon and Ivan Carroll from Giv Development. X X X X X X X ss ss ss ss X D D D RDRDRDRDRDRDRDRD RD RD RD RD RD RD RD RD RD RD sd sd sd sd sd sd sd sd sd sd sd D sd sd D sd sd SD SD SD SD SD 42 3 9 . 6 9 42 3 9 . 0 1 4234.67 TBC 4237.19 TBC 50 0 W E S T S T R E E T (P U B L I C R O A D ) EX I S T I N G B U I L D I N G FF = 4 2 3 7 . 0 0 300 NORTH STREET (PUBLIC ROAD) EXISTING BUILDING EXISTING PEDESTRIAN BRIDGE (SHADED) 42 3 8 . 1 4 423 8 . 0 3 TO C 42 3 6 . 2 1 EXISTING BUILDING COMPLETED DURING PHASE 2 & 3 CONSTRUCTION FF=4241.63 TBC 40.36 TBC 40.46 4240.80 TBC 2.0% 1.8% 1.8% 42 3 7 . 0 5 42 3 7 . 0 6 42 3 7 . 0 3 EXIST SDCB #306 TOG=4239.59 FL(OUT-NW)=4238.40 EXIST 2'X2' CB #305 TOG=4239.34 FL(IN-E)=4236.34 EXIST SDCB #302 TOG=4238.96 FL(OUT-N)=4233.21 FL(IN-S)=4233.26 FL(OUT-W)=4236.43 FL(IN-SE)=4235.86 EXIST SDCB #301 TOG=4238.92 FL(IN-S)=4232.87 EXIST 36" PVC-SD 94.55 L.F. @ 0.36% SLOPE EXIST 36" PVC-SD 188.46 L.F. @ 0.54% SLOPE EXIST 24" CLASS III RCP-SD 26.98 L.F. @ 0.33% SLOPE EXIST 8" SDR-35 PVC-SD 34.50 L.F. @ 7.36% SLOPE INSTALL 12" HP STORM-SD 28.67 L.F. @ 0.77% SLOPE INSTALL 5' SDCO #312 WITH 12" FLAP GATE ON EAST SIDE RIM=4240.23 FL(OUT-N)=4234.28 FL(IN-S)=4234.28 FL(IN-W)=4234.28 EXIST 36" PVC-SD 231.08 L.F. @ 0.54% SLOPE 42 3 7 . 0 5 TOC 36.27 TOC 36.91 TO C 42 3 6 . 6 3 0" C . F . 42 3 6 . 6 5 4236.14 0" C.F. 1.8% BOS 40.70 TOC 37.00 TOC 37.05 TOC 37.32 42 3 6 . 2 0 42 3 6 . 7 3 42 3 6 . 0 2 TOC 37.00 TOC 37.00 TOC 37.00 TOC 37.00 TOC 43.20 TOW 43.19 TOC/TOW 43.20 TOC 41.46 TOC/HP 40.80 TOC 40.80 TOC 40.80 TO C 42 3 9 . 2 4 39.37 BOS 40.80 TOC TOC 39.44 TOC 40.55 TOC 40.80 TOC 40.53 TOC 40.80 TOC 40.57 TOC 40.69 TOC 40.80 TOC 41.11 37.25 TOC 39.84 TOW 40.80 TOC 39.75 TOW TOC 37.84 42 3 7 . 8 8 TOC 40.65 3. 1 % 1. 8 % 6.5% TOW 40.11 TOC 38.10 2 EXIST 2'X2' SUMP CB #341 TOG=4235.93 FL(IN-S)=4231.13 EXIST 18" N12 HDPE-SD 46.19 L.F. @ 0.09% SLOPE EXIST 2'X2' SUMP CB #342 TOG=4235.92 FL(OUT-N)=4231.17 FL(IN-S)=4231.12 EXIST 18" N12 HDPE-SD INSTALL 4' SDCO W/ ORIFICE PLATE #336 RIM=4240.97 FL(OUT-E)=4234.50 3 CURB & GUTTER INSTALLED W/ PHASE 2 & 3 CONSTRUCTION SIDEWALK INSTALLED W/ PHASE 2 & 3 CONSTRUCTION EXIS T . COU R T TBC 34.68 TBC 35.30 TBC 36.22 TBC 36.98 TBC 37.08 TBC 36.64 TBC 37.15 4238.56 TOC 5 5 38.46 FG 5 5 40.69 TOS 5 TOC 41.03 DOOR 43.19 5 5 4234 4235 4236 4237 4238 423 9 42 4 0 42 4 1 42 4 0 42 4 1 37.94 BOS40.72 TOS 39.97 TOW TOC 40.64 42 3 7 . 1 0 TBC 36.71 TBC 36.70 TBC 37.41 TBC 37.13 TBC 37.15 INSTALL SDCB #330 TOG=4236.34 FL(OUT-N)=4232.80 INSTALL 12" HP STORM-SD 79.22 L.F. @ 1.00% SLOPE INSTALL 2'X2' CB #345 TOG=4240.56 FL(OUT-S)=4234.79 FL(IN-E)=4234.79 INSTALL 12" HP STORM-SD 58.33 L.F. @ 0.50% SLOPE TOC 37.88 TOC 40.80 TOC 36.87 TOA 36.68 FF=4237.00 RIDGE TOC 36.604236 4237 4237 INSTALL 8" SDR-35 PVC-SD 19.28 L.F. @ 1.00% SLOPE INSTALL SDCB #357 TOG=4235.65 FL(OUT-NE)=4232.01 FL(IN-S)=4232.01 INSTALL 12" HP STORM-SD 14.56 L.F. @ 8.06% SLOPE CONNECT TO ROOF DRAIN SYSTEM #356 FL(OUT-W)=4235.96 TOW 36.76 TOC 36.78 0.5% TOC 36.79 TOC 36.80 3. 