Loading...
HomeMy WebLinkAboutDDW-2025-004557System Name: System Number: Address: City, State, Zip: Name: Title: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: E-mail Address: Name: Duration (hrs): Phone No.: 8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]: Phone No.: 9. State or Federal Agency Funding: 8a. Is the project exempt from the Hydraulic Model Report requirement? [see R309-511-4(1)(a)(i) through (iv)] [ERC = Equivalent Residential Connection; SRF = State Revolving Fund] 3. Professional Engineer (PE) Responsible for System Oversight (if applicable) 4. Professional Engineer (PE) Responsible for Design of this Project Begin Construction: Complete Construction: 7. Anticipated Construction Schedule (if applicable): Advertise for Bids: 5. Local Fire Code Official & Required Fire Flow for Proposed Project For a new public water system (PWS) also complete a New PWS Application Form (see DDW website). 1. Public Water System (PWS) Information 2. Name and Address for Official Correspondence (Mayor, Public Works Director, Administrative Contact, etc.) Submit (preferably by email) the completed PNF with plans and specifications to DDW. Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200 Req'd flow (gpm): Loan # City, State, Zip: E-mail Address: PROJECT NOTIFICATION FORM (PNF) Utah Division of Drinking Water (DDW) Present No. of ERCs system is obligated to serve: No. of ERCs this project will add: Population Served: 6. Project Description (provide a unique facility name, location, and sufficient details to specifically identify the project): DDW - Plan Review File No.: DDW - Date Received: Please provide the following information for a proposed Public Drinking Water Project. Bid Opening: https://deq.utah.gov/drinking-water/plan-review-program-tools Checklists for use in preparing plans for review by DDW are available at: Yes No Drinking Water Board (SRF or FSRF) Community Impact Board (CIB) None Other (Specify) DDW- Eng-0004 Page 1 of 1 3/22/2018 The Indian Hollow Creek Water System will be located approximately 2.5 road miles to the northwest of Kamas, Utah. The system will consist of a new 135 gpm well and pump station which will pump through a dedicated 4" supply line to a new 250,000 gallon AWWA bolted steel tank. The tank is sized to provide 70,000 gallons of potable and irrigation storage and 180,000 gallons of fire flow (1,500 gpm for 2 hours). From the tank and its valve vault, water will be delivered to the distribution system via 1662 LF of 16-inch transmission line. The distribution system will consist of 4250 LF of 12-inch and 750 LF 8-inch piping with fire hydrants at 500 ft. max spacing with blow offs at the ends of the cul-de-sacs. A 300 gpm rated, VFD driven booster pump station in parallel with a 12-inch check valve will provide peak instantaneous potable and outdoor water with a minimum of 75 psi at the highest house during peak instantaneous demand condition (281 gpm) . Fire flow plus peak day flows (1600 gpm) will be provided thru the12-inch check valve, providing 21 psi or more to all points of connection on the system by gravity, no pumping required. Well No. 2 is being added act as a backup redundant supply to well No.1 and also to help supply irrigation water to some of the open spaces around the subdivision. Well No. 2 is expected to produce 100 gpm. Indian Hollow Creek Water Company Utah 22150 8186 South 1300 West West Jordan, Utah 84088 0 0 65 Matt Wride Director 8186 South 1300 West West Jordan, Utah 84088 (808) 290-7135 mwride@poulton.com Robert Rousselle P.E. Ensign Engineering 40 West 10000 South, Ste 500 Sandy, Utah 84070 801-859-4759 rrouselle@ensignutah.com Frederick C. Duberow P.E. Ensign Engineering 40 West 10000 South, Ste 500 Sandy, Utah 84070 801-243-9490 fduberow@ensignutah.com Kent Leavitt - South Summit Fire District Oakley, Utah 84055 435-640-4737 ssfd@allwest.net 1500 gpm 2 hours x x private complete complete 3/15/2025 9/30/2025 Note: The water supply, transmission, and distribution lines were all constructed in 2025. The remaining elements including the well pump station, the booster pump station and tank will be constructed in 2025. Note: Indian Hollow Well (WS001) is henceforth called Country Haven Well No. 1 (WS001).