5 % 4 2 4 6 2. 2 % 2.1%7.5% TOW 43.14 TOC 36.76 PROPOSED BUILDING PROPOSED PARKING GARAGE MAIN=4236.50 ROOF=4246.80 6 6 41.63 FG 41.63 FG 40.80 TOW 39.30 TOC 40.38 TOC 39.93 TOC FF=4240.80 UTILITY AREA TBC 36.42 4. 0 % 7.2% 8.0% 7. 3 % 8. 0 % INSTALL SUMP PER DETAIL 10/C-600 #361 TOG=4235.89 FL(IN-SW)=4231.82 TBC 36.59 TBC 36.07 TBC 36.23 TBC 36.59 4236 RIDGE 1.5 % 2.1% 1.5% 1.6% 4240.16 EOA 4 2 4 0 . 2 3 E O A 4240.52 E O A EO A 42 3 9 . 3 9 TBC 40.63 TBC 40.03 4 2 4 3 4241 2 INSTALL SDCO W/ SLOTTED GRATE #329 TOG=4240.16 FL(IN-N)=4234.50 FL(IN-W)=4234.50 FL(IN-S)=4234.50 TOC 37.26 TOC 36.77 TOC 37.15 5 5 5 5 2.0% 1.9% 1.8% 1.9% 2.0% 1.9% TBC 39.83 FL 36.49FL 36.27 FL 35.59 FL 35.25 4.0%2.9%3.1% 3. 8 % SD TBC 36.56 TBC 36.87 TBC 37.06 TBC 37.19 SD sd EXIST 2'X2' CB #303 TOG=4241.32 FL(OUT-N)=4235.52 FL(IN-S)=4235.67 EXIST 36" HP STORM-SD CALL BLUESTAKES @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R BENCHMARK STREET MONUMENT INTERSECTION OF 400 NORTH 500 WEST SECTION 36, TOWNSHIP 1 NORTH, RANGE 1 WEST SALT LAKE BASE AND MERIDIAN ELEV = 4240.68' 801.561.1333 7583 So. Main Street #100 Midvale, Utah 84047 information@archbelgique.com CIVIL ENGINEER Ensign Engineering Contact: Michael Budge PHONE: (801) 255-0529 EMAIL: mbudge@ensignutah.com STRUCTURAL ENGINEER Wright Engineers Contact: Fan Zhou PHONE: (801) 352-2001 EMAIL: fzhou@wrightengineers.com MECHANICALPLUMBING ENGINEER Royal Engineering Contact: Chris Falsev PHONE: (801) 375-2228 EMAIL: chris.falsev@royaleng.com ELECTRICAL ENGINEER Royal Engineering Contact: Joe Hutchings LANDSCAPE ARCHITECT Landform Design Group Contact: Jeff Richardson PHONE: (801) 521-2370 EMAIL: jrichardson@landformdesigngroup.com INTERIOR DESIGNER Architecture Belgique Contact: Heather Cardall PHONE: (801) 561-1333 EMAIL: heather@archbelgique.com PHONE: (801) 375-2228 EMAIL: joe.hutchings@royaleng.com Ci t i z e n s W e s t P h a s e 4 51 5 W e s t 3 0 0 N o r t h Sa l t L a k e C i t y , U t a h Sheet Number Sheet Title Date TH E S E P L A N S A R E I N S T R U M E N T S O F P R O F E S S I O N A L S E R V I C E , A R E T H E I N T E L L E C T U A L P R O P E R T Y O F A R C H I T E C T U R E B E L G I Q U E , I N C . , A N D A R E P R O T E C T E D B Y C O M M O N L A W , S T A T U T O R Y A N D O T H E R R E S E R V E D R I G H T S I N C L U D I N G , B U T N O T L I M I T E D T O , C O P Y R I G H T . T H E Y M A Y N O T B E R E P R O D U C E D O R U S E D F O R A N Y P U R P O S E W I T H O U T T H E W R I T T E N C O N S E N T O F A R C H I T E C T U R E B E L G I Q U E , I N C . FEB. 12, 2025 No. Description Date HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.20 20 10 20 40 1. ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3. ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5. ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6. LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7. SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9. ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANS AND SPECIFICATIONS. 10. ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11. ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12. THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13. NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14. THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES GRADING AND C-300 DRAINAGE PLAN SEE SHEET C-301 FOR DETAILED GRADING AND DRAINAGE DESIGN IN PLAZA AREA 1 2 3 12" X 12" YARD DRAIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. RIM ELEVATION = 4240.60. CONNECT TO BUILDING ROOF DRAIN SYSTEM IN PARKING GARAGE. SEE MECHANICAL PLANS. UNDERGROUND DETENTION BASIN 45 ADS STORMTECH SC-800 CHAMBERS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. SEE DETAILS FOR CHAMBERS ON SHEET C-601. TOTAL STORAGE REQUIRED = 3,568 CF TOTAL STORAGE PROVIDED = 3,726 CF TOP OF STONE = 4237.75 TOP OF CHAMBERS = 4237.25 BOTTOM OF CHAMBERS = 4234.50 BOTTOM OF STONE = 4234.00 LID STORAGE REQUIRED = 1,171 CF (LOWER 1.21 FT OF BASIN TO RETAIN THE 80TH PERCENTILE STORM) LID STORAGE PROVIDED = 1,200 CF @ ELEV 4235.20 ORIFICE PLATE PER DETAIL 12/C-500 INSTALLED ON EAST SIDE OF STORM DRAIN BOX. DIA. = 1.85 INCH ORIFICE INVERT = 4235.20 12" X 12" YARD DRAIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. CONNECT TO GARAGE ROOF DECK PLUBLING SYSTEM AND ROUTE TO SITE DETENTION SYSTEM. MATCH INTO EXISTING PAVEMENT ELEVATIONS. SEE PLUMBING PLANS FOR CONTINUATION. SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: 4 5 6 SEE SHEET C-301 FOR DETAILED GRADING AND DRAINAGE DESIGN IN PLAZA AREA NR. 9125581-2202 L ICENSE D P R O F ESS IONAL EN G I N E ER S T ATE O F U T A H MICHAEL S. BUDGE 02/12/2025 Citizens West 4 Site Plan 6 66 10 10 6 6 10 10 F G H J 10 7 8 9 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CC3 CRW1 CR W 1 CR W 1 CR W 1 CRW1CRW1 CW-10A CW-10A CW -8A CW -10 C CW -10 A CW -8A CW -8A CW -10 A CW -8A CW-10BCW-10ACW-10B F8.5F8.5 F8.5 F8.5 4'-0" 106 S4.1 ___________ TYP. 12 106 S4.1 ___________ TYP. 4' - 6 " 8'-0" 4' - 6 " 3'-0" 4' - 6 " 4' - 6 " 3'-6" 3'-6" F5.0 FC3.0 FC 2 . 0 FC7.0A FC 2 . 5 FC 8 . 0 B FC 2 . 5 FC8.0A 5'-0"5'-0" FC 3 . 0 FC 2 . 0 14 14 FC7.0C 13 13 14 13 14 15 15 1515 111 S4.2 ___________ TYP. 13 101 S4.1 ___________ TYP. 14 14 14 111 S4.2 ___________TYP. FC 7 . 0 B 13 112 S4.2 ___________ 110 S4.2 ___________ 110 S4.2 ___________ 112 S4.2 ___________ 110 S4.2 ___________ 101 S4.1 ___________ TYP. 111 S4.2 ___________ TYP. CW-8A FC2.0 14 101 S4.1 ___________ TYP. 1' - 0 " 1'-0" 7 7 7 7 77 CR W 1 FOUNDATION PLAN KEYNOTES FOUNDATION PLAN NOTES REFER TO SHEET S0.21-S0.23 FOR FOUNDATION PLAN NOTES AND SCHEDULES CONCRETE PIER AT CENTER OF BANDED TENDONS1 REFER TO SHEET S0.25 FOR SHEAR WALL SCHEDULES AND ASSEMBLIES 2 TOP OF FOOTING ELEVATION IS AT 95'-0" AT THE ELEVATOR FOOTING. VERIFY w/ ARCHITECT AND ELEVATOR MFR. 3 TOP OF FOOTING ELEVATION IS AT 99'-0" 4 TOP OF FOOTING ELEVATION IS AT 98'-0" 5 TOP OF FOOTING ELEVATION IS AT 99'-4" 6 CONCRETE SHEAR WALL 7 CONTRACTOR TO VERIFY MAX. HEIGHT OF RETAINED SOIL w/ CIVIL 8 TOP OF FOOTING ELEVATION IS AT 93'-8" 9 TOP OF FOOTING ELEVATION IS AT 95'-0" 10 THE CONCRETE WALL IS NOT FULL HEIGHT PER ARCH'L 11 PROPERTY FOOTING AND ONLY EXTEND 18" FROM FACE OF THE CONCRETE WALL TO THE FACE OF THE FOOTING PER PLAN. CONTRACTOR VERIFY w/ CIVIL AND ARCHITECT TO MAKE SURE THE FOOTING DOES NOT PROTRUDE THE PROPERTY LINE 12 AT THE PARKING GARAGE, PROVIDE 6" THICK SLAB ON GRADE w/ #3 AT 18" o.c. E.W. w/ 2" CLEAR COVER FROM TOP OF SLAB 13 TOP OF FOOTING ELEVATION IS AT 94'-8" 14 TOP OF FOOTING ELEVATION IS AT 93'-8" 15 TOP OF FOOTING ELEVATION IS AT 95'-0" 9160 South 300 West, Suite 2 Sandy, UT 84070 phone (801) 352-2001 UT@wrightengineers.com wrightengineers.com ENGIN EEER D IN THE USA Las Vegas | Orange County | Phoenix | Salt Lake City | Dallas | Atlanta 801.561.1333 7583 So. Main Street #100 Midvale, Utah 84047 information@archbelgique.com CIVIL ENGINEER Ensign Engineering Contact: Michael Budge PHONE: (801) 255-0529 EMAIL: mbudge@ensignutah.com STRUCTURAL ENGINEER Wright Engineers Contact: Fan Zhou PHONE: (801) 352-2001 EMAIL: fzhou@wrightengineers.com MECHANICAL/PLUMBING ENGINEER Royal Engineering Contact: Chris Falsev PHONE: (801) 375-2228 EMAIL: chris.falsev@royaleng.com ELECTRICAL ENGINEER Royal Engineering Contact: Joe Hutchings LANDSCAPE ARCHITECT Landform Design Group Contact: Jeff Richardson PHONE: (801) 521-2370 EMAIL: jrichardson@landformdesigngroup.com INTERIOR DESIGNER Architecture Belgique Contact: Heather Cardall PHONE: (801) 561-1333 EMAIL: heather@archbelgique.com PHONE: (801) 375-2228 EMAIL: joe.hutchings@royaleng.com Ci t i z e n s W e s t P h a s e 4 51 5 W e s t 3 0 0 N o r t h Sa l t L a k e C i t y , U t a h Sheet Number Sheet Title Date TH E S E P L A N S A R E I N S T R U M E N T S O F P R O F E S S I O N A L S E R V I C E , A R E T H E I N T E L L E C T U A L P R O P E R T Y O F A R C H I T E C T U R E B E L G I Q U E , I N C . , A N D A R E P R OT E C T E D B Y C O M M O N L A W , S T A T U T O R Y A N D O T H E R R E S E R V E D R I G H T S I N C L U D I N G , B U T N O T L I M I T E D T O , C O P Y R I G H T . T H E Y M A Y N O T B E R E P R O D U CE D O R U S E D F O R A N Y P U R P O S E W I T H O U T T H E W R I T T E N C O N S E N T O F A R C H I T E C T U R E B E L G I Q U E , I N C . FEB. 12, 2025 S1.02 GARAGE FOUNDATION PLAN SCALE:S1.02 1/8" = 1'-0" 1 FOUNDATION PLAN GARAGE No. Description Date 02/12/2025 Given.the.same.logic.described.above,.the.bottom.of.these footings.will.be.4232.96,.so.these.footings.will require.excavation.of.approximately.4.feet.bgs. This is 6'4" below FF of the site at 4240.80, meaning 4234.46.The grading of the site shows the elevation of this area to be 4235.The footing depth is 2'6", therefore the bottom of the footing is at4231.96, so these footings will require excavation of approximately 3 feet bgs. Excavation for this footing is5'6" bgs. Excavation for this footing is5'6" bgs. Excavation for this footing is4'6" bgs. Excavation for this footing is5'6" bgs. Excavation for this footing is approx. 6 feet bgs. Excavation for this footing isapprox. 6 feet bgs. Petroleum impacted soil present10-15 feet bgs. Citizens West 4 Garage Footing Plan andPetroleum Contaminated Soil Area 5/7/25, 1:34 AMGiv Mail - Citizens West 4 Construction Management Questions Page 1 of 2https://mail.google.com/mail/u/1/?ik=39eabc5576&view=pt&search=a…msgid=msg-f:1829124548706131771&simpl=msg-f:1829124548706131771 Amanda Dillon <adillon@givgroup.org> Citizens West 4 Construction Management Questions Kevin Shannon <kshannon@wrightengineers.com>Fri, Apr 11, 2025 at 10:31 AM To: Garrett Thompson <garrett@archbelgique.com>, Alex Stoddard <alex@archbelgique.com>, "adillon@givgroup.org" <adillon@givgroup.org>, "ivan@givgroup.com" <ivan@givgroup.com>, "roberta@givgroup.com" <roberta@givgroup.com>, "michaelA@bonnevillebuilders.com" <michaelA@bonnevillebuilders.com>, "garrettr@bonnevillebuilders.com" <garrettr@bonnevillebuilders.com> Cc: Tom Allen <tallen@wrightengineers.com>, Emilie Brenchley <ebrenchley@wrightengineers.com> Good Morning, I will be assisting CW4 through plan check & CA alongside Emilie Brenchley, cc’d on this email. Regarding the parking garage footings, I spoke with Michael, and we got it figured out. The datum for the parking structure is a few feet lower than the building – after taking this into account this shows that these footings are above the water table. For all other items please feel free to reach out. Kevin Shannon, MS, SE Director at Wright Engineers 2 Venture Suite 200, Irvine, CA 92618 949-477-4001, x2366 kshannon@wrightengineers.com Structural engineers licensed in all 50 states From: Tom Allen <tallen@wrightengineers.com> Sent: Friday, April 11, 2025 8:23 AM To: Kevin Shannon <kshannon@wrightengineers.com>; Emilie Brenchley <ebrenchley@wrightengineers.com> Subject: FW: RE: Citizens West 4 Construction Management Questions Kevin and Emilie, Are you two covering this one? See below… 5/7/25, 1:34 AMGiv Mail - Citizens West 4 Construction Management Questions Page 2 of 2https://mail.google.com/mail/u/1/?ik=39eabc5576&view=pt&search=a…msgid=msg-f:1829124548706131771&simpl=msg-f:1829124548706131771 From: Garrett Thompson <garrett@archbelgique.com> Sent: Friday, April 11, 2025 8:16 AM To: Fan Zhou <fzhou@wrightengineers.com>; Alex Stoddard <alex@archbelgique.com> Subject: Fwd: RE: Citizens West 4 Construction Management Questions Fan, Amanda reached out with some questions. Can you take a look and confirm the footing depths for the garage? Thanks, [Quoted text hidden] -- Garrett Thompson Architecture Belgique, Inc. 7583 S. Main St. Suite 100 Midvale, UT 84047 Architecture Belgique, Inc. Hawaii 700 Bishop St. Suite 610 Honolulu, HI 96813 Office: 801.561.1333 Direct: 801.550.6216 Email:garrett@archbelgique.com Web: www.archbelgique.com